  ID Date Author Target Material Target Oven W.O# Source Status Subjectdown
  363   Wednesday, May 03, 2017, 16:10 Laura LambertSiC39530-10HP-FEBIADDoneSintering SiC#36

Laura Lambert wrote:

Laura Lambert wrote:

Laura Lambert wrote:

 Thursday, April 27, 2017, 14:01

Target container contains 470 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 52.13g

Discs in target are arranged as follows: 5singles / 1pack / 65singles / 1pack / 75singles / 1pack / 75singles / 2packs / 75singles / 1pack / 75singles / 1pack / 55singles / 1pack / 5singles

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


Friday, April 28, 2017, 13:06

HS water valves turned on this morning, no leaks detected.

Tapped up manually to 40A

Waited ~3hrs , vacuum stable.

IGP1 = 4.13e-6 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 400A.  TBHT max at 230A. 

Slope on OMEGA = 1.08 [see elog i.d. # 326 for reasoning behind OMEGA slope choice]


 Tuesday, May 02, 2017, 09:24

IGP1 = 2.34e-6 Torr

TBHT = 230A, 3.15V

TGHT = 298A, 3.96V

OMEGA = 1030C

Vacuum stable, increasing ramping rate up to 0.5A/min


 Tuesday, May 02, 2017, 13:20

IGP1 = 1.3e-5 Torr

TGHT = 400A, 5.6V

OMEGA = 1175C

Increasing max setpoint to 500A


 

  Wednesday, May 03, 2017, 13:33

TGHT had remained at 500A for 16hrs, vacuum had initially come down nicely.

Vacuum was starting to creep up when i came in this morning before 8am,  IGP1 was at 1.2e-5 Torr

TGHT = 500A, 7.77V

OMEGA = 1440C

Around 8:30 vacuum started to spike, so the TGHT was tapped down rapidly to 450A

Tapping the TGHT down made no difference to the vacuum.

By the time 450A was hit, it was too late and the spike in vacuum caused the evaporator to trip off.

Turbo pump in epics showed on, turbo pump showed on according to TP direct controls.

Everything was shut off and the venting tapped, this made it obvious the turbo pump was already off as there was no ramping down noises from the turbo pump.

TP control box turned off then on again, at this point the controls showed a 'fail' message.

Turns out the turbo pump control box was fried and that's what had caused the turbo pump to fail with no notice in epics causing the vacuum to spontaneously spike.

Waiting on a new one from vacuum group...

See photos attached of striptool screenshots.


 Wednesday, May 03, 2017, 15:03

New TP control boxed installed.

Turbo pump turned on, everything pumped down.

Vacuum good, IGP1 = 6.92e-7 Torr.

IGP2 still not working, won't turn on via epics.

Tried unplugging and plugging back in...still appears red with 'fail' message...


 

 Wednesday, May 03, 2017, 16:07

Unplugging and plugging back in seemed to work now that evap2 under vacuum

IGP2 works again.

Will look into replacement ion gauge...


 

 Wednesday, May 03, 2017, 16:09

HS water valves opened, no leaks detected.

Tapped up manually to 40A.

Vacuum stable.

IGP1 = 3.6e-7 Torr

Initiated auto-ramp at 1.0A/min and 0.5A/min to 300A and 230A for the TGHT and TBHT respectively.


 Thursday, May 04, 2017, 08:41

Reached 300A, 230A 10hrs ago.

IGP1 = 1.5e-7 Torr

OMEGA = 1070C

Increasing max setpoint to 500A at a rate of 0.5A/min for TGHT


 Thursday, May 04, 2017, 14:58

Back up to max setpoint that was reached before evap2 tripped off.

TGHT = 500A, 7.65V

IGP1 = 9.3e-7 Torr

OMEGA = 1450C

Increasing max setpoint to 550A, ramping up at a lower rate of 0.2A/min since this will be done overnight.


 Friday, May 05, 2017, 08:53

TGHT = 550A, 8.64V

IGP1 = 2.8e-7 Torr

OMEGA = 1560C

Increasing max setpoint to 600A at a ramping rate of 0.5A/min


 Friday, May 05, 2017, 11:09

TGHT = 600A, 9.58V

IGP1 = 7.3e-7 Torr

OMEGA = 1670C

Increasing max setpoint to 625A at a ramping rate of 0.5A/min


 Friday, May 05, 2017, 12:05

TGHT = 625A, 10.05V

IGP1 = 9.9e-7 Torr

OMEGA = 1710C

Increasing max setpoint to 650A at a ramping rate of 0.5A/min


 Friday, May 05, 2017, 13:13

TGHT = 650A, 10.57V

IGP1 = 1.1e-6 Torr

OMEGA  = 1740C

Mikron through left side windown on outside bottom left edge on container = 1750C

Tapping up manually to 1800C


 Friday, May 05, 2017, 13:42

Adjusted slope to 1.09 so same spot on leg using MIKRON = OMEGA

TGHT = 680A, 11.08V

IGP1 = 1.6e-6 Torr

OMEGA = 1795C

MIKRON = 1795C

Plotting a temperature curve, the predicted required current to reach 1800C was 670A using a slope of 1.08

Currently sitting 10A above predicted required current.

