Wednesday, May 03, 2017, 16:10, Laura Lambert, SiC, 39530-10, HP-FEBIAD, Done, Sintering SiC#36 8x
|
Laura Lambert wrote: |
Laura Lambert wrote: |
Laura Lambert wrote: |
Thursday, April 27, 2017, 14:01
Target container contains 470 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 52.13g
Discs in target are arranged as follows: 5singles / 1pack / 65singles / 1pack / 75singles / 1pack / 75singles / 2packs / 75singles / 1pack / 75singles / 1pack / 55singles / 1pack / 5singles
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, April 28, 2017, 13:06
HS water valves turned on this morning, no leaks detected.
Tapped up manually to 40A
Waited ~3hrs , vacuum stable.
IGP1 = 4.13e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 400A. TBHT max at 230A.
Slope on OMEGA = 1.08 [see elog i.d. # 326 for reasoning behind OMEGA slope choice]
Tuesday, May 02, 2017, 09:24
IGP1 = 2.34e-6 Torr
TBHT = 230A, 3.15V
TGHT = 298A, 3.96V
OMEGA = 1030C
Vacuum stable, increasing ramping rate up to 0.5A/min
Tuesday, May 02, 2017, 13:20
IGP1 = 1.3e-5 Torr
TGHT = 400A, 5.6V
OMEGA = 1175C
Increasing max setpoint to 500A
|
Wednesday, May 03, 2017, 13:33
TGHT had remained at 500A for 16hrs, vacuum had initially come down nicely.
Vacuum was starting to creep up when i came in this morning before 8am, IGP1 was at 1.2e-5 Torr
TGHT = 500A, 7.77V
OMEGA = 1440C
Around 8:30 vacuum started to spike, so the TGHT was tapped down rapidly to 450A
Tapping the TGHT down made no difference to the vacuum.
By the time 450A was hit, it was too late and the spike in vacuum caused the evaporator to trip off.
Turbo pump in epics showed on, turbo pump showed on according to TP direct controls.
Everything was shut off and the venting tapped, this made it obvious the turbo pump was already off as there was no ramping down noises from the turbo pump.
TP control box turned off then on again, at this point the controls showed a 'fail' message.
Turns out the turbo pump control box was fried and that's what had caused the turbo pump to fail with no notice in epics causing the vacuum to spontaneously spike.
Waiting on a new one from vacuum group...
See photos attached of striptool screenshots.
Wednesday, May 03, 2017, 15:03
New TP control boxed installed.
Turbo pump turned on, everything pumped down.
Vacuum good, IGP1 = 6.92e-7 Torr.
IGP2 still not working, won't turn on via epics.
Tried unplugging and plugging back in...still appears red with 'fail' message...
|
Wednesday, May 03, 2017, 16:07
Unplugging and plugging back in seemed to work now that evap2 under vacuum
IGP2 works again.
Will look into replacement ion gauge...
|
Wednesday, May 03, 2017, 16:09
HS water valves opened, no leaks detected.
Tapped up manually to 40A.
Vacuum stable.
IGP1 = 3.6e-7 Torr
Initiated auto-ramp at 1.0A/min and 0.5A/min to 300A and 230A for the TGHT and TBHT respectively.
Thursday, May 04, 2017, 08:41
Reached 300A, 230A 10hrs ago.
IGP1 = 1.5e-7 Torr
OMEGA = 1070C
Increasing max setpoint to 500A at a rate of 0.5A/min for TGHT
Thursday, May 04, 2017, 14:58
Back up to max setpoint that was reached before evap2 tripped off.
TGHT = 500A, 7.65V
IGP1 = 9.3e-7 Torr
OMEGA = 1450C
Increasing max setpoint to 550A, ramping up at a lower rate of 0.2A/min since this will be done overnight.
