451
|
Wednesday, July 17, 2019, 11:13 |
Marla Cervantes | Nb | 40282-4 | TARGET BOAT | Done | Annealing of RRR-Nb test samples | Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples following cold-working and resistance measurements. Used to validate computational annealing model developed for SRF studies. For more information contact Norman Muller, x6398.
Desired temperature 1025 C.
Five Nb samples wrapped with Nb foil were set on a tantalum boat (coated with TaC)
the tantalum boat was wrapped with two tantalum sheets.
The boat was installed in the EVAP2.
The initial vacuum was IGP1 = 1.26e-6 Torr.
Ramping rate 5 A/min to final current of 200 A.
Wednesday, July 17, 2019, 11:18
At 155 A, the ramping rate was changed to 1 A/min
Wednesday, July 17, 2019, 11:28
The ramping was stopped at 167 A.
Wednesday, July 17, 2019, 11:57
Conditions:
IGP1 = 1.65e-6 Torr
TGHT = 2.54 V, 174.46 A
Temperature ~ 950 C
Wednesday, July 17, 2019, 18:07
IGP1 = 1.16 e-6
TGHT = 3.18 V, 206.7 A
Temperature ~950 C
Cooling ramp 10 A/min
Vented with air
Suggestion for future annealing:
Use tantalum boat without TaC coating. |
575
|
Tuesday, May 10, 2022, 14:43 |
Aaron Schmidt | | | | Maintenance | Active TP removed / Swap / Slow start TP | Tuesday, May 10, 2022, 14:42: TV551 Varian. SN: 202311 (Slightly active from BL1A - will not cross contaminate. Field only - Tagged) was removed as it was meant to be a temporary fix. Replacement (Refurbished) pump is to be installed. (Tomorrow - Use slow start function as per vacuum group)
Thursday, May 12, 2022, 13:30: Agilent TP & hardware installed.
SN: IT21381010
Thursday, May 12, 2022, 13:41: Roughing.
Thursday, May 12, 2022, 13:46: Halt.
Friday, May 13, 2022, 07:05: Roughing.
Friday, May 13, 2022, 07:18: TP1 on.
Friday, May 13, 2022, 07:23: Up to 14 KRPM. Pause/Halted startup (Whining?). Slow start w/ vacuum group.
Process to perform a TP slow start:
- Hold both top buttons on the controller for about 3 seconds
- Right Yes/No left to continue.
- Advance to soft start - 20 min.
- Back to remote start & go.
Friday, May 13, 2022, 08:26: TP1 on w/ slow start.
Friday, May 13, 2022, 08:39: 13 KRPM & climbing.
Friday, May 13, 2022, 09:10: TP at full speed. 38 KRPM. 0.5A 9w. This pump whines, but is operating fine. Likely will switch again when another is available. (It appears to have been dropped, Noted by Edi. Likely when shipped)
Friday, May 13, 2022, 09:14: TP off. Slow start function off. Back to normal function. |
658
|
Thursday, April 04, 2024, 12:07 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240404TiC sintering/conditioning | Thursday, April 04, 2024, 12:06
Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with _________ D shaped discs in a 12mm graphite cartridge with usable 11mm
conditioning tube WO = 44692-13 (4th conditioning with this tube)
End-caps on the graphite cartridge have holes for outgassing. One spring each end in the Ta container
initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Mas current~400A (1900 C)
Friday, April 05, 2024, 09:04
Ramping to 85A done and pressure trending down. Will continue ramp to 120A
Friday, April 05, 2024, 16:01
Starting rampdown at -2A/min
IGP1= 3.2e-06 Torr
|
657
|
Wednesday, April 03, 2024, 06:46 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240402TiC | Wednesday, April 03, 2024, 06:46
Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with _________ D shaped discs in a 12mm graphite cartridge with usable 11mm
conditioning tube WO = 44692-13
End-caps on the graphite cartridge have holes for outgassing. One spring each end in the Ta container
initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Wednesday, April 03, 2024, 06:49
initial IGP1= 1.28e-06 Torr
Wednesday, April 03, 2024, 09:26
IGP1= 2.3e-05 Torr
TGHT = 78 A, 1.3V
Will continue ramp as planned.