After several minutes, temperature dropped a few degrees to 1790C

Window remains clear and uncoated.

Tapped up to TGHT = 685A, 11.2V

OMEGA = 1795C

Will remain at this setpoint over the weekend.


 Monday, May 08, 2017, 08:59

TGHT = 685A, 11.08V

TBHT = 230A, 3.24V

IGP1 = 1.98e-7 Torr

OMEGA has lowered to 1342C

Evap2 sat at max setpoints over the wknd.

Will check window port before cooling...

 

*UPDATE ON TRIP-OFF*

A closer look into the details using archives [see photos attached]:

TP tripped off TBHT and TGHT at ~8e-5Torr

Anything in the evaporator requires ~1hr to cool before turning things off.

In this scenario, the target was @ ~1440C. so ~30min post TP trip, the target may still be at ~1000C.

Anything above 0.02Torr could be close enough to atmopheric pressure that this would be cooling too fast and could lead to breaking the target/ cracking the Ta metal.

As one can see in the screenshots attached, the vacuum lingered around 0.005Torr for ~2hrs before anything was done.

This provided enough time for the target to cool before it was introduced to atmospheric pressure when the BV was closed when trying to figure out the problem.

In summary, the target 'should' be OK...will inspect target further when removed from the evaporator.


 Tuesday, May 09, 2017, 09:16

TGHT = 685A, 11.04V

TGHT power supply = 686A, 11.31V

TBHT = 230A, 3.24V

TBHT power supply = 236A, 3.32V

IGP1 = 1.6e-7 Torr

IGP1 direct readout = 2.3e-7 mbar

IGP2 = 6.8e-8 Torr

IGP2 direct readout = 8.46e-8 Torr

Evap2 reached max setpoint friday afternoon.

Window clearly coated - see attached photo.

Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, May 10, 2017, 09:18

Vented in air and opened up this morning.

Inspected container carefully for any cracks/ marks due to TP tripping off at 1450C

Target looks good! 

One sample disc removed for SEM.

When removing disc for sample, the SiC came off the graphite backing and just SiC flake came out - see photo

Photos attached showing inside container with no Si crystal formation/ good clear path all the way through target and sample removed for tests


 

Attachment 1: target_close_to_atm_pressure_for_~2hrs_before_BV_closed.JPG
target_close_to_atm_pressure_for_~2hrs_before_BV_closed.JPG
Attachment 2: target_in_at_0.005Torr_for_~2hrs_before_BV_closed_-_time_for_cooling.JPG
target_in_at_0.005Torr_for_~2hrs_before_BV_closed_-_time_for_cooling.JPG
Attachment 3: 20170508_150540_Richtone(HDR).jpg
20170508_150540_Richtone(HDR).jpg
Attachment 4: right_side.jpg
right_side.jpg
Attachment 5: left_side.jpg
left_side.jpg
Attachment 6: sample_removed.jpg
sample_removed.jpg
Attachment 7: sample1.jpg
sample1.jpg
Attachment 8: sample2.jpg
sample2.jpg
  371   Tuesday, May 16, 2017, 11:57 Laura LambertSiC41369-10HP-FEBIAD-CTLDoneSintering SiC#36

 Tuesday, May 16, 2017, 10:56

Target container contains 460 discs of SiC 

Target packed length = 17cm. 

Mass of SiC(green)  = 55.5152g

Consists of 4 packs of 5 and 440 singles.

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Tuesday, May 16, 2017, 15:27

HS water valves turned on, no leaks detected.

Tapped up manually to 30A

Waited ~30min , vacuum stable.

IGP1 = 8.25e-6 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 400A.  TBHT max at 230A. 

Slope on OMEGA = 1.09 [see elog i.d. # 370 for reasoning behind OMEGA slope choice]


 Friday, May 19, 2017, 10:13

TGHT = 250A, 3.11V     DR = 248A, 3.3V

TBHT = 137A, 1.68V     DR = 140A, 1.73V

OMEGA = 1100C

IGP1= 6.9e-6 Torr     DR = 1e-5mbar

IGP2 = 5.9e-6 Torr     DR = 6.45e-6 Torr

Vacuum stable.

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Friday, May 19, 2017, 10:33

Change in plan and switching ramping rate to 0.5A/min and 0.2A/min for the TBHT and TGHT respectively.


