452
|
Tuesday, July 30, 2019, 15:42 |
Darwin Ortiz Rosales | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Tuesday, July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).
Total weight= 470 g.
20 Analysis discs weighing 2.368 g (10 at each end).
Two springs (one at each end).
OMEGA slope initially = 0.990 (was changed to 1.09 at higher Temperature as per eLog #434
Target is being pumped down.
Wednesday, July 31, 2019, 09:31
Desired temp = 1900 C, Auto ramping TGHT at 0.1 A/min to reach 400A then TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)
TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.
Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.
IGP1= 1.35e-06 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Wednesday, July 31, 2019, 12:02
At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min).
Thursday, August 01, 2019, 08:42
TGHT = 54.7
TBHT = 54.3
IGP1 = 3.86e-5 Torr
Will changer heat ramp to .1A/min by changing wait interval to 60s
Tuesday, August 06, 2019, 07:14
OMEGA = 1212 C
TGHT = 344.7 A, 5.79 V
TBHT = 233 A, 4.17 V
IGP1 = 1.05 e-06 Torr
Autoramping to 400A at increments of 0.1A/min
Tuesday, August 06, 2019, 09:50
OMEGA = 1233 C
TGHT = 360 A, 6.05 V
TBHT = 233 A, 4.18 V
IGP1 = 1.21 e-06 Torr
increasing autoramp increments to .5A/min
Tuesday, August 06, 2019, 12:27
OMEGA = 1356 C
TGHT = 400.6 A, 6.92 V
TBHT = 233.8 A, 4.20 V
IGP1 = 1.95 e-06 Torr
Autoramping to 430 A on TGHT at 0.5 A/min
Tuesday, August 06, 2019, 14:02
OMEGA = 1447 C
TGHT= 430.9 A, 7.66V
TBHT = 233.2A, 4.2 V
IGP1= 2.01e-06 Torr
Autoramping to 440 A on TGHT at 0.5 A/min
Wednesday, August 07, 2019, 09:10
OMEGA = 1548
TGHT = 441.56 A, 8.2 V
TBHT = 233.3 A, 4.2 V
IGP1 = 6.21e-07 Torr
Manually ramping up to 1900C @ 1A/min
Wednesday, August 07, 2019, 09:43
Changed OMEGA slope to 1.09 as per eLog #434
OMEGA reads 1773 C @ TGHT 451A, 8.4V
IGP1 = 7.02 e-07
Wednesday, August 07, 2019, 10:56
OMEGA = 1903 C
TGHT = 483.5 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 1.7 e-06 Torr trending down
Wednesday, August 07, 2019, 11:40
OMEGA = 1914 C
TGHT = 483.5 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.5 e-06 Torr trending down
Decrease TGHT current to 480.4 A
Wednesday, August 07, 2019, 13:04
OMEGA = 1918 C
TGHT = 480.3 A, 9.4V
TBHT = 233.3 A, 4.3V
IGP1 = 1.28e-06 Torr
Decrease TGHT current to 474.5 A
Wednesday, August 07, 2019, 13:26
OMEGA = 1904 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.11e-06 Torr
Wednesday, August 07, 2019, 13:47
OMEGA = 1912 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.10e-06 Torr
Decrease TGHT to 471.8 A
OMEGA temperature went down to 1904 C
Wednesday, August 07, 2019, 14:26
OMEGA = 1911 C
TGHT = 471.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.00e-06 Torr
Decrease TGHT to 469.0 A
OMEGA temperature down to 1904C
Wednesday, August 07, 2019, 15:45
OMEGA = 1912 C
TGHT = 468.8.8 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 9.2e-07 Torr
Decrease TGHT to 466.0 A
OMEGA temperature down to 1903C
Wednesday, August 07, 2019, 22:09
OMEGA = 1924 C
TGHT = 466.8. A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 7.6e-07 Torr
Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V
OMEGA = 1900 C
Will allow Pressure to stabilize
Thursday, August 08, 2019, 06:54
OMEGA = 1919 C
TGHT = 456.9 A, 9.1V
TBHT = 230.3 A, 4.2 V
IGP1 =5.7e-07 Torr
Cooling at 2A/min TGHT and 1A/min TBHT
Thursday, August 08, 2019, 13:30
Target removed from Evap2. Awaiting inspection by John.
|
453
|
Monday, August 12, 2019, 15:55 |
John Wong | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Darwin Ortiz Rosales wrote:
|
Tuesday, July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, 465 g total weight (no springs and no analysis discs).
Total weight= 470 g.
20 Analysis discs weighing 2.368 g (10 at each end).
Two springs (one at each end).
OMEGA slope initially = 0.990 (was changed to 1.09 at higher Temperature as per eLog #434
Target is being pumped down.
Wednesday, July 31, 2019, 09:31
Desired temp = 1900 C, Auto ramping TGHT at 0.1 A/min to reach 400A then TGHT will be tapped up accordingly to reach desired temperature. (eLog 434)
TBHT will be set fixed at 230A (max). TBHT at 0.1 A/min to reach 230A.
Note: Initially both TGHT and TBHT will be ramped up at 0.3A/min up to 30A each.
IGP1= 1.35e-06 Torr
Good vac at 3.00-5 Torr
Bad vac at 5.0e-5 Torr.
Wednesday, July 31, 2019, 12:02
At 30A pressure was increasing a bit fast, therefore, the ramp was changed to increments of .1A every 120s (.05A/min).