Wednesday, April 03, 2024, 11:37
Ramping at 2A./min to 400A
Wednesday, April 03, 2024, 14:01
expected 1900C at 401A
leaving at 402A for 4 hours. Rampdown start at 4:10 pm at -2A/min |
656
|
Thursday, February 29, 2024, 07:40 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240228TiC conditioning | Thursday, February 29, 2024, 07:40
Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with _________ D shaped discs in a 12mm graphite cartridge with usable 11mm
conditioning tube WO = 44692-13
End-caps on the graphite cartridge have holes for outgassing. One spring each end in the Ta container
initial heating @ 2A/min to 85 A then 2A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Thursday, February 29, 2024, 07:43
Initial IGP1= 9.31e-7 Torr
Thursday, February 29, 2024, 17:43
Temperature profile suggests 1900 C at 400A. Now at 400A. Will keep at this current for 4 hours.
manually ramped the last few amps.
TGHT= 400A, 7.3 V OMEGA = 1901C
Thursday, February 29, 2024, 22:20
IGP1=2.1e-6 Torr
started ramping down at -2A/min
|
Attachment 1: TiC_240228_Conditioning_Temperature_vs_Current.png
|
|
655
|
Wednesday, February 21, 2024, 06:23 |
Darwin Ortiz Rosales | TiC | | LP TUBE | Done | 240220TiC conditioning | Wednesday, February 21, 2024, 06:22
Ta container tube, wrapped in 4 Ta foil heat-shields, and loaded with 201 D shaped discs in a 12mm graphite cartridge with usable 11mm
conditioning tube WO = 44692-13
End-caps on the graphite cartridge have holes for outgassing. One spring each end in the Ta container
initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Wednesday, February 21, 2024, 09:12
IGP1 initial = 9e-07 Torr
Starte at 3A/min to 90A
Wednesday, February 21, 2024, 09:21
increased autoramp to 4 A/min until pressure starts rising, then will slow down or pause
Wednesday, February 21, 2024, 09:32
At 74A, paused. Will continue at 2A/min TGHT
Wednesday, February 21, 2024, 09:40
Pausing at 87A.
Wednesday, February 21, 2024, 10:34
pressure dropping. restarting ramp up to 120A at 2A/min
Wednesday, February 21, 2024, 10:37
From previous TiC 220206, will heat up fast until 250A and then at 1A/min until 300A to better resolve out-gassing profile
Wednesday, February 21, 2024, 12:05
Changed ramp to 1A/min to 300A
Wednesday, February 21, 2024, 13:10
Manually ramped up for a while
increased ramp speed to 2A/min
regression line started to match previous one after 1300C
Wednesday, February 21, 2024, 13:16
increased ramp rate to 4A/min to 420A
Wednesday, February 21, 2024, 13:37
Note: the temperature became unrealistic. suspect window condensate. Will use regression and to to 441A
Wednesday, February 21, 2024, 13:54
reached 441A, 7.6V
leaving for 3.5 hours or when pressure drops to 2-3 e-06 Torr
Wednesday, February 21, 2024, 18:56
IGP1=2.9e-06 Torr
starting rampdown at -2A/min |
654
|
Wednesday, February 07, 2024, 22:49 |
Darwin Ortiz Rosales | TiC | 44692-11 | LP TUBE | Done | 240206TiC conditioning |
Wednesday, February 07, 2024, 22:36
Ta container tube TaC coated, wrapped in 4 Ta foil heat-shields, and loaded with 320 D shaped discs in a 12mm graphite cartridge with usable 11mm
Endcaps on the graphite cartridge have holes for outgassing
initial heating @ 2A/min to 90 A then 1A/min to 120A TGHT
OMEGA slope = 0.99
Vacuum limits up to 400A: 5.0e-04 Torr -- 1.0e-02 Torr
Thursday, February 08, 2024, 06:18
Starting heat ramp tght
initial pressure = 8.1e-07 Torr IGP1
Thursday, February 08, 2024, 06:54
start of gasoff observed. paused ramp and will continue at 1A/min
Thursday, February 08, 2024, 07:24
lowered TGHT current to 75 A as pressure increasing too rapidly. will leave at this current until pressure drops
Thursday, February 08, 2024, 09:11
continuing ramp to 120A on TGHT
Thursday, February 08, 2024, 09:24
Increasing ramp to 2A/min to 250A on TGHT
Thursday, February 08, 2024, 10:52
Increased ramp to 3A/min to 250A on TGHT
Thursday, February 08, 2024, 11:10
Everything looks good will continue to 300 A at 3A/min TGHT
Thursday, February 08, 2024, 11:33
Pausing heating at 285A, 4.8V TGHT
OMEGA reads 1430C
Will let pressure drop and then proceed ramping slowly @ 0.2A/min
Thursday, February 08, 2024, 13:53
IGP1= 2.4e-06 Torr
OMEGA = 1432 C
ramp at 0.2A/min towards 1550C
Thursday, February 08, 2024, 14:07
pressure very stable. will increase to 0.4 A/min
Thursday, February 08, 2024, 15:24
increasing ramp rate to 1A/min
IGP1 = 2.5e-06 Torr
Thursday, February 08, 2024, 18:05
1900 C on OMEGA
will leave 3-4 hours depending on pressure
Thursday, February 08, 2024, 21:10
No additional pressure peaks observed and pressure on IGP1= 1.9e-06 Torr
TGHT= 460 A, 8.1V
OMEGA= 1860 C
ramp down at -2A/min
|
651
|
Thursday, December 14, 2023, 09:58 |
Darwin Ortiz Rosales | SiC | 41369-2 | HP-SIS | Done | 231208SiC conditioning | Thursday, December 14, 2023, 09:53
Target left pumping down in Evap2 overnight.
