Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 30 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Sourcedown Status Subject Text Attachments
  73   Monday, May 13, 2013, 12:53 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
 600Down.png 
  74   Monday, May 13, 2013, 17:17 Nikita BernierBeO  DoneSintering BeO pellets #6

    

       
            
  
  76   Tuesday, May 28, 2013, 17:50 John Wong Target Boat #2  DoneSintering TaC coated end capsTuesday, May 28, 2013, 17:36
The target containers endcaps were
coated with TaC solution and let dry. 
  
  83   Tuesday, August 27, 2013, 17:01 John Wong targetboat (TaC coated) DoneSintering TaC coated regular caps Tuesday, August 27, 2013, 16:48
Target boat is filled with TaC coated
endcaps (brown) and some partial sinterred
 Sintering__endcap_.jpg 
  84   Thursday, August 29, 2013, 11:53 Laura Lambert targetboat (TaC coated) DoneSintering TaC coated regular caps

    

       
            
  
  85   Tuesday, September 17, 2013, 11:21 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples) Tuesday, September 17, 2013, 11:14
Target boat contains 5 Nb discs. 
3 discs are wraps with 0.001" thin of
 Nb_sample_setup.PNGNb_800C.PNG 
  86   Thursday, September 19, 2013, 11:56 Laura LambertNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
 Capture.PNG 
  87   Thursday, September 19, 2013, 17:02 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  88   Friday, September 20, 2013, 14:59 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  89   Monday, September 23, 2013, 16:18 John WongNbtarget boat #3 (brand new!)   Nb thermo treatment (Bob's samples)

    

       
            
  
  92   Tuesday, October 29, 2013, 15:50 Anders Mjos   In progressCopper bars on TGHT and TBHT Tuesday, October 29, 2013, 15:50:
Pumping down
Wednesday, October 30, 2013, 09:32:
 Current_and_Voltage.pdf 
  93   Friday, November 01, 2013, 17:20 Anders Mjos   ProblemsBacking pump needs new filterThe source of the poor vacuum in the backing
line seems to be related to a dirty filter.
We will try to find a replacement filter
  
  94   Monday, November 04, 2013, 14:02 Anders Mjos   MaintenanceBacking pump replaced 

    
  
  95   Wednesday, November 06, 2013, 17:36 John WongTaCTarget Boat #2 In progressTesting TaC matrix coating The purpose of this experiment is to improve
the TaC coating mixed with other metals as
additives.  The coating solution will
  
  96   Thursday, November 07, 2013, 09:38 Anders Mjos   Problems resolvedHeat Shield cooling line twistedSee attached photo.
The Heat Shield has been taken to
the Machine Shop for repair.
 Twisted_Tube.jpgTwisted_Tube_Repaired.jpg 
  103   Monday, January 20, 2014, 16:35 Laura LambertEmptyTa-Target boat  Sintering Ta target boat with TaC coating Monday, January 20, 2014, 16:32
A new target boat was sprayed with
TaC coating and let dry this morning.
  
  120   Friday, March 07, 2014, 10:34 Anders Mjos   Problems resolvedTGHT2 water flow signalThere was no signal going from the coils
to the PLC. After manipulating the connection
points on the coil a signal could again be
  
  123   Monday, March 10, 2014, 11:45 John Wong   MaintenanceReplaced Backing Pump hoseMonday, March 10, 2014, 11:44
Rick replaced the backing pump hose
from 1.5" to 2.0" for better flow. 
  
  124   Monday, March 10, 2014, 11:52 John Wong   Problems resolvedThe Chiller is downMonday, March 10, 2014, 11:45
The chiller tripped off on March
7, 2014.
  
  131   Friday, May 30, 2014, 13:15 Cameron Hodgins   In progressSintering several carbides on tantalum foil backing Pressure down to 7.1e-7 Torr. Water
valve to heat shield was opened; pressure
remained stable. 
  
ELOG V2.9.2-2455