Friday, May 05, 2017, 08:53
TGHT = 550A, 8.64V
IGP1 = 2.8e-7 Torr
OMEGA = 1560C
Increasing max setpoint to 600A at a ramping rate of 0.5A/min
Friday, May 05, 2017, 11:09
TGHT = 600A, 9.58V
IGP1 = 7.3e-7 Torr
OMEGA = 1670C
Increasing max setpoint to 625A at a ramping rate of 0.5A/min
Friday, May 05, 2017, 12:05
TGHT = 625A, 10.05V
IGP1 = 9.9e-7 Torr
OMEGA = 1710C
Increasing max setpoint to 650A at a ramping rate of 0.5A/min
Friday, May 05, 2017, 13:13
TGHT = 650A, 10.57V
IGP1 = 1.1e-6 Torr
OMEGA = 1740C
Mikron through left side windown on outside bottom left edge on container = 1750C
Tapping up manually to 1800C
Friday, May 05, 2017, 13:42
Adjusted slope to 1.09 so same spot on leg using MIKRON = OMEGA
TGHT = 680A, 11.08V
IGP1 = 1.6e-6 Torr
OMEGA = 1795C
MIKRON = 1795C
Plotting a temperature curve, the predicted required current to reach 1800C was 670A using a slope of 1.08
Currently sitting 10A above predicted required current.
After several minutes, temperature dropped a few degrees to 1790C
Window remains clear and uncoated.
Tapped up to TGHT = 685A, 11.2V
OMEGA = 1795C
Will remain at this setpoint over the weekend.
Monday, May 08, 2017, 08:59
TGHT = 685A, 11.08V
TBHT = 230A, 3.24V
IGP1 = 1.98e-7 Torr
OMEGA has lowered to 1342C
Evap2 sat at max setpoints over the wknd.
Will check window port before cooling...
*UPDATE ON TRIP-OFF*
A closer look into the details using archives [see photos attached]:
TP tripped off TBHT and TGHT at ~8e-5Torr
Anything in the evaporator requires ~1hr to cool before turning things off.
In this scenario, the target was @ ~1440C. so ~30min post TP trip, the target may still be at ~1000C.
Anything above 0.02Torr could be close enough to atmopheric pressure that this would be cooling too fast and could lead to breaking the target/ cracking the Ta metal.
As one can see in the screenshots attached, the vacuum lingered around 0.005Torr for ~2hrs before anything was done.
This provided enough time for the target to cool before it was introduced to atmospheric pressure when the BV was closed when trying to figure out the problem.
In summary, the target 'should' be OK...will inspect target further when removed from the evaporator.
Tuesday, May 09, 2017, 09:16
TGHT = 685A, 11.04V
TGHT power supply = 686A, 11.31V
TBHT = 230A, 3.24V
TBHT power supply = 236A, 3.32V
IGP1 = 1.6e-7 Torr
IGP1 direct readout = 2.3e-7 mbar
IGP2 = 6.8e-8 Torr
IGP2 direct readout = 8.46e-8 Torr
Evap2 reached max setpoint friday afternoon.
Window clearly coated - see attached photo.
Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, May 10, 2017, 09:18
Vented in air and opened up this morning.
Inspected container carefully for any cracks/ marks due to TP tripping off at 1450C
Target looks good! 
One sample disc removed for SEM.
When removing disc for sample, the SiC came off the graphite backing and just SiC flake came out - see photo
Photos attached showing inside container with no Si crystal formation/ good clear path all the way through target and sample removed for tests
|
Tuesday, May 16, 2017, 11:57, Laura Lambert, SiC, 41369-10, HP-FEBIAD-CTL, Done, Sintering SiC#36   
|
Tuesday, May 16, 2017, 10:56
Target container contains 460 discs of SiC
Target packed length = 17cm.
Mass of SiC(green) = 55.5152g
Consists of 4 packs of 5 and 440 singles.
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Tuesday, May 16, 2017, 15:27
HS water valves turned on, no leaks detected.
Tapped up manually to 30A
Waited ~30min , vacuum stable.
IGP1 = 8.25e-6 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 400A. TBHT max at 230A.
Slope on OMEGA = 1.09 [see elog i.d. # 370 for reasoning behind OMEGA slope choice]
Friday, May 19, 2017, 10:13
TGHT = 250A, 3.11V DR = 248A, 3.3V
TBHT = 137A, 1.68V DR = 140A, 1.73V
OMEGA = 1100C
IGP1= 6.9e-6 Torr DR = 1e-5mbar
IGP2 = 5.9e-6 Torr DR = 6.45e-6 Torr
Vacuum stable.