Initial weight including protective jig = 1474.3 g
Total number of target foils:388
10 analysis discs: 5x 220727-2 labelled as A and 5x 231123-2 labelled as B on the right side (front) of container. Order of discs ABABABABAB.
Total length packed 15.5 cm
container has 3 Ta heat shields including the inner made of three pieces as to cover the center block.
No endcaps inserted to facilitate out-gassing
Ta coated spring at both ends
ramp to 500A @ 1A/min TGHT and to 230A on TBHT
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 5.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 9.3e-07 Torr at start of initial ramp.
Thursday, December 14, 2023, 09:56
Started initial ramp up 1A/min on both heaters
Thursday, December 14, 2023, 11:03
Pressure dropping. Will increase ramp speed to 2A/min on both heaters (1A/30s)
Thursday, December 14, 2023, 11:17
pressure dropping. Increase ramp to 4A/min (2A/30s)
Will stop and ramping for temperature measurements
Thursday, December 14, 2023, 13:28
Increased ramp to 5A/min (2.5A/30s)
Will heat to 703A on TGHT and leave for 4 hours |
Attachment 1: Screenshot_2023-12-14_133432.png
|
|
650
|
Wednesday, December 06, 2023, 09:57 |
Darwin Ortiz Rosales | SiC | 45447-4 | HP-FEBIAD | Done | 231204SiC conditioning | Wednesday, December 06, 2023, 09:47
Target number of foils:370
Analysis discs 16 A and 16B interspersed on the end further from the laser
A are discs produced using new method and B are discs produced using milling.
Total length packed 16 cm (excluding the analysis discs)
container has 3 Ta heat shields (one inner around fins and center block, new type of 1st shield made up of three pieces)
No endcaps inserted to facilitate out-gassing
Ta coated spring at front end
ramp to 120A @ 1A/min TGHT and to 120A on TBHT hold there until pressure drop, then ramp to 500A on TGHT and 230A TBHT.
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 5.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 1e-06 Torr at start of initial ramp.
Wednesday, December 06, 2023, 09:56
System left to drop pressure over previous night and now at 120A. waiting for pressure drop.
Wednesday, December 06, 2023, 11:18
increased ramp rate to 2A/min
Wednesday, December 06, 2023, 14:41
increased ramp to 3A/min on TGHT and stopping to allow pressure to stabilize before taking temperature readings
Top temperature 1800C at 710 A but started dropping. Increased current to 750A and left there for 4 hours.
Cool down at -2A/min TGHT and -1A/min TBHT
|
613
|
Monday, March 06, 2023, 21:34 |
Darwin Ortiz Rosales | SiC | 44692-3 | HP-SIS | Done | 230306SiC conditioning | Monday, March 06, 2023, 21:29
Total number of foils:382 ( including 5 analysis discs on the right side of the container)
Total length packed 17 cm (excluding 5 analysis discs that will be removed)
container has 4 Ta heat shields (one inner only around fins)
No endcaps inserted to facilitate out-gassing
Ta coated spring at both ends
ramp to 500A @ 1A/min TGHT and to 230A on TBHT
max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 5.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 3e-06 Torr at start of initial ramp.
