  376   Friday, June 16, 2017, 15:14 Laura LambertSiC40282-4TARGET BOATDoneSintering SiC pellets

Marla Cervantes wrote:

Laura Lambert wrote:

 Wednesday, June 14, 2017, 15:49

Pellets previously made by Marla and weighed.

Pellets are placed inside a small graphite sample tube.

Graphite sample tube loaded with pellets is loaded into a previously TaC coated boat.

Boat is wrapped with 3x Ta heat shields.

Loaded into evap2.

Chamber currently pumping down.


 Thursday, June 15, 2017, 11:24

HS water valves were opened this morning, no leaks detected.

Tapped up manually to 50A, 0.44V

Vacuum currently rising starting to settle.

IGP1 = 1.51e-6 Torr.

One vacuum stabilizes will initiate auto ramp at a rate of 1.0 A/min up to a final set point of 150 A.

Final desired temperature of 1800C.


 

 Friday, June 16, 2017, 10:37

IGP1 = 7.91e-7 torr.

TGHT = 167 A, 2.3 V.

Tapped up manually to 350A yesterday, remained there overnight.

IGP1 = 4.55e-7 torr

TGHT=350 A, 5.6 V,

Changed slope to 0.98

Checked temperature readings with mikron to confirm slope

Mikron LS = 1260C, RS=1290C

OMEGA= 1295C

Initiating auto ramp at 1.0A/min to a final set point of 450A.

Final desired temperature of 1600C (no longer need to go to 1800C).

*note: graphite sample tube has graphite endcaps inserted


 

 Friday, June 16, 2017, 15:10

Tapped up manually to 420A and auto ramp at 1.0A/min to 450A.

IGP1= 7.15e-7 torr

TGHT=450 A, 7.85 V

OMEGA = 1605C

Process completed, initiating auto cool at 1.0A/min

Elog entry by Pauline


 Monday, June 19, 2017, 16:18

Vented in air and removed from evap2 this a.m.

Weirdly TGHT had tripped off at 10pm on friday June 16th

TGHT = 58A when it tripped off.

Nothing else tripped.

Power supply was still on.

Water was still running

But, in the epics water control box it showed green boxes for TGHT, HS and CHILLER...but all said trip in yellow next to the boxes...odd...

Also noted, before removing from evap2, noticed both legs were bent and touching heat shield, will look further into this...


 

Attachment 1: 20170619_111816.jpg
20170619_111816.jpg
Attachment 2: 20170619_111848.jpg
20170619_111848.jpg
  386   Monday, August 21, 2017, 17:32 John WongSiC TARGET BOATDoneCarbonization of sol-gel SiO2+CNT

Monday, August 21, 2017, 17:09

Two pellets of sol-gel SiO2+CNT were produced.  See lab book pg 44-46 for details. 

Samples were loaded in Ta boat, wrapped with heat shield (1 layer)

Synthesis temperature = 1600C.  TGHT ~ 460A/8.0V

Vacuum at 7.5 e-6 Torr.

TGHt Auto-ramp at 01A/min to reach 350A. 


 Thursday, August 24, 2017, 00:28

TGHT reached to 350A/5.9V, temp @ 1230C (in-line with the last measurement see elog 378).

Increase TGHT to 430, ramp at 0.1A/min.


 Thursday, August 24, 2017, 23:42

TGHT reached to 430A/7.87V, temp at 1410C. Outgassing pressure reached to peak at 430A before TGHT stabilized.  (Evolution of SiO(g)???)

Ramp up to 460A at 0.1A/min.


 Friday, August 25, 2017, 10:30

TGHT reached to 460A/8.6V, temp at 1520C.  More outgassing was observed as temp was increased.

Tapping up TGHT to reach 1600c.


Friday, August 25, 2017, 15:17

Temp reached to 1600C; TGHT at 492 A/9.3 V.  Temperature was held for 3 hours.  Due to a problem with the backing pump, the cooling down process was initiated. 

Sample will be taken out next Monday for evaluation.


 

  450   Monday, June 24, 2019, 08:42 Darwin Ortiz RosalesSiC42464-4HP-FEBIADDoneConditioning of BSiC discs

Monday, June 24, 2019, 08:24

Total number of foils: 484

Total mass in  including container = 1495 grams

Total length packed 17.28 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate outgassing

Two TaC coated Ta wire springs inserted at either end.