 Friday, May 19, 2017, 14:49

TGHT = 400A, 5.46

TBHT = 200A, 2.66

IGP1 = 2.7e-5 Torr

IGP2 = 2.2e-5 Torr

OMEGA = 1200C

Increasing max setpoint for TGHT to 550A

Decreasing ramping rate to 0.2A/min and 0.1A/min for over the weekend.


 Tuesday, May 23, 2017, 09:23

TGHT = 550A, 8.37

TBHT = 230A, 3.14

IGP1 = 1.6e-7 Torr

IGP2 = 1.6e-7 Torr

OMEGA = 1570C

Increasing max setpoint for TGHT to 600A at rate to 0.5A/min


 Tuesday, May 23, 2017, 11:45

TGHT = 600A, 9.36

IGP1 = 3.5e-7 Torr

IGP2 = 3.8e-7 Torr

OMEGA = 1675C

Increasing max setpoint for TGHT to 625A at rate to 0.5A/min


 Tuesday, May 23, 2017, 13:03

TGHT = 625A, 9.80V

IGP1 = 5.2e-7 Torr

IGP2 = 5.7e-7 Torr

OMEGA = 1715C

OMEGA no longer valid around 640A as temperature drops instantly after tapping up.

Could be due to target movement at high temperature.

No obvious window coating.

Tapped up manually to 660A, 10.49V.

Will remain at max setpoint overnight.


 Wednesday, May 24, 2017, 11:13

TGHT = 660A, 10.74V

TGHT power supply = 662A, 11.00V

TBHT = 230A, 3.16V

TBHT power supply = 232A, 3.25V

IGP1 = 4.2e-7 Torr

IGP1 direct readout = 5.9e-7 mbar

IGP2 = 4.6e-8 Torr

IGP2 direct readout = 5e-7 Torr

Evap2 reached max setpoint yesterday afternoon.

Window has thiny coating - see attached photo.

OMEGA = 1800

MIKRON = ~1800

Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, May 24, 2017, 11:36

Change of plan.

TGHT = 620A, TBHT = 210A

Ramping back-up to max setpoints and will remain at those points until vacuum starts to decrease more.


 Friday, May 26, 2017, 15:24

IGP1 = 2.1e-7 Torr

IGP2 = 2.2e-7 Torr

TGHT = 660A, 10.72V

TBHT = 230A, 3.21V

All windows coated.

Remained at max setpoints for ~3.5days.

Conditioning process complete.

Initiating auto-cool at 2A/min and 1A/min for the TGHT and TBHT respectively.


 Tuesday, May 30, 2017, 14:41

Target vented in air and removed from evap2

Looks good!

Endcaps inserted and expanded.

See photos attached.


 

Attachment 1: window_at_max_setpoint_after_1_day.jpg
window_at_max_setpoint_after_1_day.jpg
Attachment 2: 20170530_094047_Richtone(HDR).jpg
20170530_094047_Richtone(HDR).jpg
Attachment 3: 20170530_094118_Richtone(HDR).jpg
20170530_094118_Richtone(HDR).jpg
Attachment 4: 20170530_094137_Richtone(HDR).jpg
20170530_094137_Richtone(HDR).jpg
  323   Monday, September 19, 2016, 18:48 John WongSiC39530-9HP-FEBIADIn progressSintering SiC#35 - Change OMEGA/MiKRON slopes

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

  322   Thursday, September 15, 2016, 16:37 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

  324   Tuesday, September 20, 2016, 15:40 Laura LambertSiC39530-9HP-FEBIADIn progressSintering SiC#35

John Wong wrote:

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

 Tuesday, September 20, 2016, 15:18

there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA

this prompted another change in the slope on the OMEGA to 1.08

TGHT was then tapped up manually to 600A/ 1800C

will remain at this max setpoint for a few days before ramping down

see attachment for raw data


 Wednesday, September 21, 2016, 11:34

temperatures dropped a small amount overnight.

tapped up manually to 625A/ 1810C

still no coating on window.

see attachment for updated raw data


 

Attachment 1: sintering_target_data.xlsx
  325   Thursday, September 22, 2016, 12:14 John WongSiC39530-9HP-FEBIADIn progressSintering SiC#35

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

 Tuesday, September 20, 2016, 15:18

there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA

this prompted another change in the slope on the OMEGA to 1.08

TGHT was then tapped up manually to 600A/ 1800C

will remain at this max setpoint for a few days before ramping down

see attachment for raw data


 Wednesday, September 21, 2016, 11:34

temperatures dropped a small amount overnight.

tapped up manually to 625A/ 1810C

still no coating on window.

see attachment for updated raw data


 

 Thursday, September 22, 2016, 12:07

Temperature reader on OMEGA dropped slightly to 1785C overnight.  The temperature on the leg remained at 1800C (MIKRON).  No coating on windows.  