Thursday, August 01, 2019, 08:42
TGHT = 54.7
TBHT = 54.3
IGP1 = 3.86e-5 Torr
Will changer heat ramp to .1A/min by changing wait interval to 60s
Tuesday, August 06, 2019, 07:14
OMEGA = 1212 C
TGHT = 344.7 A, 5.79 V
TBHT = 233 A, 4.17 V
IGP1 = 1.05 e-06 Torr
Autoramping to 400A at increments of 0.1A/min
Tuesday, August 06, 2019, 09:50
OMEGA = 1233 C
TGHT = 360 A, 6.05 V
TBHT = 233 A, 4.18 V
IGP1 = 1.21 e-06 Torr
increasing autoramp increments to .5A/min
Tuesday, August 06, 2019, 12:27
OMEGA = 1356 C
TGHT = 400.6 A, 6.92 V
TBHT = 233.8 A, 4.20 V
IGP1 = 1.95 e-06 Torr
Autoramping to 430 A on TGHT at 0.5 A/min
Tuesday, August 06, 2019, 14:02
OMEGA = 1447 C
TGHT= 430.9 A, 7.66V
TBHT = 233.2A, 4.2 V
IGP1= 2.01e-06 Torr
Autoramping to 440 A on TGHT at 0.5 A/min
Wednesday, August 07, 2019, 09:10
OMEGA = 1548
TGHT = 441.56 A, 8.2 V
TBHT = 233.3 A, 4.2 V
IGP1 = 6.21e-07 Torr
Manually ramping up to 1900C @ 1A/min
Wednesday, August 07, 2019, 09:43
Changed OMEGA slope to 1.09 as per eLog #434
OMEGA reads 1773 C @ TGHT 451A, 8.4V
IGP1 = 7.02 e-07
Wednesday, August 07, 2019, 10:56
OMEGA = 1903 C
TGHT = 483.5 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 1.7 e-06 Torr trending down
Wednesday, August 07, 2019, 11:40
OMEGA = 1914 C
TGHT = 483.5 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.5 e-06 Torr trending down
Decrease TGHT current to 480.4 A
Wednesday, August 07, 2019, 13:04
OMEGA = 1918 C
TGHT = 480.3 A, 9.4V
TBHT = 233.3 A, 4.3V
IGP1 = 1.28e-06 Torr
Decrease TGHT current to 474.5 A
Wednesday, August 07, 2019, 13:26
OMEGA = 1904 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.11e-06 Torr
Wednesday, August 07, 2019, 13:47
OMEGA = 1912 C
TGHT = 474.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.10e-06 Torr
Decrease TGHT to 471.8 A
OMEGA temperature went down to 1904 C
Wednesday, August 07, 2019, 14:26
OMEGA = 1911 C
TGHT = 471.8 A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 1.00e-06 Torr
Decrease TGHT to 469.0 A
OMEGA temperature down to 1904C
Wednesday, August 07, 2019, 15:45
OMEGA = 1912 C
TGHT = 468.8.8 A, 9.2V
TBHT = 233.3 A, 4.3V
IGP1 = 9.2e-07 Torr
Decrease TGHT to 466.0 A
OMEGA temperature down to 1903C
Wednesday, August 07, 2019, 22:09
OMEGA = 1924 C
TGHT = 466.8. A, 9.3V
TBHT = 233.3 A, 4.3V
IGP1 = 7.6e-07 Torr
Cooling at 2A/min TGHT to 456.0 A, 9.0 V and 1A/min TBHT to 230.1 A, 4.2 V
OMEGA = 1900 C
Will allow Pressure to stabilize
Thursday, August 08, 2019, 06:54
OMEGA = 1919 C
TGHT = 456.9 A, 9.1V
TBHT = 230.3 A, 4.2 V
IGP1 =5.7e-07 Torr
Cooling at 2A/min TGHT and 1A/min TBHT
Thursday, August 08, 2019, 13:30
Target removed from Evap2. Awaiting inspection by John.
|
Monday, August 12, 2019, 15:45
Visual inspection on the target was performed today. See attachment for details.
Target container is slightly bent, and some visible crystallization on the container surface.
The discs are nicely packed with only a slight expansion in length was measured.
No clogging inside the container nor the ionizer tube.
Some sintered discs samples were collected and SEM will be perform later.
|
Attachment 1: ZrC_43044-6_inspection.pdf
|
|
455
|
Friday, September 06, 2019, 11:58 |
Darwin Ortiz Rosales | | 44062-4 | LP-SIS | Done | TaC coating/sintering | Friday, September 06, 2019, 11:20
Container was coated with Tac and wrapped with 2 Ta heat shields.
Desired temp=1900 C, Omega slope set =0.990
Chamber pumped down over night and will be initially tapped manually to 40A for both TGHT and TBHT.
Subsequently, current will be automatically ramped up in increments of 1A/min to reach 400A for TGHT and 230A for TBHT.
Then TGHT will be manually tapped to target temperature and allow to stabilize for a minimum of 3 hours.
Good vac at 3.0e-5 Torr
Bad vac at 5.0e-5 Torr
Friday, September 06, 2019, 11:32
IEVAP2:IGP1=9.6e-7 Torr
Tapping to 40A (TGHT and TBHT).
Friday, September 06, 2019, 12:54
Start autoramp
1A/min TGHT and TBHT
IGP1=4.0e-06 Torr
Friday, September 06, 2019, 13:29
TGHT = 70A, TBHT=70A, pressure started to spike rapidly so aborted autoramp and lowered the current to 66A for both TGHT and TBHT.
pressure continued to rise so tapped current to 60A. A drop observed. Will allow to stabilize.
Friday, September 06, 2019, 14:06
IGP1=5.3e-06 Torr. Restart previous ramping.
At 66A paused ramping. IPG1= 1.0e-5 Torr
Friday, September 06, 2019, 15:44
IGP1=6.0e-6 Torr
Start modified autoramping: 0.4A/min for TGHT and TBHT. Will manually tap up in the morning, over ham and eggs.
Saturday, September 07, 2019, 10:52
Will tap up to 423 A on TGHT as per attachment #1 regression
IGP1= 1.13e-6 Torr
OMEGA = 1802 C
TGHT= 401.0 A, 6.84V
TBHT=233.6A, 4.1V
Saturday, September 07, 2019, 11:06
Tapped up TGHT to 438A
OMEGA= 1903C
Will monitor and adjust if necessary.
