Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 20 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subjectdown Text Attachments
  363   Wednesday, May 03, 2017, 16:10 Laura LambertSiC39530-10HP-FEBIADDoneSintering SiC#36


   
        
            
 8x 
  371   Tuesday, May 16, 2017, 11:57 Laura LambertSiC41369-10HP-FEBIAD-CTLDoneSintering SiC#36 Tuesday, May 16, 2017, 10:56
Target container contains 460
 window_at_max_setpoint_after_1_day.jpg20170530_094047_Richtone(HDR).jpg20170530_094118_Richtone(HDR).jpg20170530_094137_Richtone(HDR).jpg 
  323   Monday, September 19, 2016, 18:48 John WongSiC39530-9HP-FEBIADIn progressSintering SiC#35 - Change OMEGA/MiKRON slopes

    

       
            
  
  322   Thursday, September 15, 2016, 16:37 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35 Thursday, September 15, 2016, 16:23
Target container contains 487
  
  324   Tuesday, September 20, 2016, 15:40 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

    

       
            
 sintering_target_data.xlsx 
  325   Thursday, September 22, 2016, 12:14 John WongSiC39530-9HP-FEBIADIn progressSintering SiC#35

    

       
            
  
  326   Monday, September 26, 2016, 13:49 Laura LambertSiC39530-9HP-FEBIADDoneSintering SiC#35

    

       
            
 comparison_of_temperature_drop_-_3x_snapshots.JPG 
  311   Tuesday, August 02, 2016, 13:56 Laura LambertSiC40860-3LP-IG-LISDoneSintering SiC#34 Tuesday, August 02, 2016, 13:41
Target container contains 471
 sintering-_coating_on_window1.jpgsintering-_coating_on_window2.jpgsintering-_coating_on_window3.jpeg 
  302   Thursday, June 09, 2016, 15:48 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
 target_with_end-coils.jpg 
  303   Friday, June 10, 2016, 16:30 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target! 

  
  304   Monday, June 13, 2016, 09:53 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
 current_vs_voltage_vs_temp.xlsxTapping_up_from_520A_to_1800C.JPG 
  305   Wednesday, June 15, 2016, 17:58 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

    

       
            
  
  306   Thursday, June 16, 2016, 10:58 Laura LambertSiC41369-4HP-SISDoneSintering SiC#33 - 1st beta-SiC target!

    

       
            
  
  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32Tuesday, September 01, 2015, 17:16
Target container contains 533 discs
of SiC with packed length of 17cm. 
  
  244   Wednesday, September 02, 2015, 11:28 Laura LambertSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 Screenshot-1stsintering-prewindow_coating.JPG 
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

    

       
            
 SiC#33_HPFEBIAD_temp.PNGSiC#33_HPFEBIAD_temp.xlsxleft_window.JPGleft_window_1.JPG 
  186   Friday, April 17, 2015, 16:14 Laura LambertSiC38817-7HP-SISIn progressSintering SiC#31 Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
  
  187   Thursday, April 23, 2015, 10:17 John WongSiC38817-7HP-SISDoneSintering SiC#31

    

       
            
 Screen_Shot_2015-04-23_at_3.04.01_PM.png 
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQFriday, February 22, 2013, 15:49
The LP-SIS RFQ target container was
previously coated with TaC and sintered up
 RFQ_SiC#28_-production_process.mp4 
  358   Thursday, April 13, 2017, 12:03 Laura LambertSiC TARGET BOATDoneSintering SiC pellets Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is
 IMG_1657.JPGIMG_1659.JPG 
ELOG V2.9.2-2455