Increased TGHT to 635A/10.12V (local 10.40V).  OMEGA reads 1800C, MIKRON ~1817C.  

Continue to monitor… (see dropbox for captured photos) 


 

  326   Monday, September 26, 2016, 13:49 Laura LambertSiC39530-9HP-FEBIADDoneSintering SiC#35

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

Laura Lambert wrote:

 Thursday, September 15, 2016, 16:23

Target container contains 487 discs of SiC 

Target packed length = 16cm. 

Mass of SiC(green)  = 58.8795g

Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

Chamber is currently being pumped down. 


 Friday, September 16, 2016, 10:50

Tapped up manually to 50A

Waited ~1hr , vacuum stable.

IGP1 = 1.24e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

TGHT max = 500A.  TBHT max at 230A. 

Slope on OMEGA = 1.15


 Monday, September 19, 2016, 10:53

OMEGA = 1230C

TGHT = 360A, 4.75V

TBHT = 204A, 2.68V

IGP1 = 5.3e-6 Torr

Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.


 Monday, September 19, 2016, 11:57

OMEGA = ~1300C

TBHT = 230A, 3.16V

TGHT = 409A, 5.55V

Lowering ramping rate to 0.2A/min while vaccum high

IGP1 = 3.05e-5 Torr


 Monday, September 19, 2016, 13:22

OMEGA = 1350C

TGHT = 425A, 5.82V

IGP1 = 1.97e-5 Torr

Stepping ramping rate back up to 1.0A/min


 

 Monday, September 19, 2016, 18:24

Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up.  So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.  

Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual).  To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the  inside of the tube and on the SiC material.   

Note:  The measurements are NOT the absolute temperature.  These are relative temperature measurements  which give some guideline where the target current should be at for the sintering process.  Please plot the temp vs current as the TGHT is being ramped up.  At some point, the windows will get coated and the measurement is no longer reliable.   The plot will be used to give an estimation of the current for 1800C.  


 

 

 Tuesday, September 20, 2016, 15:18

there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA

this prompted another change in the slope on the OMEGA to 1.08

TGHT was then tapped up manually to 600A/ 1800C

will remain at this max setpoint for a few days before ramping down

see attachment for raw data


 Wednesday, September 21, 2016, 11:34

temperatures dropped a small amount overnight.

tapped up manually to 625A/ 1810C

still no coating on window.

see attachment for updated raw data


 

 Thursday, September 22, 2016, 12:07

Temperature reader on OMEGA dropped slightly to 1785C overnight.  The temperature on the leg remained at 1800C (MIKRON).  No coating on windows.  

Increased TGHT to 635A/10.12V (local 10.40V).  OMEGA reads 1800C, MIKRON ~1817C.  

Continue to monitor… (see dropbox for captured photos) 


 

 Monday, September 26, 2016, 13:24

Temperature decreased over weekend.

MIKRON dropped from ~1800C to ~1670C, OMEGA on right side remained ~1800C

Comparing screen shots of temperature readings and camera looking at target from left side, changes can be seen:

-darker area on top edge of target tube, above inside tube, grows larger when temperature drops - indicating 'cooler area' has grown

-initially darker area covers top above target materials on tube, when drops to ~1670C darker area extends down sides of target tube and reaches past target material area

See attached picture showing these details

Target has remained at this max setpoint for ~4-5 days

Windows remain un-coated.

Current and voltage readings remain un-changed.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Wednesday, September 28, 2016, 17:05

Vented in air, target taken out today.

Target looks good!

A small amount of material was removed from the windows in evap2, very thin layer of coating.

Will update tomorrow with photos

Endcaps inserted.


 

Attachment 1: comparison_of_temperature_drop_-_3x_snapshots.JPG
comparison_of_temperature_drop_-_3x_snapshots.JPG
  311   Tuesday, August 02, 2016, 13:56 Laura LambertSiC40860-3LP-IG-LISDoneSintering SiC#34

 Tuesday, August 02, 2016, 13:41

Target container contains 471 discs of SiC [6 x 5 packs + 441 single discs]

Target packed length = 16cm. 

Mass of SiC(green)  = 52.7172g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C

TGHT max = 350A.  TBHT max at 230A. 

Chamber is currently being pumped down. 

Slope on OMEGA = 1.04


Tuesday, August 02, 2016, 16:00

Tapped up manually to 30A - vacuum to high, lowered down to 20A to be able to initiate auto-ramp.

IGP1 = 2.3e-5 Torr

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 Friday, August 05, 2016, 11:57

Evap2 has reached TGHT = 350A, 5.33V

TBHT = 187A, 2.31V and still climbing...

OMEGA = 1365C

IGP1 = 7.88e-7 Torr

Increased max setpoint for TGHT to 400A.