Saturday, September 07, 2019, 15:06
IGP1 = 1.17e-6 Torr
TGHT = 7.46 V, 439.3 A
TBHT = 4.13 V, 233.4 A
Autoramps
TGHT = -2 A/min, TBHT = -1 A/min
Monday, September 09, 2019, 16:34
The EVAP2 was vented and the target container was removed.
|
Attachment 1: 190906LPSIS_Sintering.PNG
|
|
456
|
Wednesday, September 11, 2019, 15:16 |
Marla Cervantes | | 44062-4 | LP-SIS | Done | TaC coated target container calibration/conditioning | Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog 455 was loaded with an empty graphite cartridge and set it in the EVAP2
The system is currently pumping down.
The target container was wrapped with 3 new Ta heat shields.
The target container will be heated to 2000 C and the temperature will be held for 4 hours.
The autoramp was set to:
TGHT 1 A/min, 450 A
TBHT 0.5 A/min, to 230 A
At 500 A on the TGHT, 20 additional amps were programmed to increased at 1 A/min, however, the autoramp increased the current to 520 A without stepping (see figure A).
The final conditions were:
TGHT: 9.95 V, 565.59 A
TBHT: 4.18 V, 233.43 A
IGP1: 2.2 e-6 Torr
Friday, September 13, 2019, 11:16
After 4 hours the EVAP2 was cooled down
at a rate of TGHT 1 A/min and TBHT 0.5 A/min
The EVAP2 was vented with air.
|
Attachment 1: A.JPG
|
|
Attachment 2: B.JPG
|
|
457
|
Monday, September 16, 2019, 14:50 |
Aaron Schmidt | Ta | 44062-5 | LP-SIS | In progress | Conditioning Ta#59 | Ta#59 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 13.74 g/cm3
Target length = 3.4 cm
Total Mass = 46.7314 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 436 g (440 g w/ end caps)
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
End caps installed (not yet expanded). No Ta heat shield added.
Monday, September 16, 2019, 14:47: Roughing.
Monday, September 16, 2019, 14:55: Turbo pump on.
Monday, September 16, 2019, 15:04: Timed out. Open RV1
Monday, September 16, 2019, 15:05: Restart Turbo pump.
Monday, September 16, 2019, 15:14: Attempt stop / restart before timeout.
Monday, September 16, 2019, 15:21: Turbo pump unable to pass 4krpm. Close for re-attempt tomorrow am.
Tuesday, September 17, 2019, 12:33: Venting. Sort out pump down issues.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 650A at 2.0A/min.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Wednesday, September 18, 2019, 08:50: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 3.34e-05T & dropping.
Wednesday, September 18, 2019, 08:25: Roughing.
Wednesday, September 18, 2019, 08:34: Turbo pump on.
Wednesday, September 18, 2019, 10:22: TGHT manually to 40A. Vacuum @ 3.18e-06T.
Wednesday, September 18, 2019, 10:25: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 350 / 180 A.
Wednesday, September 18, 2019, 13:43: Vacuum @ 2.30e-06T. Temp @ 1120 deg C. TGHT / TBHT @ 350 / 180 A.
Wednesday, September 18, 2019, 13:45: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 550 / 215 A.
Thursday, September 19, 2019, 06:39: Vacuum @ 8.79e-07T. Temp @ 1722 deg C. TGHT / TBHT @ 550 / 215 A.
Thursday, September 19, 2019, 06:42: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 600 / 230 A.
Thursday, September 19, 2019, 08:18: Auto-ramping TGHT to 630A @ 2 A per min
Step up to desired temp
Thursday, September 19, 2019, 08:49: Vacuum @ 3.22e-06T. TGHT / TBHT 645 (642.7) / 230 (233.44) A. TGHT Voltage= 12.501V. Omega: 1902-1903 deg C. Desired temperature = 1900C reached.
Thursday, September 19, 2019, 14:17: Vacuum @ 1.45e-06T. Begin auto-cooling TGHT / TBHT @ -1 / -1 A per min.
Friday, September 20, 2019, 07:59: Turbo pump off. PS / Sources off.
Friday, September 20, 2019, 08:42: Venting. |
Attachment 1: Ta#59_Evap_2_Conditioning..docx
|
458
|
Tuesday, September 17, 2019, 13:25 |
Aaron Schmidt | | | LP-SIS | Problems resolved | Turbo pump / roughing troubleshoot. | Swapped out VCRs on HS to tray connection. (Right one felt slightly off)
Tuesday, September 17, 2019, 13:23: roughing.
Tuesday, September 17, 2019, 13:32: Turbo pump on.
Tuesday, September 17, 2019, 13:44: waterlines re-opened. No vacuum response. Ok. @ 7.90e-05T & dropping.
Wednesday, September 18, 2019, 08:05: Vacuum ok @ 6.87e-07T. Turbo pump off.
Wednesday, September 18, 2019, 08:21: Venting.
Pumped down again easy for Ta#59. Issue resolved. |
461
|
Thursday, October 03, 2019, 09:26 |
Darwin Ortiz Rosales | TaC | 44062-6 | LP-SIS | Done | TaC coating/sintering | Thursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 427 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down previous night.
IGP1= 7.81e-07 Torr
Manually tapping up to ~40A on both TGHT and TBHT at ~1A/min
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Thursday, October 03, 2019, 09:21
Manually tapped to 50A on TGHT and TBHT
Will allow pressure to stabilize and begin autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
autoramp increments might be increased to 2A/min depending on stability of system.
Thursday, October 03, 2019, 10:00
TGHT = 51.6A, 0.36V
TBHT = 49.5A, 0.62V
IGP1=9.6e-7 Torr
Starting autoramp at 1A/min to a max of 400A for TGHT and 230A for TBHT. Will monitor and increase ramp increments to 2A/min if stable.
