ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
45
|
Wednesday, August 22, 2012, 17:36 |
John Wong | Empty | 39165-5 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#5 | Wednesday, August 22, 2012, 17:25
Note: LP-FEBIAD target container
( W.O#37918-3) was coated with TaC and sintered |
|
51
|
Wednesday, October 10, 2012, 16:37 |
John Wong | Empty | 39165-4 | LP-SIS | Done | Coating target oven /w TaC & sintering for TiC#3 | Wednesday, October 10, 2012, 16:35
Target container is coated with TaC.
No Ta-heat shields are used. |
|
54
|
Friday, January 11, 2013, 14:00 |
John Wong | Empty | Ta-Target boat | | Done | Testing QMS & thermocouples | Friday, January 11, 2013, 13:52
TEST#1
A new target boat is coated with |
|
57
|
Monday, February 18, 2013, 16:43 |
John Wong | Empty | | LP-SIS | Done | Sintering TaC coating on the RFQ target container | Monday, February 18, 2013, 16:28
The RFQ target container is coated
with TaC and ready to be sintered. No |
|
59
|
Monday, March 04, 2013, 17:41 |
John Wong | Empty | LP-SIS RFQ ver 2.0 | | | Testing LPSIS RFQ ver 2.0 | Monday, March 04, 2013, 17:39
This is the 2nd modified target container
for RFQ LPSIS. The container will be |
|
60
|
Wednesday, March 06, 2013, 10:41 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test | Wednesday, March 06, 2013
The Cool Transfer Line (CTL) test
target is installed for thermal tests. Drawing |
|
61
|
Wednesday, March 06, 2013, 17:53 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test |
|
|
62
|
Monday, March 11, 2013, 12:23 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
63
|
Monday, March 11, 2013, 15:59 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 2 |
|
|
64
|
Wednesday, March 13, 2013, 16:08 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | Thermal test | Wednesday, March 13, 2013
Thermocouple channels (see attached
PDF for photos) |
|
65
|
Thursday, March 14, 2013, 12:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL thermal test 3 (w/o CTL block) | Thursday, March 12, 2013
The CTL was removed and target heated
to 580A / 300A |
|
66
|
Thursday, April 11, 2013, 14:20 |
John Wong | Empty | 39165-6 | LP-SIS | Done | Coating target oven /w TaC & sintering for UCx#6 | Monday, April 08, 2013, 17:39
Target container is coated with TaC;
the container will be used for the UCx#6 |
|
67
|
Friday, April 19, 2013, 09:39 |
Rick Maharaj | Empty | | | Done | thermocouple Feedthru | A thermocouple feedthru was installed
via 9 pin sub-D connector. It runs from the
the conflat cross on the top of the evaporator |
|
68
|
Friday, April 19, 2013, 15:27 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test | Target installed with 4 T/C
The target assembly is ITD0300 with
the CTL Cu cooling block slightly modified. |
|
69
|
Monday, April 22, 2013, 18:49 |
John Wong | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
70
|
Tuesday, April 23, 2013, 10:11 |
Anders Mjos | Empty | 38481-4 | HP-FEBIAD | Done | CTL test |
|
|
71
|
Tuesday, April 30, 2013, 11:20 |
Anders Mjos | Empty | 38481-5 | HP-FEBIAD | Done | CTL thermal test | CTL block on T/C F/T Ch 1
Supply on Ch 3
HS Return on Ch 4 |
|
75
|
Tuesday, May 14, 2013, 17:15 |
John Wong | Empty | 38481-6 | HP-FEBIAD | Done | SinteringTaC coating | Tuesday, May 14, 2013, 17:04
Target oven is coated with TaC, and
wrapped with 3-Ta heat shields. |
|
79
|
Monday, July 22, 2013, 15:03 |
John Wong | Empty | 38634-7 | LP-SIS | Done | Sintering empty target oven coated with TaC for UCx#7 | Monday, July 22, 2013, 15:00
Target container is coated with TaC
- this container will be used for UCx#7. |
|
90
|
Thursday, September 26, 2013, 15:17 |
John Wong | Empty | 39814-VI-? | LP-IG-LIS | Done | Sintering empty target oven coated with TaC for UCx#8 | Thursday, September 26, 2013, 13:04
The LP-IG-LIS target container is
coated with TaC. |
|