Tuesday, March 07, 2023, 07:23
IGP1= 1.2e-05 Torr
OMEGA = 1288 C
Tuesday, March 07, 2023, 10:01
Will ramp to 715 A and keep there for 4 hours. OMEGA readings not reliable beyond this point due to coating on EVAP2 window.
Tuesday, March 07, 2023, 11:10
TGHT = 715A, 11.0V
TBHT = 230A, 3.2V
OMEGA = 1750 C (but not reliable)
Maintaining for 4 hours then will ramp down @ -2A/min TGHT and -1A/min TBHT
Wednesday, March 08, 2023, 07:27
Final IGP1= 1.3e-07 Torr (before shutting down pumps) |
593
|
Thursday, September 29, 2022, 10:02 |
Darwin Ortiz Rosales | | 44139-3 | TARGET BOAT | Done | 220926-Graphite conditioning in target tube | Thursday, September 29, 2022, 09:57
A Ta container tube was wrapped with 3 Ta heatshields.
338 graphite discs were loaded.
one Tantalum cup (modified to fit losely) was inserted on the front end along with a Ta spring.
on the backside there is no spring but four discs glued together with PVA
The system was left to establish vacuum over night.
Good vacuum set to5e-04Torr
Bad vacuum was set to 5e-2 Torr
Total weight of system including springs = 249.07 g
OMEGA slope = 0.99
The target will be heated to 2100 C, held there for 10 hours. The target Temperature vs Power will be tabulated and the current required to reach 2100 will be extrapolated to avoid using OMEGA at higher temperatures.
a) The target will be removed, weighed and inspected
b) If the target boat is still good, run again at 10A higher than previous for 2 hours.
c) The target will be removed, weighed and inspected
d) i) If the weight is the same or negligible, experiment ends
ii) if the weight has decreased and target still intact, repeat from step b and document all measurements and settings
Thursday, September 29, 2022, 10:04
IGP1= 1.4e-04 Torr
TGHT= 80.0 A, 1.0V
Will allow pressure to drop and then continue heating
Thursday, September 29, 2022, 10:20
IGP1= 7.9e-05 Torr pressure on downward trend
Start heating at 2A/min to 200A
The target started dropping in temperature as current increased. Suspected OMEGA issue.
Started cooling at -2A/min
Will continue next week.
Monday, October 03, 2022, 11:05
Upon inspection, the window though which the OMEGA laser travels was coated with dark precipitate (mostly a spot in the direct path of the laser).
Cleaned the window and started pumpdown.
Monday, October 03, 2022, 12:57
start heating @2A/20s = 6A/min because the target had previously been heated past additive evaporation point.
IGP1= 3.8e-06 Torr
Monday, October 03, 2022, 18:41
Will heat to 500A and leave for 10 hours. The regression shows too high current to reach 2100. Not reasonable. So will work with 500A as a baseline.
Tuesday, October 04, 2022, 06:52
Temperature @500 A read 1742C
maintained for 10 hours
start rampdown at -2A/min
OMEGA currently 1099C
Current = 500 A
Voltage =9.9 V
IGP1= 5.9e-7 Torr
Tuesday, October 04, 2022, 21:32
Quartz window was completely covered with graphite like dust. final weight after heating = 244.57 g (a couple of discs came loose and they were weighed separately and not included in the next heating).
weighted target and added one extra heatshield because it looked like a lot of heat was escaping. Will treat at 500A again for 2 hours. The extra heat-shield should provide hotter environment.
new initial weight = 254.24 g (don't have a balance with greater precision .
Wednesday, October 05, 2022, 07:42
IGP1= 3.8e-07 Torr
ramping to 280A @ 3A/min
Wednesday, October 05, 2022, 11:40
ramping to 350 @ 3A/min
Then ramp to 500A
500A at 12:50
Wednesday, October 05, 2022, 15:52
ramping down at -2A/min
Thursday, October 06, 2022, 09:27
IGP1= 1.8e-07 Torr
Will dismount and weigh, then decide how to proceed
according to second regression, second heating was ~2000 C. OMEGA not reliable after 1700 C in this case.