Thursday, October 03, 2019, 11:09
TGHT = 103A, TBHT=97A
IGP1=9.1e-06 Torr and dropping
Will increase autoramp increments to 2A/min
Thursday, October 03, 2019, 11:41
With TGHT = 148A, 1.9V and TBHT = 141A, 2.3V
IGP1= 7.9e-6 Torr
Autoramp was increased to 3A/min
Thursday, October 03, 2019, 13:45
TGHT=401A, 6.9V
TBHT=233A, 4.2V
IGP1= 1.14e-05Torr
OMEGA = 1874
begin manual ramp to 1900C
(Temperature dropping as pressure drops)
Thursday, October 03, 2019, 14:11
TGHT= 416A, 7.1V
TBHT=233A, 4.2V
OMEGA = 1900 C
IGP1= 6.9e-06 Torr and trending down
Thursday, October 03, 2019, 15:24
TGHT manually bumped to 421A, 7.2 V because temperature dropped slightly.
Thursday, October 03, 2019, 19:00
TGHT manually increased to 425A, 7.3V
Thursday, October 03, 2019, 19:12
TGHT = 424.9A, 7.3V
TBHT=233.2A, 4.1V
OMEGA= 1897 C
IGPA=1.45e-06 Torr
Starting ramp-down at -1A/min on TGHT and 0.5A/min on TBHT
Friday, October 04, 2019, 11:34
Container taken out.
|
464
|
Thursday, October 17, 2019, 13:53 |
Darwin Ortiz Rosales | TaC | 44062-3 | LP-SIS | In progress | TaC coating/sintering | Thursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1= 7.0 e-07 Torr
Thursday, October 17, 2019, 13:53
After pressure stabilization at 40A:
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Friday, October 18, 2019, 6:20
TGHT = 400A, 6.52V, TBHT= 233A, 4.1V
OMEGA = 1733C
Start autoramp to 430A on TGHT at 1A/min
Friday, October 18, 2019, 7:05
TGHT= 431A, 7.1V
TBHT= 233A, 4.1V
IGP1= 1.13e-06 Torr
OMEGA = 1828 C
Set autoramp to 465 at 1A/min
Friday, October 18, 2019, 11:13
TGHT = 465A, 7.8V, TBHT = 233A, 4.1V
OMEGA = 1865C
(Something is different with the heat dissipation on this target. Will leave at this current and start cooling at 1200 noon to avoid container strain)
Friday, October 18, 2019, 12:00
TGHT = 462.7A, 7.8V
TBHT= 233.4A, 4.1V
OMEGA = 1863C
IPG1= 1.02e-06 Torr
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Monday, October 21, 2019, 09:11
Pump down and dismount.
|
479
|
Wednesday, March 18, 2020, 07:21 |
Marla Cervantes | TaC | 44139-11 | LP-SIS | Done | TaC coating/sintering | Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down on the previous night.
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial pressure IGP1 = 4.8e-7Torr
Wednesday, March 18, 2020, 09:29
After an hour pressure reduced to 5.45e-6 Torr
TGHT; 0.518 V, 40.5 A
TBHT: 0.41 V, 38.6 A
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Wednesday, March 18, 2020, 18:29
TGHT = 400A, 6.6V, TBHT= 232.9, 3.9V
OMEGA = 1240 C, this is 500 degC lower than previous LP-SIS at same conditions
https://elog.triumf.ca/TIS/Evaporator_2/464
Start autoramp to 460A on TGHT at 1A/min
Wednesday, March 18, 2020, 20:51
TGHT: 464 A, 7.75 V
Temperature 1328, I won't increase the temperature because there is a chance that the reading is 500 degC off and the target is sitting at 1828 degC instead of 1328 degC
Wednesday, March 18, 2020, 23:17
After ~4 hours at 1317 degC according to the pyrometer:
TGHT = 7.7 V, 457.8 A,
TBHT = 3.9 V, 232.9 A,
IGP1 = 1.16e-6
Commence cooling at -2A/min for TGHT and -1A/min for TBHT
Thursday, March 19, 2020, 15:53
Venting and dismounting.
The coating does not have the quality to be used online, another LP-SIS will be coated and sinter |
Attachment 1: IMG_1538.JPG
|
|
483
|
Sunday, May 24, 2020, 13:39 |
Marla Cervantes | Empty | 44139-11 | LP-SIS | Done | TaC coating/sintering | Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1 = 2.5e-7 Torr
Sunday, May 24, 2020, 08:24
Autoramp deliver 40 A
TGHT = 0.58 V, 39.6 A
TBHT = 0.46 V, 39.81 A
IGP1 = 2.9 e-7 Torr and increasing
Heater conditions will be hold for 15 min to account for pressure changes.
Sunday, May 24, 2020, 08:39
IGP1 = 2.7e-7 Torr and decreasing
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Sunday, May 24, 2020, 14:57
After 15 min the autoramp stopped
TGHT = 6.8 V, 394.65 A
TBHT =4 V, 232.9 A
IGP1 = 2.2e-6 Torr and going down
Omega = 1747 degC
Autoramp set to TGHT 1A/min to 450A
Sunday, May 24, 2020, 16:07
After 15 min the autoramp stopped
TGHT = 7.7 V, 448 A
IGP1 = 2.88e-6 Torr
Omega = 1886 degC
The current will be increased manually to reach 1900 deg C
Final TGHT = 7.9 V, 453.15 A (455 A input)
Omega = 1899 degC
The TGHT and TBHT will leave at current conditions until pressure reduce (approx 4 hours)
Sunday, May 24, 2020, 20:01
TGHT = 7.9 V, 456 A
TBHT = 4 V, 232.9 A
IGP1 = 1.8e-6 Torr
Omega = 1893 degC
Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively. |
Attachment 1: TaC-coating-sintering.PNG
|
|
485
|
Friday, May 29, 2020, 10:26 |
Marla Cervantes | Empty | 43044-8 | LP-SIS | Done | TaC coating/sintering | Friday, May 29, 2020, 08:52
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Desired temperature= 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Good vacuum= 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Ramped TGHT and TBHT to 40A at 0.5A/min
Initial IGP1 = 3.7e-7 Torr
Friday, May 29, 2020, 10:23
Autoramp deliver 40 A
TGHT = 0.47 V, 40.72 A
TBHT = 0.5 V, 38.78 A
IGP1 = 4.5 e-6 Torr and going down
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Friday, May 29, 2020, 11:27
Autoramp was stopped at 70 A, since pressure kept increasing, current was manually decreased to 65 A in both TGHT and TBHT.