 Friday, August 05, 2016, 13:33

TGHT = 380A, 5.97V

TBHT = 197A, 2.45V

OMEGA = 1396C

IGP1 = 8.75e-7 Torr

Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.

New final setpoint for the TGHT = 450A


 Friday, August 05, 2016, 14:17

TBHT = 230A, 2.97V

TGHT = 450A, 7.4V

OMEGA = 1572C

IGP1 = 3.2e-6 Torr

Increasing max setpoint for TGHT to 500A and re-initiating auto-ramp.


 Friday, August 05, 2016, 15:18

At TGHT = 480A, OMEGA temperature dropped to 1400C due to coating on window.

Last reading was ~1600C

Tapped up manually to TGHT = 500A, 8.61V

Window fully coated therefore OMEGA reading is negligible at this point

Attempted to take temperature reading with other OMEGA from behind evaporator or using handheld manual temperature reader - all windows have a coating, therefore unsuccessful.

IGP1 = 1.75e-6 Torr

Reduced max voltage set for TGHT to 9.0V to minimize possibly voltage 'creep'

Will remain at these setpoints over wknd and ramp down monday morning.


 Monday, August 08, 2016, 08:45

TGHT = 500A on the 'current set' and 466A on the readout, 8.74V

TBHT = 230A, 2.99V

IGP1 = 6.6e-8 Torr

OMEGA = 1460C [reading through coating on window port]

Evap2 has been at these setpoints for the wknd.

Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.


 Monday, August 08, 2016, 10:38

Quick observational note:

while ramping down OMEGA readings have slowly increased.

At ~350A OMEGA = ~1500C

At ~300A, OMEGA = ~1750C

Currently at 280A, OMEGA = ~2800C

Coating on window has affected the OMEGA readings in a weird way...


 Monday, August 08, 2016, 15:17

Vented in air and opened up this afternoon.

Cleaned windows but left target loaded in evap2 for conditioning process.


 

Attachment 1: sintering-_coating_on_window1.jpg
sintering-_coating_on_window1.jpg
Attachment 2: sintering-_coating_on_window2.jpg
sintering-_coating_on_window2.jpg
Attachment 3: sintering-_coating_on_window3.jpeg
sintering-_coating_on_window3.jpeg
  302   Thursday, June 09, 2016, 15:48 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

 Thursday, June 09, 2016, 15:39

First target using beta-SiC material!

Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 53.8758g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C, TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


Friday, June 10, 2016, 13:24

HS water valves opened, no leaks detected.

Tapping up manually to 70A...

Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A

Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.


 

 

Attachment 1: target_with_end-coils.jpg
target_with_end-coils.jpg
  303   Friday, June 10, 2016, 16:30 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

 

Laura Lambert wrote:

 Thursday, June 09, 2016, 15:39

First target using beta-SiC material!

Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 53.8758g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C, TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


Friday, June 10, 2016, 13:24

HS water valves opened, no leaks detected.

Tapping up manually to 70A...

Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A

Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.


 

 

 Friday, June 10, 2016, 16:27

TGHT stepped up to 70A/0.55V.  TGHT at 50A/0.62V. 

Pressure stabilized at 5.5e-5 Torr.

Initiated auto ramping.  TGHT at 0.2A/min --> 520A.  TBHT at 0.1A/min --> 230A.


 

  304   Monday, June 13, 2016, 09:53 Laura LambertSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

John Wong wrote:

 

Laura Lambert wrote:

 Thursday, June 09, 2016, 15:39

First target using beta-SiC material!

Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 53.8758g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C, TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


Friday, June 10, 2016, 13:24

HS water valves opened, no leaks detected.

Tapping up manually to 70A...

Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A

Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.


 

 

 Friday, June 10, 2016, 16:27

TGHT stepped up to 70A/0.55V.  TGHT at 50A/0.62V. 

Pressure stabilized at 5.5e-5 Torr.

Initiated auto ramping.  TGHT at 0.2A/min --> 520A.  TBHT at 0.1A/min --> 230A.


 

 Monday, June 13, 2016, 09:51

TGHT = 425A, 5.65V

TBHT = 225A, 3.7V

IGP1 = 8.7e-6 Torr.

Increasing ramping rate to 1.0A/min...


 Monday, June 13, 2016, 15:56

Tapped up manually from 520A to 1800C

Extrapolated data on graph to determine correct current required to reach desired max temperature.

Will remain at 1800C for ~48hrs

See attachements for excel sheet and screenshot of striptool.


 

Attachment 1: current_vs_voltage_vs_temp.xlsx
Attachment 2: Tapping_up_from_520A_to_1800C.JPG
Tapping_up_from_520A_to_1800C.JPG
  305   Wednesday, June 15, 2016, 17:58 John WongSiC41369-4HP-SISIn progressSintering SiC#33 - 1st beta-SiC target!