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Friday, May 19, 2017, 10:33
Change in plan and switching ramping rate to 0.5A/min and 0.2A/min for the TBHT and TGHT respectively.
Friday, May 19, 2017, 14:49
TGHT = 400A, 5.46
TBHT = 200A, 2.66
IGP1 = 2.7e-5 Torr
IGP2 = 2.2e-5 Torr
OMEGA = 1200C
Increasing max setpoint for TGHT to 550A
Decreasing ramping rate to 0.2A/min and 0.1A/min for over the weekend.
Tuesday, May 23, 2017, 09:23
TGHT = 550A, 8.37
TBHT = 230A, 3.14
IGP1 = 1.6e-7 Torr
IGP2 = 1.6e-7 Torr
OMEGA = 1570C
Increasing max setpoint for TGHT to 600A at rate to 0.5A/min
Tuesday, May 23, 2017, 11:45
TGHT = 600A, 9.36
IGP1 = 3.5e-7 Torr
IGP2 = 3.8e-7 Torr
OMEGA = 1675C
Increasing max setpoint for TGHT to 625A at rate to 0.5A/min
Tuesday, May 23, 2017, 13:03
TGHT = 625A, 9.80V
IGP1 = 5.2e-7 Torr
IGP2 = 5.7e-7 Torr
OMEGA = 1715C
OMEGA no longer valid around 640A as temperature drops instantly after tapping up.
Could be due to target movement at high temperature.
No obvious window coating.
Tapped up manually to 660A, 10.49V.
Will remain at max setpoint overnight.
Wednesday, May 24, 2017, 11:13
TGHT = 660A, 10.74V
TGHT power supply = 662A, 11.00V
TBHT = 230A, 3.16V
TBHT power supply = 232A, 3.25V
IGP1 = 4.2e-7 Torr
IGP1 direct readout = 5.9e-7 mbar
IGP2 = 4.6e-8 Torr
IGP2 direct readout = 5e-7 Torr
Evap2 reached max setpoint yesterday afternoon.
Window has thiny coating - see attached photo.
OMEGA = 1800
MIKRON = ~1800
Initiating auto cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, May 24, 2017, 11:36
Change of plan.
TGHT = 620A, TBHT = 210A
Ramping back-up to max setpoints and will remain at those points until vacuum starts to decrease more.
Friday, May 26, 2017, 15:24
IGP1 = 2.1e-7 Torr
IGP2 = 2.2e-7 Torr
TGHT = 660A, 10.72V
TBHT = 230A, 3.21V
All windows coated.
Remained at max setpoints for ~3.5days.
Conditioning process complete.
Initiating auto-cool at 2A/min and 1A/min for the TGHT and TBHT respectively.
Tuesday, May 30, 2017, 14:41
Target vented in air and removed from evap2
Looks good!
Endcaps inserted and expanded.
See photos attached.
|
Monday, September 19, 2016, 18:48, John Wong, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35 - Change OMEGA/MiKRON slopes
|
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
Thursday, September 15, 2016, 16:37, Laura Lambert, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35
|
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Tuesday, September 20, 2016, 15:40, Laura Lambert, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35
|
John Wong wrote: |
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
Tuesday, September 20, 2016, 15:18
there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA
this prompted another change in the slope on the OMEGA to 1.08
TGHT was then tapped up manually to 600A/ 1800C
will remain at this max setpoint for a few days before ramping down
see attachment for raw data
Wednesday, September 21, 2016, 11:34
temperatures dropped a small amount overnight.
tapped up manually to 625A/ 1810C
still no coating on window.
see attachment for updated raw data
|
Thursday, September 22, 2016, 12:14, John Wong, SiC, 39530-9, HP-FEBIAD, In progress, Sintering SiC#35
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
Tuesday, September 20, 2016, 15:18
there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA
this prompted another change in the slope on the OMEGA to 1.08
TGHT was then tapped up manually to 600A/ 1800C
will remain at this max setpoint for a few days before ramping down
see attachment for raw data
Wednesday, September 21, 2016, 11:34
temperatures dropped a small amount overnight.
tapped up manually to 625A/ 1810C
still no coating on window.
see attachment for updated raw data
|
Thursday, September 22, 2016, 12:07
Temperature reader on OMEGA dropped slightly to 1785C overnight. The temperature on the leg remained at 1800C (MIKRON). No coating on windows.