The system will remain at current conditions until pressure reduce.
Friday, May 29, 2020, 12:44
Autoramp TGHT and TBHT at 1A/min to 400A and 230A respectively.
Saturday, May 30, 2020, 00:23
Autoramp deliver 400 A at TGHT and 230 A at TBHT
TGHT = 7.8 V, 453.9 A
TBHT = 4.21 V, 232.9 A
IGP1 = 9.7 e-6 Torr and going down
Omega = 1893 degC
Autoramp TGHT and TBHT at -1A/min to 400 A
Initiating auto-cool at -2.0A/min and -1.0A/min for the TGHT and TBHT respectively
|
Attachment 1: e-log-485.PNG
|
|
486
|
Monday, June 01, 2020, 12:03 |
Aaron Schmidt | Ta | 44139-13 | LP-SIS | In progress | Ta#60 Conditioning | Ta#60 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 14.081 g/cm3
Target length = 3.33 cm
Total Mass = 46.891 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 445g w/ end caps)
Discs in target are arranged as follows: 1pack / 75singles / 1pack / 100singles / 2packs / 100singles / 1pack / 75singles / 1pack
End caps installed (Expanded). No Ta heat shield added.
https://elog.triumf.ca/TIS/Target+Production/98
Monday, June 01, 2020, 11:38: Roughing.
Monday, June 01, 2020, 12:03: Turbo pump on.
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A + at 2.0A/min.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Tuesday, June 02, 2020, 07:13: Omega slope set to 0.98. Power supplies / sources on. vacuum@ 5.13e-07T.
Tuesday, June 02, 2020, 07:16: Manually tap up TGHT / TBHT to 40 / 5 A. Vacuum @ 5.08e-07T.
Tuesday, June 02, 2020, 07:19: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 150 A.
Tuesday, June 02, 2020, 10:02: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 450 / 200 A. Vacuum @ 1.39e-06T. TGHT Voltage= 5.955V. Omega: 1288 deg C.
Tuesday, June 02, 2020, 11:54: Auto-ramping TGHT / TBHT @ 2 / 1 A per min to 500 / 230 A. Vacuum @ 1.85e-06T. TGHT Voltage= 7.998V. Omega: 1528 deg C.
Tuesday, June 02, 2020, 13:16: Auto-ramping TGHT @ 2 A per min to 550 A. Vacuum @ 2.51e-06T. TGHT Voltage= 9.060V. Omega: 1625 deg C.
Tuesday, June 02, 2020, 13:58: Auto-ramping TGHT @ 2 A per min to 600 A. Vacuum @ 3.53e-06T. TGHT Voltage= 9.060V. Omega: 1728 deg C.
Tuesday, June 02, 2020, 14:23: Auto-ramping TGHT @ 2 A per min to 625 A. Vacuum @ 5.56e-06T. TGHT Voltage= 11.236V. Omega: 1821 deg C.
Tuesday, June 02, 2020, 14:36: TGHT / TBHT 625 / 230 A. Vacuum @ 6.65e-06T. TGHT Voltage= 11.724V. Omega: 1865 deg C.
Tap up TGHT manually.
Tuesday, June 02, 2020, 14:48: TGHT / TBHT 643 / 230 A. Vacuum @ 7.24e-06T. TGHT Voltage= 12.129V. Omega: 1901-1903 deg C.
Desired temperature = 1900C reached.
Tuesday, June 02, 2020, 22:20: TGHT / TBHT 643 / 230 A. Vacuum @ 2.05e-06T. TGHT Voltage= 12.212V. Omega: 1901-1903 deg C.
Tuesday, June 02, 2020, 22:22: Auto-Cooling @ 1 A per min.
Wednesday, June 03, 2020, 06:08: TBHT @ 0. TGHT set for Auto-Cooling @ 2 A per min.
Wednesday, June 03, 2020, 11:38: PS off. Turbo pump off.
Wednesday, June 03, 2020, 12:40: Venting. |
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10, 2020)
Container coated with TaC and wrapped with 3 Ta heat shields.
Desired temperature= 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 400A, TGHT will be tapped up accordingly to reach desired Temp.
TBHT will be set fixed at 230 A (max).
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Chamber pump down
Thursday, June 11, 2020, 10:19
IEVAP2:IGP1=1.06e-6 Torr
ramping to 40A (TGHT and TBHT) at 1A/min
Thursday, June 11, 2020, 12:35
IEVAP2:IGP1=1.8e-6 Torr
TGHT = 39.8 A, 0.45V
TBHT=38.5 A, 0.48V
Manually rampted to 45A on both TGHT and TBHT
Thursday, June 11, 2020, 12:58
IEVAP2:IGP1=1.6e-6 Torr
TGHT = 34.8 A, 0.52V
TBHT=44.2A, 0.55V
Start Autoramp at .5A/min to 400A on TGHT and 230A on TBHT
Thursday, June 11, 2020, 17:14
Irregular pressure profile. Cooling . Need to check for leak.