Thursday, October 06, 2022, 12:34
The final weight after the second heating was = 254.19 g
reinstalled target and cleaned quartz window.
will heat up to 510 A
Friday, October 07, 2022, 07:46
IGP1= 3.0 e-07 Torr
ramp at 2A/min to 500A. will pause to take data points for regression.
Friday, October 07, 2022, 13:05
Start rampdown after two hours at 500A, 10.3V
-2A/min
|
34
|
Thursday, July 12, 2012, 17:55 |
John Wong | NiO | targetboat (TaC coated) | | Maintenance | NiO development- test#2 | Thursday, July 12, 2012, 17:29
NiO was sprayed on Ni foil.
Average/discs: mass= 0.075g, thickness=0.076mm, density = 7.023g/cm3.
4 set of samples were loaded onto the targetboat (coated/sintered with TaC). A piece of Ta foil was used as the under layer (see attachment #1).
A 0.002" thick Ta foil was wrapped around the container as the heat-shield.
The chamber was pumped down to 5.0e-6 Torr before the cooling water valve was opened; no leaks was detected.
For this process, the target heater will only go up to 250A (~1100C), with auto-ramping rate at 0.5A/min.
The heater has been stepped up to 50A, local 32A/ 0.23V. The vacuum reached to max 1.6e-5 Torr, and it's coming down.
Thursday, July 12, 2012, 17:51
Auto-ramping initiated...
Friday, July 13, 2012, 09:42
TGHT reached to 250A and stayed for 6 hrs (see attachment #2). At that current, the target wasn't glowing so the temperature could not be measured.
Initiated auto-cooling at 2A/min.
Friday, July 13, 2012, 11:00
TGHT reached to 65A. Stopped the auto-cooling process and manually tapped down the p/s to 0A.
Vacuum is stable at 5.7e-7 Torr.
In the next 30 min or so, the chamber will be vented and the NiO target material will be taken out for inspection.
|
Attachment 1: NiO_spray.PNG
|
|
Attachment 2: TGHT0-250A.png
|
|
529
|
Saturday, February 13, 2021, 08:14 |
Darwin Ortiz Rosales | SiC | 41992-1 | TARGET BOAT | Done | Sintering of SiC discs for SEM | Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs enclosed in graphite foil in pockets of 20. Sample A at both ends and sample B in the middle spaced out. Boat wrapped in Ta heat-shields (3 layers).
(A B B A)
Desired temperature= 1800C (expected TGHT approx 410 A).
good vacuum = 3.00 e-05 Torr
bad vacuum = 5.00 e-05 Torr
Evap2 left to pump down over previous night.
IGP1= 5.4e-7 Torr and stable
Initiating TGHT ramp up at 1 A/ min to 30 A
Saturday, February 13, 2021, 12:19
IGP1= 6.9e-06 Torr
Ramp to 50 A 1A/min
Saturday, February 13, 2021, 14:35
IGP1 = 6.4e-6 Torr
Pressure trending down.
Saturday, February 13, 2021, 14:56
IGP1= 4.9 e-6 Torr
Initiate Ramp up @ 1 A/min to 400 A
Changed ramp up to 0.5 A/min at around 11:30 pm
Sunday, February 14, 2021, 11:43
The current will be ramped up to 420 A according to the trendline approximation (see attachement 1)
Sunday, February 14, 2021, 12:26
IGP1 = 8.9 e-06 Torr and trending down
TGHT = 420 A, 7.5 V
OMEGA = 1730 C
Will ramp up to 428 A manually
Sunday, February 14, 2021, 12:30
Reached 428 A on TGHT.
OMEGA = 1760 C
Will bump to 430 A and hold for 4 hours
OMEGA= 1765 C
Sunday, February 14, 2021, 18:00
OMEGA = 1789 C
IGP1= 7.5 e -7 Torr
TGHT = 430.5 A , 7.8 V
Start ramping down at -1A/min to zero A
|
Attachment 1: Screenshot_2021-02-14_114713.png
|
|
477
|
Friday, March 13, 2020, 14:21 |
Darwin Ortiz Rosales | SiC | 42218-8 | HP-SIS | Done | Conditioning of SiC discs (sintering) (RUSH) | Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at both ends.
Initially to ramp TGHT and TBHT to 50A at 1A/min
Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically to reach 530A A (Omega slope set = 0.990)
Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then TGHT will be tapped up accordingly to reach desired Temp).
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Evaluation discs not included because no space.