Laura Lambert wrote:

John Wong wrote:

 

Laura Lambert wrote:

 Thursday, June 09, 2016, 15:39

First target using beta-SiC material!

Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 53.8758g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C, TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


Friday, June 10, 2016, 13:24

HS water valves opened, no leaks detected.

Tapping up manually to 70A...

Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A

Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.


 

 

 Friday, June 10, 2016, 16:27

TGHT stepped up to 70A/0.55V.  TGHT at 50A/0.62V. 

Pressure stabilized at 5.5e-5 Torr.

Initiated auto ramping.  TGHT at 0.2A/min --> 520A.  TBHT at 0.1A/min --> 230A.


 

 Monday, June 13, 2016, 09:51

TGHT = 425A, 5.65V

TBHT = 225A, 3.7V

IGP1 = 8.7e-6 Torr.

Increasing ramping rate to 1.0A/min...


 Monday, June 13, 2016, 15:56

Tapped up manually from 520A to 1800C

Extrapolated data on graph to determine correct current required to reach desired max temperature.

Will remain at 1800C for ~48hrs

See attachements for excel sheet and screenshot of striptool.


 

 Wednesday, June 15, 2016, 17:54

TGHT at 710A, 11.35V.  TBHT at 230A/3.86V. 

Omega reading droppd to 1130C due to coating on windows. 

Ionizer tube was measured (center) at around 1900C

Cooling down at 2A/min for TGHT, 1A/min for TBHT. 

Samples will be collected prior to cleaning the windows.

NEXT:  Conditioning.


 

  306   Thursday, June 16, 2016, 10:58 Laura LambertSiC41369-4HP-SISDoneSintering SiC#33 - 1st beta-SiC target!

John Wong wrote:

Laura Lambert wrote:

John Wong wrote:

 

Laura Lambert wrote:

 Thursday, June 09, 2016, 15:39

First target using beta-SiC material!

Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]

Target packed length = 16cm. 

Mass of 533 discs SiC(green)  = 53.8758g

Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.

Sintering temp = 1800C, TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


Friday, June 10, 2016, 13:24

HS water valves opened, no leaks detected.

Tapping up manually to 70A...

Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A

Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.


 

 

 Friday, June 10, 2016, 16:27

TGHT stepped up to 70A/0.55V.  TGHT at 50A/0.62V. 

Pressure stabilized at 5.5e-5 Torr.

Initiated auto ramping.  TGHT at 0.2A/min --> 520A.  TBHT at 0.1A/min --> 230A.


 

 Monday, June 13, 2016, 09:51

TGHT = 425A, 5.65V

TBHT = 225A, 3.7V

IGP1 = 8.7e-6 Torr.

Increasing ramping rate to 1.0A/min...


 Monday, June 13, 2016, 15:56

Tapped up manually from 520A to 1800C

Extrapolated data on graph to determine correct current required to reach desired max temperature.

Will remain at 1800C for ~48hrs

See attachements for excel sheet and screenshot of striptool.


 

 Wednesday, June 15, 2016, 17:54

TGHT at 710A, 11.35V.  TBHT at 230A/3.86V. 

Omega reading droppd to 1130C due to coating on windows. 

Ionizer tube was measured (center) at around 1900C

Cooling down at 2A/min for TGHT, 1A/min for TBHT. 

Samples will be collected prior to cleaning the windows.

NEXT:  Conditioning.


 

Thursday, June 16, 2016, 09:29

vented in air and opened up this morning.

took some samples to be tested.


 

  243   Tuesday, September 01, 2015, 17:20 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

  244   Wednesday, September 02, 2015, 11:28 Laura LambertSiC39530-5HP-FEBIADIn progressSintering SiC#32

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

Attachment 1: Screenshot-1stsintering-prewindow_coating.JPG
Screenshot-1stsintering-prewindow_coating.JPG
  245   Tuesday, September 08, 2015, 15:56 John WongSiC39530-5HP-FEBIADIn progressSintering SiC#32

Laura Lambert wrote:

John Wong wrote:

Tuesday, September 01, 2015, 17:16

Target container contains 533 discs of SiC with packed length of 17cm. 

Mass of 533 discs SiC(green)  = 57.8979g

Total mass SiC(green) + target container = 1455g

Container is wrapped with 3 heatshields; no end caps are inserted yet.

Sintering temp at 1800C - TGHT will be set accordingly.  TBHT max at 230A. 

Chamber is currently being pumped down. 


 

 Wednesday, September 02, 2015, 09:11

HS water valves opened, no leaks detected.

IGP1 = 1.15e-6 Torr

Tapped up manually to 40A.

Waited ~1hr40 for vacuum to stabilize.

IGP1 = 3.6e-6 Torr.

Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C

Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.

Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]

Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.

If LS port still clean, will continue to ramp up to final desired temperature of 1800C.