TGHT = 99 A 1.3 V
TBHT = 99 A 1.4 V
Friday, June 12, 2020, 12:59
Restarting ramping
IGP1= 4.98e7 Torr
Autoramp at 1A/min to 400A on TGHT and 230A on TBHT
(pressure and TGHT current and voltage profile seem normal compared to previous coating sintering with the same power supply)
Friday, June 12, 2020, 14:40
Paused ramping
TGHT = 90A
After a few minutes the profile (noise) was still there. Continue autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT
Friday, June 12, 2020, 15:21
IGP1= 1.97e-06 Torr trending down
TGHT = 111.5 A , 1.5 V
TBHT = 112.9 A, 1.9 V
Increase ramping speed to 1A/min to 400A on TGHT and 230A on TBHT
Friday, June 12, 2020, 20:50
OMEGA = 1754 C
IGP1= 2.5e-6 Torr
TGHT = 394.1 A, 6.6 V
TBHT = 232.8 A, 4.0 V
Tapping to 1900 C
Friday, June 12, 2020, 21:00
OMEGA =1901 C
IGP1= 5.6e-6 Torr
TGHT = 448.3 A, 7.5 V
TBHT = 232.8 A, 4.1 V
Saturday, June 13, 2020, 00:51
OMEGA = 1898 C
IGP1 = 2.0e-6 Torr
TGHT = 447.2 A, 7.5 V
TBHT = 232.9 A, 4.1 V
Start cooling at -2A/ min for TGHT and -1A/min for TBHT
|
Attachment 1: WO#_44139-12_TaC_sintering.PNG
|
|
490
|
Thursday, July 16, 2020, 11:15 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 1 of 2 | Thursday, July 16, 2020, 11:15
Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
Evap 2 was pumped down
Friday, July 17, 2020, 08:49
Total length packed approximately 10 cm
container has 3 Ta heat shields.
No endcaps inserted to facilitate out-gassing
Two TaC coated Ta wire springs inserted at both ends.
Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min
Then heat ramping TGHT manually and automatically to reach 400 A (Omega slope set = 0.990)
Then ramp to temperature = 1800 C
TBHT will be set fixed at 230 A (max). TBHT heated manually and automatically to max.
Good vac at 3.00 e -5 Torr
Bad vac at 5.00 e-5 Torr
Initial IGP1 = 6.45e-07 Torr
Friday, July 17, 2020, 20:49
TBHT = 38.9 A, 0.47 V
TGHT = 39.7 A, 0.59 V
IGP1 = 9.1e-06 Torr
Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT
Saturday, July 18, 2020, 09:04
IGP1 = 1.6e-06 Torr
TGHT = 50.5 A, 0.76V
TBHT = 49.7 A, 0.62 V
Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT
Saturday, July 18, 2020, 10:17
IGP1 = 5.06e-05 torr
stopped autoramp and allow pressure to decrease and stabilize
Saturday, July 18, 2020, 10:47
IGP1 = 6.65 e-06 Torr and trending down
TGHT = 55.4 A, 0.83 V
TBHT= 54.6 A, 0.68 V
Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait)
Sunday, July 19, 2020, 08:46
IGP1= 2.2 e-05 Torr
TBHT = 109.5 A, 1.6 V
TGHT = 106.6 A, 1.7 V
increased ramping rate to .5A/min by decreasing wait intervals to 60 s
Sunday, July 19, 2020, 14:55
IGP1 = 7.1 e -06 Torr
TGHT = 271.8 A, 4.7 V
TBHT = 233.1 A, 4.1 V
Increasing ramping rate to 1 A/min
Sunday, July 19, 2020, 17:35
IGP1 = 2.6e-06 Torr
TGHT = 400 A, 7.2 V
TBHT = 233 A, 4.1 V
Tap manually to 410 (expected 1800 C )
Note* OMEGA reading cannot be obtained.
Leave at 410 A on TGHT for 4 hours.
Sunday, July 19, 2020, 22:57
IGP1 = 7.0 e-07 Torr
TGHT= 410 A , 7.2 V
TBHT = 233 A, 4.2 V
Start cool down at -2A/min for TGHT and -1A/min for TBHT
Monday, July 20, 2020, 12:20
IGP1 = 2.2e-07 Torr
Unloading target |
491
|
Monday, July 20, 2020, 19:25 |
Darwin Ortiz Rosales | SiC | 44139-11 | LP-SIS | Done | SiC sintering for Luca 2 of 2 | Monday, July 20, 2020, 19:27
Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)
Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).
good vacuum = 3.00 e-05 Torr
bad vacuum = 5.00 e-05 Torr
Evap 2 was left to pump down over night.
Monday, July 20, 2020, 23:06
IPG1 = 3.1e-06 Torr
Start autoramp at .25A/min to 40A for both TGHT and TBHT
Tuesday, July 21, 2020, 08:06
TGHT = 40.3 A, 0.51 V
TBHT = 39.0 A, 0.46 V
increase auto ramp limit to 50 A for both TGHT and TBHT
IGP1=1.8e-05 Torr
Tuesday, July 21, 2020, 16:22
IGP1= 1.5 e-05 Torr
TGHT = 50.1 A, 0.65 V
TBHT = 50.0 A, 0.60 V
Change ramp target to 350 A for TGHT and 230A for TBHT
Wednesday, July 22, 2020, 13:24
Stopped autoramp. Will allow pressure to drop.
TGHT = 64.0 A, 0.86 V
TBHT = 64.5 A, 0.82 V
Thursday, July 23, 2020, 23:55
TGHT Reached 430 A, 7.7 V
OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.
Friday, July 24, 2020, 11:31
IGP1 = 1.98e-07 Torr
Window for pyrometer was coated with condensate.
Dismounted target and cleaned two windows in line with the pyrometer.
|
507
|
Thursday, September 17, 2020, 16:11 |
Marla Cervantes | Empty | 44139-9 | LP-SIS | Done | TaC coating/sintering | Thursday, September 17, 2020, 16:10
An LP-SIS was wrapped with 3 Ta layers, and installed in the EVAP2
Desired temperature= 1900 C, Omega Slope = 0.990
Friday, September 18, 2020, 10:56
IGP1 = 4.4e-7 Torr
Leak check performed, no leak observed
Friday, September 18, 2020, 11:16
Power supplies on.