Total Green disc mass measured = 58.78 g
Friday, March 13, 2020, 14:22
Container loaded and pressuring down started without any pump issues.
Friday, March 13, 2020, 23:26
IGP1= 9.1e-07 Torr
Start auto tap at .25A/min to 50A on both TBHT and TGHT
Saturday, March 14, 2020, 07:09
IGP1=6.9e-6 Torr
TGHT = 49.1 A, 0.58V
TBHT = 49.2A, .49V
Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr
Saturday, March 14, 2020, 08:22
IGP1=6.8 e-05 Torr
Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V
Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A
Saturday, March 14, 2020, 12:16
IGP1= 8.1e-05 Torr
start autoramp at 0.25A/min
Saturday, March 14, 2020, 17:47
IGP1= 2.9e-05 Torr
TGHT= 78.4A, 1.0 V
TBHT = 79.4A, .88 V
manual and automatic tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)
Sunday, March 15, 2020, 22:40
OMEGA = 1711 C
TGHT = 784,6 A, 12.9V (readback)
TBHT = 232 A, 3.5 V
Tap TGHT to 800 A readback set to 815A
Sunday, March 15, 2020, 23:20
OMEGA =1801 C
TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V
Start gradual tap-down as temperature rising (1810 C at end of this note)
Sunday, March 15, 2020, 23:49
OMEGAA = 1818 C
TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V
Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)
Monday, March 16, 2020, 04:10
OMEGA = 1395 C (not reliable)
TGHT = 799.2 A, 13.2 V
TBHT = 232.9 A, 3.6 V
IGP1 = 2.2 e-06 Torr
Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)
Monday, March 16, 2020, 09:43
TGHT = 0 A , 0.02V
TBHT = 53,2 A, .56 V (increase cooling to 4 A/min)
IGP1= 1.12e-07 Torr
Monday, March 16, 2020, 10:37
IGP1= 9.5 e -8 Torr
TGHT and TBHT = 0A, 0V
Will unload container
Monday, March 16, 2020, 12:40
Ten discs removed for evaluation (6 from left side and 4 from right side)
two graphite discs placed at each end as well as two TaC coated and sintered end-caps
total length after sintering = 17.8 cm
|
2
|
Thursday, July 21, 2011, 17:33 |
Pierre Bricault | | | | Maintenance | | Rick mentioned to me that the evaporator is ready for the next steps of the commissioning process.
In the chamber only the target leg heaters have current by-pass clamps on them.
The ionizer tube heaters do not have them because these lines do not have the same configuration as the others. The current by-pass clamps will
not fit these lines.
We may not need this for the commissioning, Rick will design and manufacture something for this when I get back from holiday.
The water is on in all circuits except for the power supply cooling circuit.
Pierre |
431
|
Thursday, February 21, 2019, 09:15 |
Darwin Ortiz Rosales | Empty | 42464-4 | HP-FEBIAD | Done | | Thursday, February 21, 2019, 09:01
Container coated with TaC and wrapped with 2 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down was started on Wednesday February 20th; however, this morning IEVAP2:TP1 and IEVAP2:BV1 were found in the OFF position.
There are no abnormal sounds from the roughing pump.
IGP1= 5.6e-2 Torr
Will turn on IEVAP2:BV1 and IEVAP:TP1 from the hot lab and listen for anything out of the ordinary.
Friday, February 22, 2019, 09:56
Pumped down to IGP1=2.1 e-07
Will tap up TGHT and TBHTmanually and monitor the pressure.
Friday, February 22, 2019, 11:20
Manually tapped up TGHT (V~ 0.90) and TBHT(V ~0.99) to 90A
maximum pressure reached ~7.4e-06 Torr and trended down
Friday, February 22, 2019, 11:25
Initiating Autoramp @ 0.2 A/min for TGHT to reach 450A and TBHT to reach 230A
Estimated temperature for TGHT ~1200 C
Friday, February 22, 2019, 15:42
TGHT @ 145 A and TBHT @ 138A
Changed Autoramp to 0.1 A/min so that it will take over the weekend to reach 450A and 230A for TGHT and TBHT respectively.
Monday, February 25, 2019, 08:29
IGP1=1.1e-07 Torr, TGHT= 451.4 A, 6.7 V, TBHT = 233.1 A, 3.1 V
Omega T = 1197 C
Will manually tap up by increasing TGHT current by ~1A/min monitoring pressure. Will allow system to stabilize ~1400 C.