Increased TGHT to 635A/10.12V (local 10.40V). OMEGA reads 1800C, MIKRON ~1817C.
Continue to monitor… (see dropbox for captured photos)
|
Monday, September 26, 2016, 13:49, Laura Lambert, SiC, 39530-9, HP-FEBIAD, Done, Sintering SiC#35
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, September 15, 2016, 16:23
Target container contains 487 discs of SiC
Target packed length = 16cm.
Mass of SiC(green) = 58.8795g
Container is wrapped with 1x heatshield around each side of cooling fins; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
Chamber is currently being pumped down.
Friday, September 16, 2016, 10:50
Tapped up manually to 50A
Waited ~1hr , vacuum stable.
IGP1 = 1.24e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
TGHT max = 500A. TBHT max at 230A.
Slope on OMEGA = 1.15
Monday, September 19, 2016, 10:53
OMEGA = 1230C
TGHT = 360A, 4.75V
TBHT = 204A, 2.68V
IGP1 = 5.3e-6 Torr
Increasing ramping rate to 1.0A/min and 0.5A/min for the TGHT and TBHT respectively.
Monday, September 19, 2016, 11:57
OMEGA = ~1300C
TBHT = 230A, 3.16V
TGHT = 409A, 5.55V
Lowering ramping rate to 0.2A/min while vaccum high
IGP1 = 3.05e-5 Torr
Monday, September 19, 2016, 13:22
OMEGA = 1350C
TGHT = 425A, 5.82V
IGP1 = 1.97e-5 Torr
Stepping ramping rate back up to 1.0A/min
|
Monday, September 19, 2016, 18:24
Measuring the temperature on the SiC is difficult due to the changing in emissivity as the temperature goes up. So, I will use the MIKRON to measure the temperature on the Ta surface near the end of the tube and OMEGA for measuring the inside.
Using the analogue pyrometer, the temperature on the Ta surface at the end of the tube was measured at around ~1450C; this temperature match the temperature on the Mikron at slope 0.98 (as usual). To match it with OMEGA, I changed the slope to 1.04 since this measurement is taking readings on the inside of the tube and on the SiC material.
Note: The measurements are NOT the absolute temperature. These are relative temperature measurements which give some guideline where the target current should be at for the sintering process. Please plot the temp vs current as the TGHT is being ramped up. At some point, the windows will get coated and the measurement is no longer reliable. The plot will be used to give an estimation of the current for 1800C.
|
Tuesday, September 20, 2016, 15:18
there was a temperature fluctuation resulting in the MIKRON no longer matching the readout on the OMEGA
this prompted another change in the slope on the OMEGA to 1.08
TGHT was then tapped up manually to 600A/ 1800C
will remain at this max setpoint for a few days before ramping down
see attachment for raw data
Wednesday, September 21, 2016, 11:34
temperatures dropped a small amount overnight.
tapped up manually to 625A/ 1810C
still no coating on window.
see attachment for updated raw data
|
Thursday, September 22, 2016, 12:07
Temperature reader on OMEGA dropped slightly to 1785C overnight. The temperature on the leg remained at 1800C (MIKRON). No coating on windows.
Increased TGHT to 635A/10.12V (local 10.40V). OMEGA reads 1800C, MIKRON ~1817C.
Continue to monitor… (see dropbox for captured photos)
|
Monday, September 26, 2016, 13:24
Temperature decreased over weekend.
MIKRON dropped from ~1800C to ~1670C, OMEGA on right side remained ~1800C
Comparing screen shots of temperature readings and camera looking at target from left side, changes can be seen:
-darker area on top edge of target tube, above inside tube, grows larger when temperature drops - indicating 'cooler area' has grown
-initially darker area covers top above target materials on tube, when drops to ~1670C darker area extends down sides of target tube and reaches past target material area
See attached picture showing these details
Target has remained at this max setpoint for ~4-5 days
Windows remain un-coated.
Current and voltage readings remain un-changed.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Wednesday, September 28, 2016, 17:05
Vented in air, target taken out today.
Target looks good!
A small amount of material was removed from the windows in evap2, very thin layer of coating.