Good vac at 3.00e -5 Torr
Bad vac at 5.00e-5 Torr
Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT
Friday, September 18, 2020, 11:21
Autoramp paused because, TBHT is not ramping
Ramping manually current to 10 A in 0.5 A steps
Friday, September 18, 2020, 11:38
Restarted autoramp (Autoramp at 0.5A/min to 400A on TGHT and 230A on TBHT)
Friday, September 18, 2020, 22:50
IGP1 = 2.04e-6 Torr
TGHT = 5 V, 322.8 A
TBHT = 4 V, 233.1 A
Omega = 1459 °C
Autoramp changed to 0.2 A/min to 450 A
Saturday, September 19, 2020, 10:49
IGP1 = 8e-7 Torr
TGHT = 7.3 V, 449.1 A
TBHT = 4 V, 233.1 A
Omega = 1789 degC
Saturday, September 19, 2020, 13:25
IGP1 = 6.5 e-7 Torr
TGHT 7.2 V, 447.975 A
TBHT = 4.08 V, 233.09 A
Omega = 1785 °C
Saturday, September 19, 2020, 13:26
Starting ramp down at Commence cooling at -2 A/min for TGHT and -1 A/min for TBHT
Monday, September 21, 2020, 09:16
Turning off pumps
Monday, September 21, 2020, 16:47
EVAP2 was vented with air and the tantalum oven was removed, the coating seems sintered. |
513
|
Tuesday, October 06, 2020, 14:23 |
Aaron Schmidt | Ta | 44508-1 | LP-SIS | In progress | Conditioning Ta#61 | Ta#61 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 12.76 g/cm3
Target length = 3.4 cm
Total Mass = 43.388 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 464 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 100 singles / 1pack / 75 singles / 2packs / 75 singles / 1pack / 100 singles / 1pack
End caps installed (not yet expanded). No Ta foil heat shield added
TBHT will be ramped up to 230A at 1.0A/min.
TGHT will be ramped up to 600A + at 2.0A/min.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Tuesday, October 06, 2020, 14:17: Roughing.
Tuesday, October 06, 2020, 14:36: Turbo pump on.
Tuesday, October 06, 2020, 14:43: Turbo pump not spinning up. Holding at 4 krpm. Will need to vent and Troubleshoot in the am.
Attempted to run the turbo pump again. Only runs to 4 krpm. Shut down to avoid trip. Vent & remove Flex-line HS. Change all the SS gaskets. Re-install Flex-line HS w/ Ta#61.
Wednesday, October 07, 2020, 09:16: Roughing.
Wednesday, October 07, 2020, 09:32: Turbo pump on.
Wednesday, October 07, 2020, 10:05: Multiple attempts made to spin up the turbo pump. TP1 holds at 4 krpm, occasionally to 5 krpm, times out & trips.
Wednesday, October 07, 2020, 10:08: Shut off TP1 & backing pump.
Replaced TP1. https://elog.triumf.ca/TIS/Evaporator_2/514
Wednesday, October 07, 2020, 13:45: TP1 off. Soft start function off. Remote start configuration initiated. TP1 on @ 38krpm. OK.
Wednesday, October 07, 2020, 13:47: Vacuum @ 1.31e-05T.
Wednesday, October 07, 2020, 13:49: Waterlines opened. Vacuum ok @ 1.27e-05T.
Wednesday, October 07, 2020, 13:50: PS switched on.
Wednesday, October 07, 2020, 15:24: Slope set @ 0.98. Vacuum @ 3.30e-06T.
Wednesday, October 07, 2020, 15:26: TGHT / TBHT on. Manually tap up to 10 / 10 A.
Wednesday, October 07, 2020, 15:28: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 / 1 A per min.
Thursday, October 08, 2020, 05:23: Vacuum @ 7.00e-07T.
Thursday, October 08, 2020, 05:25: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2 / 1 A per min. Temp @ 996 C
Thursday, October 08, 2020, 06:44: Auto-ramping TGHT / TBHT to 550 / 230 A @ 2 / 1 A per min. Temp @ 1426 C
Thursday, October 08, 2020, 07:43: Vacuum @ 3.88e-06T. Temp @ 1685 C.
Thursday, October 08, 2020, 07:45: Auto-ramping TGHT to 600 A @ 2 A per min.
Thursday, October 08, 2020, 08:42: Auto-ramping TGHT to 630 A @ 2 A per min. Vacuum @ 4.01e-06T. Temp @ 1800 C.
Thursday, October 08, 2020, 09:07: Auto-ramping TGHT to 645 A @ 2 A per min. Vacuum @ 4.91e-06T. Temp @ 1851 C.
Thursday, October 08, 2020, 09:19: Auto-ramping TGHT to 655 A @ 2 A per min. Vacuum @ 5.37e-06T. Temp @ 1879 C.
Thursday, October 08, 2020, 09:28: TGHT @ 650-657 A. Vacuum @ 5.70e-06T. Temp @ 1901 C. Desired temperature reached*
Thursday, October 08, 2020, 09:59: TGHT @ 650-657 A. Vacuum @ 4.64e-06T. Temp @ 1903 C.
Thursday, October 08, 2020, 10:01: Auto-cooling TGHT / TBHT @ -3 / -2 A per min.
Thursday, October 08, 2020, 13:57: TP1 / PS off.
Thursday, October 08, 2020, 14:08: Venting.
Thursday, October 08, 2020, 14:15: Flex-Line HS removed w/ Ta#61. |
519
|
Wednesday, October 21, 2020, 14:39 |
Aaron Schmidt | Nb | 44508-2 | LP-SIS | In progress | Conditioning Nb#9 | Nb#9 LP-SIS target description:
Total Ta foils = 470 [6x20 packs + 350 single discs]
Foil Thickness = 0.025mm
Target density = 7.24 g/cm3
Target length = 3.5 cm
Total Mass = 25.343 g [Incl foils + Ta wire on 6 packs]
Total mass w/ Target oven= 425 g (w/ end caps)
Discs in target are arranged as follows: 1pack / 75 singles / 1pack / 100 singles / 2packs / 100 singles / 1pack / 75 singles / 1pack
End caps installed (not yet expanded). No Ta foil heat shield added.
Final desired temperature = 1900C.
OMEGA slope = 0.98.