Monday, February 25, 2019, 11:14
Trend forcast 1400 C at TGHT= 566.75 A (Line plot attached)
Actual but not stable ~1445-1452 C at 566 A
Will continue to manually increase current monitoring pressure
Monday, February 25, 2019, 12:33
Omega T= 1679 C , TGHT = 657.7A, 10.52 V, TBHT = 233.2 A, 3.2 V
IGP1 = 1.4e-05 Torr slightly trending up.
Autoramp @ 1 A/min to a maximum of TGHT 780 A.
Monday, February 25, 2019, 14:43
IGP1= 3.7e-06 Torr trending down slightly, TGHT = 780.3 A, 12.9 V
Omega T = 1931 C
Monday, February 25, 2019, 15:14
manually tap up to TGHT to 790 A
Monday, February 25, 2019, 15:36
IGP1= 2.9e-6 Torr trending down
TGHT = 784.3 A, 13.01 V
TGHT current set to 790 A
Omega T = 1940 C
Will leave over-night
Tuesday, February 26, 2019, 08:23
IGP1= 7.85e-07 Torr Stable
TGHT = 784.32 A, 12.54 V
TBHT = 233.3 A, 3.2 V
OMEGA T = 1948 C
Initiating Auto-cool ramp at 2.0A/min and 1.0A/min for TGHT and TBHT respectively.
Wednesday, February 27, 2019, 08:10
IGP1 = 3.3 e-08 Torr Stable
TGHT = 0A, 0.05V
TBHT = 0.02A, 0. V
Will begin vacuum release
|
Attachment 1: 190225EVAP2Trend.png
|
|
Attachment 2: 190225EVAP2Trendb.png
|
|
465
|
Monday, November 04, 2019, 14:25 |
Darwin Ortiz Rosales | Endcaps | 40282-4 | TARGET BOAT | Done | |
Monday, November 04, 2019, 14:19
Each endcap is separated with a disc of graphite foil and rolled into packs one pack of 4 and one pack of 8 within a foil envelope in a target boat.
There are also 3 coated springs interspersed.
The boat is wrapped with 3-layers of Ta heatshields.
Chamber pumped down overnight.
OMEGA slope = 0.99
Will Tap TGHT up to 40 A then autoramp to 400A at 1A/min.
Final desired temperature on OMEGA (tap)= 1800C
Tuesday, November 05, 2019, 11:30
IGP1 = 9.6e-7 Torr
Autoramp TGHT to 40A at 1A/min
Tuesday, November 05, 2019, 11:44
IGP1= 2.6e-06 Torr
TGHT = 40.8 A, 0.37V
Will leave at 40 A for 1 hour
Tuesday, November 05, 2019, 12:39
IGP1=2.5e-6 Torr
TGHT =40.0A, .33V
Start ramping TGHT to 400A at 0.1A/min
Wednesday, November 06, 2019, 09:32
IGP1=7.8e-7 Torr
TGHT = 168.4A, 2.38V
increase ramp speed to 1A/min
Wednesday, November 06, 2019, 14:07
IGP1= 2.34e-6 Torr
TGHT=400.0 A, 6.98V
set TGHT autoramp to 460A @ 1A/min aiming for 1850C (see attached plot)
Wednesday, November 06, 2019, 15:18
OMEGA = 1776 C
TGHT = 460.0A, 8.52V
IGP1= 4.7e-6 Torr
Starting manual tap up to 1810C
Wednesday, November 06, 2019, 15:36
OMEGA=1810 C
TGHT = 468.8A, 8.74V
IGP1=4.14e-6
Wednesday, November 06, 2019, 19:04
OMEGA=1822 C (has been between 1817-1824 C over 3.5 hours )
TGHT=468.8A, 8.67V
IGP1=1.9498e-06 Torr
Start TGHT ramp down at -2A/min
Thursday, November 07, 2019, 09:55
THGT = 0A, 0V overnight
IGP1= 3.2 e-07 Torr
Proceeding with unloading.