Will update tomorrow with photos
Endcaps inserted.
|
Tuesday, August 02, 2016, 13:56, Laura Lambert, SiC, 40860-3, LP-IG-LIS, Done, Sintering SiC#34  
|
Tuesday, August 02, 2016, 13:41
Target container contains 471 discs of SiC [6 x 5 packs + 441 single discs]
Target packed length = 16cm.
Mass of SiC(green) = 52.7172g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C
TGHT max = 350A. TBHT max at 230A.
Chamber is currently being pumped down.
Slope on OMEGA = 1.04
Tuesday, August 02, 2016, 16:00
Tapped up manually to 30A - vacuum to high, lowered down to 20A to be able to initiate auto-ramp.
IGP1 = 2.3e-5 Torr
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Friday, August 05, 2016, 11:57
Evap2 has reached TGHT = 350A, 5.33V
TBHT = 187A, 2.31V and still climbing...
OMEGA = 1365C
IGP1 = 7.88e-7 Torr
Increased max setpoint for TGHT to 400A.
Friday, August 05, 2016, 13:33
TGHT = 380A, 5.97V
TBHT = 197A, 2.45V
OMEGA = 1396C
IGP1 = 8.75e-7 Torr
Increasing ramping rate to 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
New final setpoint for the TGHT = 450A
Friday, August 05, 2016, 14:17
TBHT = 230A, 2.97V
TGHT = 450A, 7.4V
OMEGA = 1572C
IGP1 = 3.2e-6 Torr
Increasing max setpoint for TGHT to 500A and re-initiating auto-ramp.
Friday, August 05, 2016, 15:18
At TGHT = 480A, OMEGA temperature dropped to 1400C due to coating on window.
Last reading was ~1600C
Tapped up manually to TGHT = 500A, 8.61V
Window fully coated therefore OMEGA reading is negligible at this point
Attempted to take temperature reading with other OMEGA from behind evaporator or using handheld manual temperature reader - all windows have a coating, therefore unsuccessful.
IGP1 = 1.75e-6 Torr
Reduced max voltage set for TGHT to 9.0V to minimize possibly voltage 'creep'
Will remain at these setpoints over wknd and ramp down monday morning.
Monday, August 08, 2016, 08:45
TGHT = 500A on the 'current set' and 466A on the readout, 8.74V
TBHT = 230A, 2.99V
IGP1 = 6.6e-8 Torr
OMEGA = 1460C [reading through coating on window port]
Evap2 has been at these setpoints for the wknd.
Initiating auto-cool at 2.0A/min and 1.0A/min for the TGHT and TBHT respectively.
Monday, August 08, 2016, 10:38
Quick observational note:
while ramping down OMEGA readings have slowly increased.
At ~350A OMEGA = ~1500C
At ~300A, OMEGA = ~1750C
Currently at 280A, OMEGA = ~2800C
Coating on window has affected the OMEGA readings in a weird way...
Monday, August 08, 2016, 15:17
Vented in air and opened up this afternoon.
Cleaned windows but left target loaded in evap2 for conditioning process.
|
Thursday, June 09, 2016, 15:48, Laura Lambert, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target!
|
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:30, John Wong, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target!
|
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:53, Laura Lambert, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target! 
|
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Wednesday, June 15, 2016, 17:58, John Wong, SiC, 41369-4, HP-SIS, In progress, Sintering SiC#33 - 1st beta-SiC target!
|
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Wednesday, June 15, 2016, 17:54
TGHT at 710A, 11.35V. TBHT at 230A/3.86V.
Omega reading droppd to 1130C due to coating on windows.
Ionizer tube was measured (center) at around 1900C
Cooling down at 2A/min for TGHT, 1A/min for TBHT.
Samples will be collected prior to cleaning the windows.
NEXT: Conditioning.
|
Thursday, June 16, 2016, 10:58, Laura Lambert, SiC, 41369-4, HP-SIS, Done, Sintering SiC#33 - 1st beta-SiC target!
|
John Wong wrote: |
Laura Lambert wrote: |
John Wong wrote: |
Laura Lambert wrote: |
Thursday, June 09, 2016, 15:39
First target using beta-SiC material!