Wednesday, October 21, 2020, 14:09: Roughing.
Wednesday, October 21, 2020, 14:32: Turbo pump on.
Wednesday, October 21, 2020, 15:29: Waterlines opened. Vacuum ok @ 1.05E-05T.
Wednesday, October 21, 2020, 15:30: TGHT / TBHT PS on. Slope Set.
Wednesday, October 21, 2020, 19:06: Auto-ramping TGHT / TBHT to 300 / 100 @ 1 A per min. Vacuum @ 1.85e-06T.
Thursday, October 22, 2020, 07:26: Auto-ramping TGHT / TBHT to 500 / 200 @ 2 A per min. Vacuum @ 7.61e-07T.
Thursday, October 22, 2020, 11:28: Auto-ramping TGHT / TBHT to 580 / 230 @ 2 A per min. Vacuum @ 1.53e-06T. The Omega IR2C is back. Temp @ 1576 deg C.
Thursday, October 22, 2020, 12:22: Auto-ramping TGHT to 625 A @ 2 A per min. Vacuum @ 2.47e-06T. Temp @ 1734 C.
Thursday, October 22, 2020, 12:48: Auto-ramping TGHT to 645 A @ 2 A per min. Vacuum @ 3.11e-06T. Temp @ 1815 C.
Thursday, October 22, 2020, 13:10: Auto-ramping TGHT to 660 A @ 2 A per min. Vacuum @ 3.39e-06T. Temp @ 1851 C.
Thursday, October 22, 2020, 13:25: Manually tap up TGHT until 1900 C. Vacuum @ 3.53e-06T.
Thursday, October 22, 2020, 13:30: TGHT @ 673 A. Temp @ 1903 C. Vacuum @ 3.79e-06T.
Thursday, October 22, 2020, 14:00: Auto-cooling @ 1 A per min.
Friday, October 23, 2020, 07:50: PS off. Turbo pump off. Purge waterline.
Friday, October 23, 2020, 09:02: Venting. |
533
|
Tuesday, March 02, 2021, 11:32 |
Darwin Ortiz Rosales | TaC | 44691-5 | LP-SIS | Done | TaC coating/sintering | Tuesday, March 02, 2021, 11:26
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 433.8 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over night.
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Wednesday, March 03, 2021, 13:28
IGP1 = 4.0 e-7 Torr
Start ramping @ 1A/min to 20A on both TGHT and TBHT
Wednesday, March 03, 2021, 15:03
Start ramping @1/min to 60A on Both TGHT and TBHT
Wednesday, March 03, 2021, 22:42
TGHT = 60A, TBHT = 60A
IGP1= 4.2 e-7 stable
Start ramping to 400A @ .5A/min for TGHT and @0.5A/min for TBHT to 230A
Thursday, March 04, 2021, 11:56
TGHT = 400 A, TBHT =230A
IGP1= 1.9e-6 Torr
OMEGA = 1695 C
Continue ramp up @0.5A/min to 430A on TGHT
Thursday, March 04, 2021, 14:02
IGP1 = 1.87e-6 Torr
TGHT = 434 A , 7.2 V
OMEGA = 1787 C
Will tap up manually 450A @ on TGHT and leave at that current for ~4 hours
Thursday, March 04, 2021, 19:35
After ~ 5 hours at 1829 C max OMEGA reading
OMEGA = 815 C
Start ramp down at 1A/min on TGHT and 0.8A/min for TBHT
IGP1= 1.2e-6 Torr
|
534
|
Friday, March 05, 2021, 10:48 |
Darwin Ortiz Rosales | TaC | 44691-1 | LP-SIS | Done | TaC coating/sintering | Friday, March 05, 2021, 10:47
Ta tube was coated with TaC and wrapped with Ta heat-shields (3 layers)
Initial weight including heat-shields = 431.0 g
Desired temperature = 1900 C (expected TGHT ~430 A), TBHT will be set fixed at 230A (max).
Evap 2 will be pumped down over night.
Good vacuum = 3.00 e-5 Torr
Bad vacuum = 5.00 e-5 Torr
Saturday, March 06, 2021, 10:29
IGP1= 2.7 e-07 Torr and stable
AutoRamp at 1A/min to 40 A on TGHT and TBHT
Saturday, March 06, 2021, 22:36
IGP1= 2.2e-07 Torr
TGHT = 40.3 A, .46V
TBHT = 38.48 A, .48 V (set to 40 A)
Start Autoramp at 0.5A/min to 400 A on TGHT and 230A on TBHT
Sunday, March 07, 2021, 07:48
IGP1=8.5e-7 Torr
TGHT = 287 A, 4.6V
TBHT = 232 A, 4.0 V
OMEGA = 1493C
Increase ramp speed on TGHT to 2A/min to 400A
Sunday, March 07, 2021, 08:36
IGP1=1.7 e-06 Torr
TGHT = 373.7 A, 6.3V
TBHT = 232.9 A, 4.1 V
OMEGA = 1752 C
Sunday, March 07, 2021, 08:53
IGP1= 1.7e-06 Torr
TGHT = 400 A, 6.8 V
TBHT = 232.8 A, 4.1 V
OMEGA= 1842
Ramp TGHT @ 2A/min to 420 A as per attached current approximation
Sunday, March 07, 2021, 09:25
OMEGA=1915 C
TGHT = 420A, 7.2V
TBHT= 232.8 A, 4.1V
IGP1= 1.6 e-06 Torr
Tap down manually to approx 1900 C
TGHT = 412.9 A, 7.0 V and OMEGA=1900 C
Will leave for about 4 hours at this temperature
Sunday, March 07, 2021, 13:05
IGP1= 1.1 e-06 Torr
TGHT = 415 A, 7.2 V
TBHT = 232.8 A, 4.1 V
OMEGA = 1880C
Start cool down at -2A/min on TGHT and -1A/min TBHT
|
Attachment 1: 2021-03-07_090107-44691-1_Tac_Sintering.png
|
|
|