451
|
Wednesday, July 17, 2019, 11:13 |
Marla Cervantes | Nb | 40282-4 | TARGET BOAT | Done | Annealing of RRR-Nb test samples | Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. |
|
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551
Varian. SN: 202311 (Slightly active from |
|
658
|
Thursday, April 04, 2024, 12:07 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240404TiC sintering/conditioning | Thursday, April 04, 2024, 12:06
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with _________ |
|
657
|
Wednesday, April 03, 2024, 06:46 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240402TiC | Wednesday, April 03, 2024, 06:46
Ta container tube, wrapped in 4 Ta |
|
656
|
Thursday, February 29, 2024, 07:40 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240228TiC conditioning | Thursday, February 29, 2024, 07:40
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with _________ |
|
655
|
Wednesday, February 21, 2024, 06:23 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240220TiC conditioning | Wednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta
foil heat-shields, and loaded with 201 D |
|
654
|
Wednesday, February 07, 2024, 22:49 |
Darwin Ortiz Rosales | TiC | 44692-11 | LP TUBE | Done | 240206TiC conditioning |
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped
in 4 Ta foil heat-shields, and loaded with |
|
651
|
Thursday, December 14, 2023, 09:58 |
Darwin Ortiz Rosales | SiC | 41369-2 | HP-SIS | Done | 231208SiC conditioning | Thursday, December 14, 2023, 09:53
Target left pumping down in Evap2
overnight. |
|
650
|
Wednesday, December 06, 2023, 09:57 |
Darwin Ortiz Rosales | SiC | 45447-4 | HP-FEBIAD | Done | 231204SiC conditioning | Wednesday, December 06, 2023, 09:47
Target number of foils:370 |
|
613
|
Monday, March 06, 2023, 21:34 |
Darwin Ortiz Rosales | SiC | 44692-3 | HP-SIS | Done | 230306SiC conditioning | Monday, March 06, 2023, 21:29
Total number of foils:382 |
|
593
|
Thursday, September 29, 2022, 10:02 |
Darwin Ortiz Rosales | | 44139-3 | TARGET BOAT | Done | 220926-Graphite conditioning in target tube | Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with
3 Ta heatshields. |
|
34
|
Thursday, July 12, 2012, 17:55 |
John Wong | NiO | targetboat (TaC coated) | | Maintenance | NiO development- test#2 | Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm, |
|
529
|
Saturday, February 13, 2021, 08:14 |
Darwin Ortiz Rosales | SiC | 41992-1 | TARGET BOAT | Done | Sintering of SiC discs for SEM | Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs |
|
477
|
Friday, March 13, 2020, 14:21 |
Darwin Ortiz Rosales | SiC | 42218-8 | HP-SIS | Done | Conditioning of SiC discs (sintering) (RUSH) | Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm |
|
2
|
Thursday, July 21, 2011, 17:33 |
Pierre Bricault | | | | Maintenance | | Rick mentioned to me that the evaporator is
ready for the next steps of the commissioning
process.
|
|
431
|
Thursday, February 21, 2019, 09:15 |
Darwin Ortiz Rosales | Empty | 42464-4 | HP-FEBIAD | Done | | Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped
with 2 Ta heat shields. |
|
465
|
Monday, November 04, 2019, 14:25 |
Darwin Ortiz Rosales | Endcaps | 40282-4 | TARGET BOAT | Done | |
Monday, November 04, 2019, 14:19
Each endcap is separated with |
|
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) |
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( |
|
|