Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 34 of 34  Not logged in ELOG logo
  ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  451   Wednesday, July 17, 2019, 11:13 Marla CervantesNb40282-4TARGET BOATDoneAnnealing of RRR-Nb test samples Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. 
  
  575   Tuesday, May 10, 2022, 14:43 Aaron Schmidt   MaintenanceActive TP removed / Swap / Slow start TP Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from
  
  658   Thursday, April 04, 2024, 12:07 Darwin Ortiz RosalesTiC LP TUBEDone240404TiC sintering/conditioningThursday, April 04, 2024, 12:06
Ta container tube, wrapped in 4 Ta
foil heat-shields, and  loaded    with _________
  
  657   Wednesday, April 03, 2024, 06:46 Darwin Ortiz RosalesTiC LP TUBEDone240402TiCWednesday, April 03, 2024, 06:46
 
Ta container tube, wrapped in 4 Ta
  
  656   Thursday, February 29, 2024, 07:40 Darwin Ortiz RosalesTiC LP TUBEDone240228TiC conditioningThursday, February 29, 2024, 07:40
Ta container tube, wrapped in 4 Ta
foil heat-shields, and  loaded  with _________
 TiC_240228_Conditioning_Temperature_vs_Current.png 
  655   Wednesday, February 21, 2024, 06:23 Darwin Ortiz RosalesTiC LP TUBEDone240220TiC conditioningWednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta
foil heat-shields, and  loaded with 201 D
  
  654   Wednesday, February 07, 2024, 22:49 Darwin Ortiz RosalesTiC44692-11LP TUBEDone240206TiC conditioning
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped
in 4 Ta foil heat-shields, and loaded with
  
  651   Thursday, December 14, 2023, 09:58 Darwin Ortiz RosalesSiC41369-2HP-SISDone231208SiC conditioningThursday, December 14, 2023, 09:53
Target left pumping down in Evap2
overnight. 
 Screenshot_2023-12-14_133432.png 
  650   Wednesday, December 06, 2023, 09:57 Darwin Ortiz RosalesSiC45447-4HP-FEBIADDone231204SiC conditioningWednesday, December 06, 2023, 09:47
Target number of foils:370
  
  613   Monday, March 06, 2023, 21:34 Darwin Ortiz RosalesSiC44692-3HP-SISDone230306SiC conditioningMonday, March 06, 2023, 21:29
Total number of foils:382
  
  593   Thursday, September 29, 2022, 10:02 Darwin Ortiz Rosales 44139-3TARGET BOATDone220926-Graphite conditioning in target tubeThursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields.
  
  34   Thursday, July 12, 2012, 17:55 John WongNiOtargetboat (TaC coated) Maintenance NiO development- test#2Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm,
 NiO_spray.PNGTGHT0-250A.png 
  529   Saturday, February 13, 2021, 08:14 Darwin Ortiz RosalesSiC41992-1TARGET BOATDone Sintering of SiC discs for SEM Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs
 Screenshot_2021-02-14_114713.png 
  477   Friday, March 13, 2020, 14:21 Darwin Ortiz RosalesSiC42218-8 HP-SISDone Conditioning of SiC discs (sintering) (RUSH) Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
  
  2   Thursday, July 21, 2011, 17:33 Pierre Bricault   Maintenance Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
  
  431   Thursday, February 21, 2019, 09:15 Darwin Ortiz RosalesEmpty42464-4HP-FEBIADDone Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields.
 190225EVAP2Trend.png190225EVAP2Trendb.png 
  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 
Monday, November 04, 2019, 14:19 
Each endcap is separated with
 Nov4CapCoating.PNG 
  487   Thursday, June 11, 2020, 13:01 Darwin Ortiz RosalesEmpty44139-12LP-SISDone  Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) 
 WO#_44139-12_TaC_sintering.PNG 
  567   Thursday, February 10, 2022, 08:58 Darwin Ortiz RosalesSiC HP-FEBIADDone Thursday, February 10, 2022, 08:52 
Total number of foils: 528 (
  
ELOG V2.9.2-2455