Target container contains 450 discs of SiC [4 x 5 packs + 430 single discs]
Target packed length = 16cm.
Mass of 533 discs SiC(green) = 53.8758g
Container is wrapped with 3 heatshields; no end caps are inserted yet - coated spring inserted both sides to hold discs in place.
Sintering temp = 1800C, TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
Friday, June 10, 2016, 13:24
HS water valves opened, no leaks detected.
Tapping up manually to 70A...
Auto ramp will be set for TGHT = 0.2A/min to a final setpoint of 520A
Auto-ramp for TBHT = 0.1A/min to a final setpoint of 230A.
|
Friday, June 10, 2016, 16:27
TGHT stepped up to 70A/0.55V. TGHT at 50A/0.62V.
Pressure stabilized at 5.5e-5 Torr.
Initiated auto ramping. TGHT at 0.2A/min --> 520A. TBHT at 0.1A/min --> 230A.
|
Monday, June 13, 2016, 09:51
TGHT = 425A, 5.65V
TBHT = 225A, 3.7V
IGP1 = 8.7e-6 Torr.
Increasing ramping rate to 1.0A/min...
Monday, June 13, 2016, 15:56
Tapped up manually from 520A to 1800C
Extrapolated data on graph to determine correct current required to reach desired max temperature.
Will remain at 1800C for ~48hrs
See attachements for excel sheet and screenshot of striptool.
|
Wednesday, June 15, 2016, 17:54
TGHT at 710A, 11.35V. TBHT at 230A/3.86V.
Omega reading droppd to 1130C due to coating on windows.
Ionizer tube was measured (center) at around 1900C
Cooling down at 2A/min for TGHT, 1A/min for TBHT.
Samples will be collected prior to cleaning the windows.
NEXT: Conditioning.
|
Thursday, June 16, 2016, 09:29
vented in air and opened up this morning.
took some samples to be tested.
|
Tuesday, September 01, 2015, 17:20, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32
|
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 11:28, Laura Lambert, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32
|
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:56, John Wong, SiC, 39530-5, HP-FEBIAD, In progress, Sintering SiC#32   
|
Laura Lambert wrote: |
John Wong wrote: |
Tuesday, September 01, 2015, 17:16
Target container contains 533 discs of SiC with packed length of 17cm.
Mass of 533 discs SiC(green) = 57.8979g
Total mass SiC(green) + target container = 1455g
Container is wrapped with 3 heatshields; no end caps are inserted yet.
Sintering temp at 1800C - TGHT will be set accordingly. TBHT max at 230A.
Chamber is currently being pumped down.
|
Wednesday, September 02, 2015, 09:11
HS water valves opened, no leaks detected.
IGP1 = 1.15e-6 Torr
Tapped up manually to 40A.
Waited ~1hr40 for vacuum to stabilize.
IGP1 = 3.6e-6 Torr.
Max setpoints set to TGHT = 630A and TBHT = 230A, ~1400C
Initiating auto ramp at a rate of 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Once max setpoints achieved, will tap up manually until window port becomes coated [as previously observed]
Once window port becomes coated will leave at set temp for ~4hrs to continue with outgassing, then cool down, clean window and ramp back up.
If LS port still clean, will continue to ramp up to final desired temperature of 1800C.
Wednesday, September 02, 2015, 14:23
IGP1 = 4.0e-5 Torr.
Vacuum too high, stopped auto-ramp and tapped down manually.
Dropped TGHT down from 80A to 50A
Dropped TBHT down from 55A to 50A
Wednesday, September 02, 2015, 15:29
Vacuum down to IGP1 = 1.2e-5 Torr.
Re-initiating auto-ramp...
Tuesday, September 08, 2015, 10:04
IGP1 = 4.5e-7 Torr.
TGHT = 630A, 9.6V
TBHT = 230A, 3.2V
DV = 0.22V
OMEGA RS = 1476C
OMEGA LS = 1450C
see attached photo for screenshot.
will tap up manually with a visual on both window ports...
|
Tuesday, September 08, 2015, 15:44
TGHT has stepped up to 820A. Coating on both windows is becoming obvious and it's interfering the temp readers; however, the left window (see attachment, which is further away from the target) is lightly coated than the right. See attachment for The Temp (and Power) vs current plots.