End caps looked good for online use.
|
Attachment 1: Nov4CapCoating.PNG
|
|
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10, 2020)
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Thursday, June 11, 2020, 10:19
IEVAP2:IGP1=1.06e-6 Torr
ramping to 40A (TGHT and TBHT) at 1A/min
Thursday, June 11, 2020, 12:35
IEVAP2:IGP1=1.8e-6 Torr
TGHT = 39.8 A, 0.45V
TBHT=38.5 A, 0.48V
Manually rampted to 45A on both TGHT and TBHT
Thursday, June 11, 2020, 12:58
IEVAP2:IGP1=1.6e-6 Torr
TGHT = 34.8 A, 0.52V
TBHT=44.2A, 0.55V
Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT
Thursday, June 11, 2020, 17:14
Irregular pressure profile. Cooling . Need to check for leak.
TGHT = 99 A 1.3 V
TBHT = 99 A 1.4 V
Friday, June 12, 2020, 12:59
Restarting ramping
IGP1= 4.98e7 Torr
Autoramp at 1A/min to 400A on TGHT and 230A on TBHT
(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)
Friday, June 12, 2020, 14:40
Paused ramping
TGHT = 90A
After a few minutes the profile (noise) was still there. Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT
Friday, June 12, 2020, 15:21
IGP1= 1.97e-06 Torr trending down
TGHT = 111.5 A , 1.5 V
TBHT = 112.9 A, 1.9 V
Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT
Friday, June 12, 2020, 20:50
OMEGA = 1754 C
IGP1= 2.5e-6 Torr
TGHT = 394.1 A, 6.6 V
TBHT = 232.8 A, 4.0 V
Tapping to 1900 C
Friday, June 12, 2020, 21:00
OMEGA =1901 C
IGP1= 5.6e-6 Torr
TGHT = 448.3 A, 7.5 V
TBHT = 232.8 A, 4.1 V
Saturday, June 13, 2020, 00:51
OMEGA = 1898 C
IGP1 = 2.0e-6 Torr
TGHT = 447.2 A, 7.5 V
TBHT = 232.9 A, 4.1 V
Start cooling at -2A/ min for TGHT and -1A/min for TBHT
|
Attachment 1: WO#_44139-12_TaC_sintering.PNG
|
|
567
|
Thursday, February 10, 2022, 08:58 |
Darwin Ortiz Rosales | SiC | | HP-FEBIAD | Done | | Thursday, February 10, 2022, 08:52
Total number of foils: 528 ( including 10 analysis discs)
Weight without springs = 1521.9 g (includes heatshields and T bar)
Total length packed 18.1 cm (including 10 analysis discs that will be removed)
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Ta coated spring at ends
Initially to ramp TGHT and TBHT to 50A at0.5 A/min
Then heat automatically heat to OMEGA ~1400 C , then continue to max 530A on TGHT and 230A on TBHT (Omega slope set = 0.990)
Then temperature = 1800C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -4 Torr
Bad vac at 5.00 e-2 Torr
IGP1= 1.0 e-06 Torr at start of initial ramp
IGP1 = 5.7 e-06 Torr
TGHT = 50.0 A, 0.6 V
TBHT = 50.0A, 0.5 V
continue to ramp up at 0.5A/min to 200A
Friday, February 11, 2022, 07:59
IGP1=3.0e-07 Torr and stable
TGHT= 201A, 2.8V
TBHT = 201A, 2.6V
continue autoramp at 1A/min to 230A on TBHT and 450A on TGHT
Friday, February 11, 2022, 12:41
IGP1= 6.6e-05 Torr
TGHT= 450A, 6.5V
TBHT= 232A, 3.1V
OMEGA = 1258C
Allowing pressure to drop. Will continue ramp up when [pressure around 9-e-6 Torr
Friday, February 11, 2022, 13:59
IGP1= 2.4e-05 Torr
Will ramp up at 1A/min to 550A on TGHT
Friday, February 11, 2022, 15:54
IGP1= 2.4e-05 Torr
TGHT= 551.0A, 8.3V
TBHT=232A, 3.2V
OMEGA= 1426 C
ramp to 600 A @ 2A/min
Friday, February 11, 2022, 16:23
TGHT= 600.1A, 9.3V
TBHT= 232A, 3.2V
OMEGA = 1612C
ramp to 689 @2A/min to 1800 C as projected in regression plot attached
Friday, February 11, 2022, 21:20
Evap has been at 1800 +/- 20 C for 4 hours and 10 minutes
OMEGA 1802 C
TGHT = 689 A, 11.0V
TBHT=232.8 A, 3.26V
IGP1= 1.3e-05 Torr and stabilizing.