Initially will heat via autoramp to OMEGA 1400 C , ramping TGHT at  0.1 A/min to reach 530A A (Omega slope set = 0.990)

Then temperature= (Correction to 1800C) 1900 C, Omega Slope set = 0.990, Auto TGHT at 0.2A/min to reach 700A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT at 0.1 A/min.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System was pumped down on Friday June 24th, 2019.

IGP1= 3.3 e-07 Torr

(EPICS was down this morning and came back up around 930 a.m.)

Will proceed to manually tap up TGHT and TBHT to 40A as soon as EPICS stability confirmed


Mondayy, June 24, 2019, 15:30

TBHT = 39 A, 0.4V

TGHT=40 A, 0.1V

IGP1= 4.3 e-06 Torr and trending down

Autoramp increments to 0.1 A/min , to 400A on TGHT and 230A on TBHT


Tuesday, June 25, 2019, 08:40

Current has only increased to 53 A and pressure limit reached.  Lowered current back to 51 A on TGHT and TBHT.  Waiting for pressure to stabilize.


Tuesday, June 25, 2019, 12:16

TGHT 51.3 A, 0.39 V

TBHT 51.1 A, 0.58 V

IGP1 = 1.91 e-05 Torr

Starting autoramp with  increments to 0.1 A/min , to 400A on TGHT and 230A on TBHT


 Saturday, June 29, 2019, 22:45

Autoramp increments for TGHT set to 0.2 A/min

 IGP1=2.4 e-06 Torr


 Sunday, June 30, 2019, 07:46

Autoramp incrementsTGHT set to 0.1 A/min to prevent pressure spike. 

IGP1= 1.5 e-05 Torr

 Sunday, June 30, 2019, 08:26

Set autoramp increments on TGHT back to 0.2 A/min


Sunday, June 30, 2019, 15:47

Set autoramp max on TGHT to 500 A


Sunday, June 30, 2019, 21:15

OMEGA = 1240C

TGHT= 465A, 7.0V

TBHT = 233A, 3.2V

IGP1= 1.6 e-05 Torr

Set autoramp max on TGHT to 600A


Monday, July 01, 2019, 09:48

OMEGA = 1605 C

TGHT = 599A, 9.7V

TBHT = 233A, 3.2V

IGP1= 1.3 e-06 Torr

Set autoramp max on TGHT to 650A


Monday, July 01, 2019, 18:21

OMEGA = 1630 C

TGHT = 650 A, 10.6V

TBHT = 233A, 3.2V

IGP1 = 9.7 e-07 Torr

Set utoramp max on TGHT to 700A


Monday, July 01, 2019, 22:07

OMEGA = 1663 C

TGHT = 682A, 11.4V

TBHT = 233A, 3.2V

IGP1= 1.5 e-06 Torr

Set autoramp max on TGHT to 730A


Tuesday, July 02, 2019, 08:15

OMEGA =1700 C

TGHT = 730A, 12.0V

TBHT = 233A, 3.2V

IGP1= 1.1 e-06 Torr

Set autoramp max on TGHT to 750A and increments to 0.4A/min


Tuesday, July 02, 2019, 09:49

Temperature on OMEGA began dropping.  Changed OMEGA slope to 1.09 (Elog 371) and temperature reading = 1884 C.  Aborted autoramp and lowered TGHT current to 740A.


Tuesday, July 02, 2019, 12:14

Temperature and pressure have dropped at a consistent rate. 

IGP1= 9.6 e-07 Torr

OMEGA = 1715 C

Will tap up manually to 750A on TGHT

No appreciable increase in pressure will tap back down to 745A on TGHT


Tuesday, July 02, 2019, 13:11

OMEGA = 1675 C

TGHT = 745A, 12.4V

TBHT = 233A, 3.2V

IGP1 = 1.03 e-06Torr

 Will start to ramp- down TGHT @ -2.0A/min


OMEGA = 1354 C

TGHT = 495A, 7.01V

TBHT = 233.2A, 3.2V

IGP1= 2.2 e-07 Torr

Continue ramp-down TGHT @ -2.0A/min


Tuesday, July 02, 2019, 17:14

TGHT = 285.5A, 3.4V

TBHT = 232A, 3.1V

IGP1= 1.4 e-07 Torr

Start TBHT ramp-down at -1.0 A/min


Wednesday, July 03, 2019, 08:37

Turned off TGHT and TBHT

IGP1 = 7.8 e-08 Torr


Wednesday, July 03, 2019, 13:18

Final total weight of Target = 1489.5 g

Removed 18 discs after weighing.

