Friday, January 08, 2016, 11:15, Laura Lambert, Ta, 41369-5, HP-SIS, Done, Temperature measurements
|
Aurelia Laxdal wrote:
Temperature measurements in progress this week for Ta HP-SIS. |
Thursday, November 21, 2019, 08:10, Aaron Schmidt, SiC, , HP-FEBIAD, In progress, Temperature mapping.
|
Thursday, November 21, 2019, 08:09: PS on. Leak issue resolved (Evap 2 Elog 466). Vacuum @ 4.10e-07T.
Thursday, November 21, 2019, 08:15: Auto-ramping TGHT / TBHT @ 2 A per min to 300 / 150 A. |
Tuesday, December 03, 2019, 08:24, Aaron Schmidt, , , LP-FEBIAD, In progress, Temperature mapping.
|
Tuesday, December 03, 2019, 08:15: Waterlines opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23: Unable to start due to flow trip? PS off.
Tuesday, December 03, 2019, 08:25: Turbo & Vac off. |
Wednesday, May 11, 2016, 17:24, John Wong, np-SiC, , TARGET BOAT, Done, Temperature Treament of Nanofiber SiC/PAN
|
Wednesday, May 11, 2016, 17:15
Nanofiber SiC (~50nm grain size)/PAN was prepared at UBC.
SiC 0.50g, DMF 9.0g, PAN 1.0g, tiny bit of SDS. |
Tuesday, October 08, 2019, 14:16, Aaron Schmidt, SiC, , HP-FEBIAD, In progress, Temp measurements.
|
Tuesday, October 08, 2019, 14:14: Remove Flex line HS.
HS: 42752-1
Waterlines not open yet. |
Friday, November 15, 2019, 13:26, Aaron Schmidt, SiC, , HP-FEBIAD, Problems resolved, Temp map testing - 1. (Leak issue)
|
HS 42752-5 - Setup for Temperature mapping.
Friday, November 15, 2019, 13:26: Roughing.
Friday, November 15, 2019, 13:36: Turbo pump on. |
Monday, June 17, 2019, 17:09, Marla Cervantes, , 49044-9, LP-SIS, Done, Target container calibration/conditioning
|
Monday, June 17, 2019, 17:04
A LP-SIS target container was wrapped with 3 heat shielding layers,
and an empty graphite insert of 17.4 g was introduce in it. |
Thursday, December 20, 2018, 10:27, Marla Cervantes, , 43630-6, , Done, Tantalum tube heating
|
Thursday, December 20, 2018, 10:24
A tantalum tube was loaded in evaporator 2 on Wednesday 19/Dec/2018.
It is going to be heated to 2000 C during 3 weeks |
Saturday, April 28, 2018, 16:12, John Wong, Empty, Tube container , , Done, TaC coating/sintering of Tube container
|
Saturday, April 28, 2018, 16:09
Container is coated with TaC and wrapped with TaC heatshield.
Will be used for carbonizing nanoSiC target materials. |
Thursday, October 25, 2018, 15:37, Marla Cervantes, TaC, 43044-7, LP-SIS, Done, TaC coating/sintering for graphite insert test
|
Thursday, October 25, 2018, 10:36
Container is coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Wednesday, October 31, 2018, 19:35, Marla Cervantes, TaC, 39530-1, LP-FEBIAD, Done, TaC coating/sintering for graphite insert test
|
Wednesday, October 31, 2018, 19:35
Container is coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Monday, November 19, 2018, 12:57, Marla Cervantes, Empty, 43630-7, , Done, TaC coating/sintering for graphite insert test
|
Monday, November 19, 2018, 08:57
Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Wednesday, January 16, 2019, 11:53, Marla Cervantes, TaC, 43630-2, , Done, TaC coating/sintering for graphite insert test
|
Tuesday, January 15, 2018, 17:30
Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Wednesday, April 03, 2019, 16:59, Marla Cervantes, TaC, 43630-5, , Done, TaC coating/sintering for graphite insert test
|
Wednesday, April 03, 2019, 16:57
Tantalum tube was coated with TaC and wrapped with Ta heat-shield (3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V). |
Friday, May 10, 2019, 16:58, Marla Cervantes, , 43943-1, , Done, TaC coating/sintering for graphite insert test
|
Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and wrapped with three tantalum sheets,
the tube was set in the EVAP2 to sinter the TaC coating. |
Wednesday, July 25, 2018, 17:33, John Wong, Empty, 43044-2, LP-SIS, Done, TaC coating/sintering for UCx#24
|
Wednesday, July 25, 2018, 17:32
Container is coated with TaC and wrapped with 3 layers of Ta heat-shields.
Desired sintering temperature ~1900 C, TGHT is estimated to be ~ 445A (3.3 kW), TBHT set to 230A (as usual). |
Monday, September 10, 2018, 15:09, Marla Cervantes, Empty, 42218-3, LP-IG-LIS, Done, TaC coating/sintering for UC target container
|
Monday, September 10, 2018, 15:09
Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Tuesday, September 04, 2018, 17:04, John Wong, Empty, , LP-SIS, Problems, TaC coating/sintering for UC target container
|
Tuesday, September 04, 2018, 16:58
Container is coated with TaC and wrapped with Ta heat-shield ( 3 layers)
Desired temp = 1900 C (expected TGHT ~445A/7.5V), TBHT will be set fixed at 230A (max). |
Friday, January 18, 2019, 15:11, Darwin Ortiz Rosales, Empty, 43044-5, LP-SIS, Done, TaC coating/sintering (training/online use)
|
Friday, January 18, 2019, 15:00
Container was coated with TaC and wrapped with 3 Ta heat shields.
Desired temp = 1900 C, Omega slope set = 0.990, Auto ramping TGHT at 1A/min to reach 400A, TGHT |
Sunday, May 24, 2020, 13:39, Marla Cervantes, Empty, 44139-11, LP-SIS, Done, TaC coating/sintering
|
Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max). |
|