Target will remained heated at the current and will be cooled down later today.
The target will be re-conditioned up to 820A and temp and mass will be re-measured.
Plans:
The chamber will be vented tomorrow and the target will be taken out to weigh for mass change.
The chamber windows will need to be clean.
A piece of Ta foil will be cover in front of the ionizer to trap any loss material (if any).
Tuesday, September 08, 2015, 17:37
TGHT was at 800A for 2 hours before ramping up 820A for another 2 hours heating. More coating on the right window is observed and temp reading came down to 1340C. The left window remains the same and temp reads at 1646C.
Ramping TGHT/TBHT to 0A at 2A/min and 1A/min, respectively.
Wednesday, September 09, 2015, 12:27
Result after the sintering process:
No yellow crystal formed (compared to previously observed SiC targets that heated up above 1900C).
Total green mass = 57.90g
mass of graphite foil = 0.035g x 533 discs = 18.7g
mass of green SiC = 39.30g
Target container with SiC before sintered = 1455g
Target container after sintered = 1450g
mass loss ~ 5.0g ~ 13% organic mass, as expected!
The target will undergo the re-condition stage, and the temperature will be measured from 600A to 820A.
|
Friday, April 17, 2015, 16:14, Laura Lambert, SiC, 38817-7, HP-SIS, In progress, Sintering SiC#31
|
Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
Total mass of materials [incl graphite foils]: 60.2441g
Total length packed: 17.0cm
Container is wrapped with 3x Ta-heat shields.
No endcaps inserted to allow outgasing.
Currently being pumped down.
Monday, April 20, 2015, 11:08
Target container is coated with TaC and wrapped with 3-Ta heat shields, not incl center block.
TGHT and TBHT will be ramped up to 820A and 230A, respectively.
Chamber pumped down over the weekend.
IGP1 = 2.1e-7 Torr.
HS cooling water valves opened; no leaks detected.
TGHT max voltage = 18V, TBHT max voltage = 5V
....
attempted to start stepping up manually.
power supply not responding to epics controls for TBHT only...looking into problems now...
Monday, April 20, 2015, 16:06
Epics is working.
Power supply connections unplugged/plugged back in.
Everything working again.
Tapped up manually to 40A.
Waited ~1hr30 for vacuum to stabilize.
IGP1 = 1.8e-6 Torr.
Good vac = 3e-5 Torr. Bad vac = 4e-5 Torr.
TGHT and TBHT will be ramped up to 820A and 230A, respectively.
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Wednesday, April 22, 2015, 15:23
TGHT = 200A, 2.26V; TBHT = 117A, 1.58V
IGP1 = 9.8e-6 Torr.
Increasing auto-ramp to 0.4A/min and 0.2A/min for the TGHT and TBHT respectively.
|
Thursday, April 23, 2015, 10:17, John Wong, SiC, 38817-7, HP-SIS, Done, Sintering SiC#31
|
Laura Lambert wrote: |
Friday, April 17, 2015, 16:01
Total number of foils: 520 discs
Total mass of materials [incl graphite foils]: 60.2441g
Total length packed: 17.0cm
Container is wrapped with 3x Ta-heat shields.
No endcaps inserted to allow outgasing.
Currently being pumped down.
Monday, April 20, 2015, 11:08
Target container is coated with TaC and wrapped with 3-Ta heat shields, not incl center block.
TGHT and TBHT will be ramped up to 820A and 230A, respectively.
Chamber pumped down over the weekend.
IGP1 = 2.1e-7 Torr.
HS cooling water valves opened; no leaks detected.
TGHT max voltage = 18V, TBHT max voltage = 5V
....
attempted to start stepping up manually.
power supply not responding to epics controls for TBHT only...looking into problems now...
Monday, April 20, 2015, 16:06
Epics is working.
Power supply connections unplugged/plugged back in.
Everything working again.
Tapped up manually to 40A.
Waited ~1hr30 for vacuum to stabilize.
IGP1 = 1.8e-6 Torr.
Good vac = 3e-5 Torr. Bad vac = 4e-5 Torr.
TGHT and TBHT will be ramped up to 820A and 230A, respectively.
Initiating auto-ramp at 0.2A/min and 0.1A/min for the TGHT and TBHT respectively.
