  684   Wednesday, March 12, 2025, 07:10 Darwin Ortiz RosalesEndcaps TARGET BOATDoneTaC coating sinteringTuesday, March 11, 2025, 15:44
The coated container was wrapped
in 3 Ta foil heatshields.
  
  4   Tuesday, February 28, 2012, 11:00 John WongEmptyTest oven LP-SISDoneMeasuring temperatures, currents & voltages Tuesday, February 28, 2012, 10:36
Two thermocouples were inserted through
the left side of the copper heat shield,
 Evap_2_thermocouple.jpg 
  15   Tuesday, April 03, 2012, 09:00 John WongEmptyTa-target boat #2  Sintering Ta-target boat with TaC coatingTuesday, April 03, 2012, 08:54
Yesterday, a new target boat was
sprayed with TaC coating and let dried.
 TGHT_maxcurrent.jpg 
  36   Thursday, July 19, 2012, 17:05 John WongEmpty37918-3LP-FEBIADDoneCoating target oven /w TaC & sintering for UCx#5 Thursday, July 19, 2012, 16:58
The target container was coated with
TaC. 
  
  45   Wednesday, August 22, 2012, 17:36 John WongEmpty39165-5LP-SISDoneCoating target oven /w TaC & sintering for UCx#5Wednesday, August 22, 2012, 17:25
Note:  LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered
  
  51   Wednesday, October 10, 2012, 16:37 John WongEmpty39165-4LP-SISDoneCoating target oven /w TaC & sintering for TiC#3Wednesday, October 10, 2012, 16:35
Target container is coated with TaC. 
No Ta-heat shields are used.
 striptool_archiver_container_TaC_coating.PNG 
  54   Friday, January 11, 2013, 14:00 John WongEmptyTa-Target boat DoneTesting QMS & thermocouples Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with
 evap2_thermocouple_setup.PNGQMS_temperature_setup.PNG008_all_temp.png018.png022.png 
  57   Monday, February 18, 2013, 16:43 John WongEmpty LP-SISDoneSintering TaC coating on the RFQ target container Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered.  No
 SiC#28_-_LPSIS-RFQ.pngSintering_of_TaC.PNGautorampingdown_10.PNG 
  59   Monday, March 04, 2013, 17:41 John WongEmptyLP-SIS RFQ ver 2.0  Testing LPSIS RFQ ver 2.0 Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS.  The container will be
  
  60   Wednesday, March 06, 2013, 10:41 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal testWednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing
 CTL_1st_Assebmly_Thermal_Test_Evap2.pdf2013-03-08_Evap2_First_Thermal_Test.pdf 
  61   Wednesday, March 06, 2013, 17:53 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test

    

       
            
 rampingup_1.PNGrampingup_2.PNGautorampingdown_23.PNG 
  62   Monday, March 11, 2013, 12:23 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 2 

    
 2013-03-11_Evap2_Second_Thermal_Test.pdf 
  63   Monday, March 11, 2013, 15:59 John WongEmpty38481-4HP-FEBIADDoneCTL thermal test 2

    

       
            
 autorampingup_110.PNG 
  64   Wednesday, March 13, 2013, 16:08 Anders MjosEmpty38481-4HP-FEBIADDoneThermal testWednesday, March 13, 2013 
Thermocouple channels (see attached
PDF for photos)
 HP-FEBIAD-A_TC_at_fins.pdf 
  65   Thursday, March 14, 2013, 12:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL thermal test 3 (w/o CTL block)Thursday, March 12, 2013 
The CTL was removed and target heated
to 580A / 300A
 2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.pdf2013-03-13_-_FEBIAD-HP-A_TargetLeg_and_HeatShield_TC.xlsx 
  66   Thursday, April 11, 2013, 14:20 John WongEmpty39165-6LP-SISDoneCoating target oven /w TaC & sintering for UCx#6Monday, April 08, 2013, 17:39
Target container is coated with TaC;
the container will be used for the UCx#6
  
  67   Friday, April 19, 2013, 09:39 Rick MaharajEmpty  Donethermocouple Feedthru A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator
  
  68   Friday, April 19, 2013, 15:27 Anders MjosEmpty38481-4HP-FEBIADDoneCTL testTarget installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified.
  
  69   Monday, April 22, 2013, 18:49 John WongEmpty38481-4HP-FEBIADDoneCTL test


   
        
            
  
  70   Tuesday, April 23, 2013, 10:11 Anders MjosEmpty38481-4HP-FEBIADDoneCTL test 

    
 2013-04-23_Evap2_ITD0300_CTL_Thermal_Test.xlsxCTL_ITD0300_Evap2.pdfDeformed_Ionizer_Tube.jpg 