 Wednesday, September 02, 2015, 14:23

IGP1 = 4.0e-5 Torr.

Vacuum too high, stopped auto-ramp and tapped down manually.

Dropped TGHT down from 80A to 50A

Dropped TBHT down from 55A to 50A


Wednesday, September 02, 2015, 15:29

Vacuum down to IGP1 = 1.2e-5 Torr.

Re-initiating auto-ramp...


 Tuesday, September 08, 2015, 10:04

IGP1 = 4.5e-7 Torr.

TGHT = 630A, 9.6V

TBHT = 230A, 3.2V

DV = 0.22V

OMEGA RS = 1476C

OMEGA LS = 1450C

see attached photo for screenshot.

will tap up manually with a visual on both window ports...


 

 Tuesday, September 08, 2015, 15:44

TGHT has stepped up to 820A.  Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right.  See attachment for The Temp (and Power) vs current plots.

Target will remained heated at the current and will be cooled down later today. 

 

The target will be re-conditioned up to 820A and temp and mass will be re-measured.

Plans:

The chamber will be vented tomorrow and the target will be taken out to weigh for mass change. 

The chamber windows will need to be clean.

A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).


 Tuesday, September 08, 2015, 17:37

TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating.  More coating on the right window is observed and temp reading came down to 1340C.  The left window remains the same and temp reads at 1646C.  

Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.  


 Wednesday, September 09, 2015, 12:27

Result after the sintering process:

No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C). 

Total green mass = 57.90g 

mass of graphite foil = 0.035g x 533 discs = 18.7g 

mass of green SiC = 39.30g 

Target container with SiC before sintered = 1455g 

Target container after sintered = 1450g 

mass loss ~ 5.0g ~ 13% organic mass, as expected!  

The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A. 


 

Attachment 1: SiC#33_HPFEBIAD_temp.PNG
SiC#33_HPFEBIAD_temp.PNG
Attachment 2: SiC#33_HPFEBIAD_temp.xlsx
Attachment 3: left_window.JPG
left_window.JPG
Attachment 4: left_window_1.JPG
left_window_1.JPG
  186   Friday, April 17, 2015, 16:14 Laura LambertSiC38817-7HP-SISIn progressSintering SiC#31

 Friday, April 17, 2015, 16:01

Total number of foils: 520 discs

Total mass of materials [incl graphite foils]: 60.2441g

Total length packed: 17.0cm

Container is wrapped with 3x Ta-heat shields.

No endcaps inserted to allow outgasing.

Currently being pumped down.


 Monday, April 20, 2015, 11:08

Target container is coated with TaC and wrapped with 3-Ta heat shields, not incl center block.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Chamber pumped down over the weekend.

IGP1 = 2.1e-7 Torr.

HS cooling water valves opened; no leaks detected.

TGHT max voltage = 18V, TBHT max voltage = 5V

....

attempted to start stepping up manually.

power supply not responding to epics controls for TBHT only...looking into problems now...


 Monday, April 20, 2015, 16:06

Epics is working.

Power supply connections unplugged/plugged back in.

Everything working again.

Tapped up manually to 40A.

Waited ~1hr30 for vacuum to stabilize.

IGP1 = 1.8e-6 Torr.

Good vac = 3e-5 Torr. Bad vac = 4e-5 Torr.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 Wednesday, April 22, 2015, 15:23

TGHT = 200A, 2.26V; TBHT = 117A, 1.58V

IGP1 = 9.8e-6 Torr.

Increasing auto-ramp to 0.4A/min and 0.2A/min for the TGHT and TBHT respectively.


 

  187   Thursday, April 23, 2015, 10:17 John WongSiC38817-7HP-SISDoneSintering SiC#31

Laura Lambert wrote:

 Friday, April 17, 2015, 16:01

Total number of foils: 520 discs

Total mass of materials [incl graphite foils]: 60.2441g

Total length packed: 17.0cm

Container is wrapped with 3x Ta-heat shields.

No endcaps inserted to allow outgasing.

Currently being pumped down.


 Monday, April 20, 2015, 11:08

Target container is coated with TaC and wrapped with 3-Ta heat shields, not incl center block.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Chamber pumped down over the weekend.

IGP1 = 2.1e-7 Torr.

HS cooling water valves opened; no leaks detected.

TGHT max voltage = 18V, TBHT max voltage = 5V

....

attempted to start stepping up manually.

power supply not responding to epics controls for TBHT only...looking into problems now...


 Monday, April 20, 2015, 16:06

Epics is working.

Power supply connections unplugged/plugged back in.

Everything working again.

Tapped up manually to 40A.

Waited ~1hr30 for vacuum to stabilize.

IGP1 = 1.8e-6 Torr.

Good vac = 3e-5 Torr. Bad vac = 4e-5 Torr.