Wednesday, April 22, 2015, 15:23
TGHT = 200A, 2.26V; TBHT = 117A, 1.58V
IGP1 = 9.8e-6 Torr.
Increasing auto-ramp to 0.4A/min and 0.2A/min for the TGHT and TBHT respectively.
|
Thursday, April 23, 2015, 10:15
Vac at 2.e-6 Torr. Increased TGHT ramping rate to 1.0A/min. Current temperature at 1443C, TGHT at 641A, TBHT at 230A.
Thursday, April 23, 2015, 15:02
Evap#2 window for the temp reader is now coated, so temp reading is not available. (see attachment).
TGHT has been at 820A/13.45V for almost 2 hours, will continue to heat at this current for a few more hours. Will initiate the cooling process from home…
Thursday, April 23, 2015, 22:31
Target has been heated at 820A for about 9.5hrs. Current vacuum at 4.7e-7 Torr.
Initiating cooling process at -2A/min for TGHT and -1A/min for TBHT.
Friday, April 24, 2015, 10:13
Target has been cooled at 0A for about 5 hours. Chamber is currently being vented and the target will be taken out for inspection.
Friday, April 24, 2015, 12:37
The target was inspected.
Some yellow crystals were form around the ends but they were easily removed this time.
With both ends open during the sintering process and shorten the target length with 1cm space of both side, the target is looking a lot better.
No visible damage on the target surface.
Inside, the channel has a clear pathway, and the discs are nicely aligned.
End caps and Rh foils are inserted - It's ready for assembly.
See link for pics after the sintering process.
https://www.dropbox.com/sh/w5k4l3fezfat2cm/AAAyX67zyUPUVvN_WzEHFXM2a?dl=0
|
Friday, February 22, 2013, 15:55, John Wong, SiC, , LP-SIS, Done, Sintering SiC#28-RFQ
|
Friday, February 22, 2013, 15:49
The LP-SIS RFQ target container was previously coated with TaC and sintered up to ~1500C (TGHT @ 600A, TBHT @ 300A).
The container is loaded with 325 discs of SiC, a total of 10.9cm in length.
For this process,
TGHT will be ramped up to 600A and at the same time TBHT will go up to 300A. No Ta-heat shield is used.
The ramping rate is set to 0.2A/min.
The chamber is currently being pumped down.
Friday, March 01, 2013, 15:57
The target was further heated up to 650A TGHT and 300A TBHT for 4 hours yesterday; then it was cooled down.
Some reactions on the target end (where the D-cap inserted) was observed.
Yellow crystals on the D-cap was formed, just as we have seen before.
Overall, the target looks good!
See attachment#2 for the target production.
More about the gasses analyst from the RGA later...
|
Thursday, April 13, 2017, 12:03, Laura Lambert, SiC, , TARGET BOAT, Done, Sintering SiC pellets 
|
Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is placed inside a previously TaC coated boat.
Boat is wrapped with 3x Ta heat shields.
Loaded into evap2.
Chamber currently pumping down.
Tuesday, April 18, 2017, 13:53
HS water valves were opened this morning, no leaks detected.
Tapped up manually to 100A, 1.28V
Vacuum stable.
IGP1 = 3.63e-6 Torr.
Initiating auto ramp at a rate of 1.0A/min to 150A
Final desired temperature of 1100C
Tuesday, April 18, 2017, 14:57
TGHT = 150A, 2.08V
Still no temperature reading on OMEGA.
Vacuum stable, IGP1 = 1.16e-6 Torr.
Initiating auto ramp at the same rate of 1.0A/min up to 200A.
Tuesday, April 18, 2017, 15:56
TGHT = 200A, 2.91V
OMEGA = 990C
IGP1 = 8.59e-7 Torr
Tapping up manually to 1100C...
Wednesday, April 19, 2017, 08:34
TGHT = 235A, 3.47V
OMEGA = 1090C
IGP1 = 1.6e-7 Torr.
Has remained at ~1100C since 16:30 yesterday.
Intitiating auto-cool at 2.0A/min
Thursday, April 20, 2017, 08:40
Vented in air and taken out yesterday.
Pellets look good.
No obvious colour change.
|
|