 

 

 

 

  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.

Tuesday, October 08, 2019, 14:14: Remove Flex line HS. 

HS: 42752-1

Waterlines not open yet.

Tuesday, October 08, 2019, 14:15: roughing.

Tuesday, October 08, 2019, 14:24: Turbo pump on. 

Tuesday, October 08, 2019, 14:32: TP @ speed. 


Wednesday, October 09, 2019, 13:24 

The initial pressure was 3.25e-7 Torr

The current was manually increased to 25 A on both TBHT and TGHT  at a rate of 1 A each 30 s for both heaters.


Wednesday, October 09, 2019, 13:33

At 1 pm an additional ram was made to TGHT 350 A and TBHT 200 at same rate.

  466   Friday, November 15, 2019, 13:26 Aaron SchmidtSiC HP-FEBIADProblems resolvedTemp map testing - 1. (Leak issue)

 HS 42752-5 - Setup for Temperature mapping.

Friday, November 15, 2019, 13:26: Roughing. 

Friday, November 15, 2019, 13:36: Turbo pump on. 


Monday, November 18, 2019, 07:46: Waterlines opened. Vacuum ok @ 3.56e-07T.

Monday, November 18, 2019, 07:48: PS on.

Monday, November 18, 2019, 09:21: PS off. Vacuum slowly spiked to 1.23e-06T. Indicative of a small water leak. 

Monday, November 18, 2019, 09:24: HS waterlines purged. vacuum dropped to 5.54e-07T. 

Monday, November 18, 2019, 09:27: Valves closed. TP off. BP off.

Monday, November 18, 2019, 10:27: Venting.

Monday, November 18, 2019, 11:06: Gaskets checked / replaced. Roughing. 

Monday, November 18, 2019, 11:14: turbo pump on. 

Monday, November 18, 2019, 14:19: Waterlines opened. 

Monday, November 18, 2019, 14:23: Response on vacuum. Leak is still present & a higher rate (Has an immediate response). Turbos off. 

Monday, November 18, 2019, 14:28: Venting. 

Monday, November 18, 2019, 14:49: turbo pump on. 


Tuesday, November 19, 2019, 07:07: Waterlines opened. Leak is present.  Turbo pump off. 

Tuesday, November 19, 2019, 11:24: After venting, changed 1 gasket. Setup LD & completed a leak check with the lines pressurized to 75 PSI of He. 

Tuesday, November 19, 2019, 11:25: Roughing. 

Tuesday, November 19, 2019, 11:33: Turbo pump on. 


Wednesday, November 20, 2019, 08:59: Waterlines opened. Leak is present.  Turbo pump off.  

Wednesday, November 20, 2019, 11:26: FEBIAD Removed. U-Line installed to check Evap 2 Connection. FEBIAD examined outside. 

Wednesday, November 20, 2019, 11:34: Turbo pump on. 

Wednesday, November 20, 2019, 13:05: HPA off (Was running through HS line still. Vac @ 5.54e-06T).  

Wednesday, November 20, 2019, 13:07: Open waterline. Vacuum @ 3.88e-06T & dropping steadily.  

Wednesday, November 20, 2019, 13:12: Vacuum @ 3.69e-06T & dropping. No leak detected via Vac. 

Wednesday, November 20, 2019, 13:14: Waterline Closed / purged. Turbo pumps off. 

Wednesday, November 20, 2019, 13:58: Turbo pump on. 

Wednesday, November 20, 2019, 13:50: Cleaned seal / FEBIAD re-installed. Roughing.


Thursday, November 21, 2019, 08:06: Waterlines opened. Vacuum ok @ 4.10e-07T. 

Notes:

1) The FEBIAD left cooling line was the culprit for the leaks. A fine copper build up was noted on the gasket /  sealing face. Images included. 

2) Evap 2 was leak checked separately as well & is OK.

Attachment 1: Test_FEBIAD_2019_-_Nov_-_Leak.docx
Attachment 2: Evap_2_cooling_-_1.jpg
Evap_2_cooling_-_1.jpg
Attachment 3: Test_FEBIAD_Left_HS_cooling_line_-_1.jpg
Test_FEBIAD_Left_HS_cooling_line_-_1.jpg
Attachment 4: Test_FEBIAD_Left_HS_cooling_line_-_2.jpg
Test_FEBIAD_Left_HS_cooling_line_-_2.jpg
  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping.