TGHT and TBHT will be ramped up to 820A and 230A, respectively.

Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.


 Wednesday, April 22, 2015, 15:23

TGHT = 200A, 2.26V; TBHT = 117A, 1.58V

IGP1 = 9.8e-6 Torr.

Increasing auto-ramp to 0.4A/min and 0.2A/min for the TGHT and TBHT respectively.


 

 Thursday, April 23, 2015, 10:15

Vac at 2.e-6 Torr.  Increased TGHT ramping rate to 1.0A/min.  Current temperature at 1443C, TGHT at 641A, TBHT at 230A.


 Thursday, April 23, 2015, 15:02

Evap#2 window for the temp reader is now coated, so temp reading is not available.  (see attachment). 

TGHT has been at 820A/13.45V for almost 2 hours, will continue to heat at this current for a few more hours.  Will initiate the cooling process from home…  


 Thursday, April 23, 2015, 22:31

Target has been heated at 820A for about 9.5hrs.  Current vacuum at 4.7e-7 Torr.

Initiating cooling process at -2A/min for TGHT and -1A/min for TBHT.


Friday, April 24, 2015, 10:13  

Target has been cooled at 0A for about 5 hours.  Chamber is currently being vented and the target will be taken out for inspection.

 


Friday, April 24, 2015, 12:37  

The target was inspected.  

Some yellow crystals were form around the ends but they were easily removed this time.  

With both ends open during the sintering process and shorten the target length with 1cm space of both side, the target is looking a lot better.  

 No visible damage on the target surface.  

Inside, the channel has a clear pathway, and the discs are nicely aligned.  

End caps and Rh foils are inserted - It's ready for assembly.

See link for pics after the sintering process.

https://www.dropbox.com/sh/w5k4l3fezfat2cm/AAAyX67zyUPUVvN_WzEHFXM2a?dl=0

 


 

Attachment 1: Screen_Shot_2015-04-23_at_3.04.01_PM.png
Screen_Shot_2015-04-23_at_3.04.01_PM.png
  58   Friday, February 22, 2013, 15:55 John WongSiC LP-SISDoneSintering SiC#28-RFQ

Friday, February 22, 2013, 15:49

The LP-SIS RFQ target container was previously coated with TaC and sintered up to ~1500C (TGHT @ 600A, TBHT @ 300A). 

The container is loaded with 325 discs of SiC, a total of 10.9cm in length. 

For this process,

TGHT will be ramped up to 600A and at the same time TBHT will go up to 300A.  No Ta-heat shield is used. 

The ramping rate is set to 0.2A/min.

The chamber is currently being pumped down. 


 Friday, March 01, 2013, 15:57

The target was further heated up to 650A TGHT and 300A TBHT for 4 hours yesterday; then it was cooled down.  

Some reactions on the target end (where the D-cap inserted) was observed.  

Yellow crystals on the D-cap was formed, just as we have seen before.  

Overall, the target looks good!  

See attachment#2 for the target production. 

More about the gasses analyst from the RGA later...  


 

Attachment 1: RFQ_SiC#28_-production_process.mp4
  358   Thursday, April 13, 2017, 12:03 Laura LambertSiC TARGET BOATDoneSintering SiC pellets

 Thursday, April 13, 2017, 12:01

Pellets made this morning and weighed.

Placed in a graphite boat which is placed inside a previously TaC coated boat.

Boat is wrapped with 3x Ta heat shields.

Loaded into evap2.

Chamber currently pumping down.


 Tuesday, April 18, 2017, 13:53

HS water valves were opened this morning, no leaks detected.

Tapped up manually to 100A, 1.28V

Vacuum stable.

IGP1 = 3.63e-6 Torr.

Initiating auto ramp at a rate of 1.0A/min to 150A

Final desired temperature of 1100C


 Tuesday, April 18, 2017, 14:57

TGHT = 150A, 2.08V

Still no temperature reading on OMEGA.

Vacuum stable, IGP1 = 1.16e-6 Torr.

Initiating auto ramp at the same rate of 1.0A/min up to 200A.


 Tuesday, April 18, 2017, 15:56

TGHT = 200A, 2.91V

OMEGA = 990C

IGP1 = 8.59e-7 Torr

Tapping up manually to 1100C...


 Wednesday, April 19, 2017, 08:34

TGHT = 235A, 3.47V

OMEGA = 1090C

IGP1 = 1.6e-7 Torr.

Has remained at ~1100C since 16:30 yesterday.

Intitiating auto-cool at 2.0A/min


 Thursday, April 20, 2017, 08:40

Vented in air and taken out yesterday.

Pellets look good.

No obvious colour change.


 

Attachment 1: IMG_1657.JPG
IMG_1657.JPG
Attachment 2: IMG_1659.JPG
IMG_1659.JPG