Entry  Friday, November 01, 2013, 17:20, Anders Mjos, , , , Problems, Backing pump needs new filter 
The source of the poor vacuum in the backing line seems to be related to a dirty filter. We will try to find a replacement filter next week.
The problem seem to have started September 17th, when backing preassure CG1A went from 40 mTorr to 130 mTorr. CG1B remained around 30 mTorr.
    Reply  Monday, November 04, 2013, 14:02, Anders Mjos, , , , Maintenance, Backing pump replaced 
 

    
        
            Anders Mjos wrote:
        
        
            
Entry  Wednesday, November 06, 2013, 17:36, John Wong, TaC, Target Boat #2, , In progress, Testing TaC matrix coating  
The purpose of this experiment is to improve the TaC coating mixed with other metals as additives.  The coating solution will be sprayed on Ta metal
(0.015" thick, same thickness as the target container).
The samples will be sintered at ~ 1800C.  Once the process is completed, a graphite tube will be inserted into the tube, and then re-heated
Entry  Thursday, November 07, 2013, 09:38, Anders Mjos, , , , Problems resolved, Heat Shield cooling line twisted Twisted_Tube.jpgTwisted_Tube_Repaired.jpg
See attached photo.
The Heat Shield has been taken to the Machine Shop for repair.
Friday, November 08, 2013
Entry  Monday, January 20, 2014, 16:35, Laura Lambert, Empty, Ta-Target boat, , , Sintering Ta target boat with TaC coating 
 Monday, January 20, 2014, 16:32
A new target boat was sprayed with TaC coating and let dry this morning.
The target boat is NOT wrapped with Ta-heat shield.
Entry  Friday, March 07, 2014, 10:34, Anders Mjos, , , , Problems resolved, TGHT2 water flow signal 
There was no signal going from the coils to the PLC. After manipulating the connection points on the coil a signal could again be established. Frequency
is ~ 40Hz.
Entry  Monday, March 10, 2014, 11:45, John Wong, , , , Maintenance, Replaced Backing Pump hose 
Monday, March 10, 2014, 11:44
Rick replaced the backing pump hose from 1.5" to 2.0" for better flow.  And the HEPA filter was checked - it looks OK. 

 
Entry  Monday, March 10, 2014, 11:52, John Wong, , , , Problems resolved, The Chiller is down 
Monday, March 10, 2014, 11:45
The chiller tripped off on March 7, 2014.

    Water is not flowing into the chiller; paddle wheel shows no signal.
    Tried turning on the chiller locally; a few seconds
Entry  Friday, May 30, 2014, 13:15, Cameron Hodgins, , , , In progress, Sintering several carbides on tantalum foil backing 
 Pressure down to 7.1e-7 Torr. Water valve to heat shield was opened; pressure remained stable. 
Current turned up to 40 A for now.  Will increase at 2 A/min up to 500 A over the weekend, then on Monday we will turn it up to 600 A and
check the temperature. 
Entry  Thursday, October 02, 2014, 11:26, John Wong, Empty, , , Maintenance, Broken insulators  
 Thursday, October 02, 2014, 11:22
It was found that after the last process, Evap#2 has broken insulators - the cylinder insulator that supports the target centre legs and the block
insulator that supports the terminals.  
    Reply  Friday, October 03, 2014, 13:02, Anders Mjos, Empty, , , Maintenance, Broken insulators  NewInsulators.jpgBrokenInsulators.jpg


    
        
            John Wong wrote:
        
        
            
             Thursday, October 02, 2014, 11:22
Entry  Wednesday, November 26, 2014, 14:09, Laura Lambert, , , , Maintenance, OMEGA-IR dark patch and backing pump trip IR_focus.jpeg
 Wednesday, November 26, 2014, 13:47
OMEGA-IR laser had a dark patch on it [see picture]
Cleaned window, still dark patch
Entry  Thursday, December 11, 2014, 10:20, Laura Lambert, , , , Maintenance, water supply shut off for lab closure over holidays 
 Thursday, December 11, 2014, 10:17
water supply and return valves closed for lab closure over the holidays.
all taps leading into evap2 have been closed.
Entry  Wednesday, January 14, 2015, 13:46, Anders Mjos, Empty, , , Maintenance, Pumping down for water leak test 
 Wednesday, January 14, 2015, 13:46: Roughing
Wednesday, January 14, 2015, 14:57: Starting turbo

Monday, January 19, 2015, 13
Entry  Thursday, January 22, 2015, 14:21, Anders Mjos, Empty, , , Problems resolved, CG1A replaced 
 See previous e-log entry for details
Entry  Thursday, June 18, 2015, 11:39, Rick Maharaj, , , , , Installation of Extraction Electrode Insulator - New Material 
Tuesday June 16, 2015
An Extraction Insulator ITD0381 made from a different grade of AiN was installed in Evaporator 2 for testing purposes. The sub assembly included
the SIS Restraint Housing ITD0389, New Extraction Insulator ITD0381, Repeller Electrode ITD0377, Extraction Electrode ITD0374 with fingerstock mounted.
Entry  Thursday, July 30, 2015, 17:07, John Wong, , , , Maintenance, Connect NALCW to EVAP1  
 Thursday, July 30, 2015, 17:02
EVAP1 cooling system is now on the NALCW.  The city water has been removed from the system.  
Tested all the cooling system interlocks by shutting off each individual valve, and the main supply valve to the lab -  All Passed!  
Entry  Friday, July 31, 2015, 15:10, John Wong, , , , Maintenance, Installed leftside port 
Friday, July 31, 2015, 15:09
The left side port was installed on the evaporator #2.  Leak check was performed and no leak was detected. 

 
Entry  Monday, August 24, 2015, 12:58, John Wong, , , , Maintenance, Replacing turbo pump, IEVAP2TP1 
 Monday, August 24, 2015, 12:54
The turbo pump was found to be faulty.  The pump couldn't get on full speed and eventually timed out.  Vacuum group inspected the pump
and it is time for a service.  
Entry  Thursday, September 24, 2015, 09:48, Laura Lambert, Empty, 41077-5, , In progress, Sintering TaC coating container for UCx Target 
Thursday, September 24, 2015, 08:39
IGP1 = 6.5e-7Torr
HS water valves opened, no leaks detected.