 Thursday, November 21, 2019, 08:09: PS on. Leak issue resolved (Evap 2 Elog 466). Vacuum @ 4.10e-07T.

Thursday, November 21, 2019, 08:15: Auto-ramping TGHT / TBHT @ 2 A per min to 300 / 150 A. 

  471   Tuesday, November 26, 2019, 15:21 Darwin Ortiz RosalesSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)

Tuesday, November 26, 2019, 14:53

Total number of foils: 504

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at either end.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature= (Correected to 1800C) 1900 C, Omega Slope set = 0.990, manually and automatically ramp to 700A, TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System experienced some vacuum issues due to cooling water leak in a heatshield line. 

Evaluation discs not included because no space.

Total Green disc mass measured = 58.250 g

 


Tuesday, November 26, 2019, 15:00

IGP1= 7.4e-06 Torr.  No leak issues found after last fix (Anders will add details).


Tuesday, November 26, 2019, 15:33

TGHT= 52.7A, .22V   TBHT= 49.3A, .52V

IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).


Wednesday, November 27, 2019, 06:09

left with autoramp waiting for vac to drop but no advance overnight.

Pressure did not seem to drop back below 3e-5 Torr magnitude, therefore not much advance in current ramp.


Thursday, November 28, 2019, 11:15

Continued ramping manually 

OMEGA = 1429 C  (0.99 slope), TGHT = 542A, 7.8V

With slope = 1.08 OMEGA = 1724 C, therefore staying at 0.99 slope

TaC coating sintering  plot suggests 753A to reach 1800C (See attachment 1)

Windows a little bit coated but not enough to disturb laser. 


Thursday, November 28, 2019, 12:17

TGHT =753A, 11.8V since 12:00 noon. 

TBHT= 233.4A, 3.3V

OMEGA= 1735 C (0.99 slope)


 Thursday, November 28, 2019, 13:01

OMEGA = 1860C (1.08 slope)


 Thursday, November 28, 2019, 14:38

OMEGA temperature began to creep up to ~1880.  Tapped TGHT current down to 733.5A, 11.4V


Thursday, November 28, 2019, 15:12

Checked windows and no significant additional buildup of obstructive material.

Temperature creeping up again.  Tap down TGHT current to 729 A, 11.2 V

OMEGA = 1870C at slope 1.08


 Thursday, November 28, 2019, 16:03

Temperature increase to 1880C

Tap down TGHT current to 715A, 10.9V

OMEGA= 1870 C (slope = 1.08)


Thursday, November 28, 2019, 16:22

Temperature creep to 1880 C

Tap down TGHT to 700A, 10.8V

OMEGA= 1845C

IGP1=2.2e-06 Torr


Thursday, November 28, 2019, 16:37

IGP1= 1.9e-06 Torr

OMEGA = 1850C (1.08 slope)

TGHT = 692A, 10.5V  TBHT= 233A, 3.2V

 

Initiating pressure ramp at -2A/min on TGHT and -1A/min on TBHT


Thursday, November 28, 2019, 16:45

IGP1= 1.28e-06 Torr

OMEGA= 1770 C (1.08 slope)

TGHT = 650A, 9.8V

ramp TGHT at -3.5A/min maintain TBHT at -1A/m in


 Thursday, November 28, 2019, 17:11

IGP1= 1.14e-06 Torr

OMEGA = 1730 C (1.08 slope)

ramp TGHT at -5A/min maintain TBHT at -1A/m


Thursday, November 28, 2019, 17:20

IGP1- 8.9e-07 Torr

OMEGA=1636C

ramp TGHT at -6A/min maintain TBHT at -1A/min


 Thursday, November 28, 2019, 17:34

IGP1= 7e-07 Torr

OMEGA= 1500 C (1.08 slope)

ramp TGHT at -8A/min maintain TBHT at -1A/min

TBHT = 183A


 OMEGA 1180C

TGHT =300 A

TBHT = 155A

Initiated -15A/min TGHT and -4A/min TBHT

IGP1= 5.2e-07 Torr


OMEGA below 1000C

begin manual tapdown


Thursday, November 28, 2019, 19:42

Target was dismounted after cooling.  Two graphite discs and end caps inserted.

 

Attachment 1: HPFIBIAD20191124-SinteringTaC.PNG
HPFIBIAD20191124-SinteringTaC.PNG
  472   Tuesday, November 26, 2019, 15:43 Anders MjosSiC42464-3HP-FEBIADProblems resolvedWater to vacuum leak on heat shield line

This morning, the vacuum responded to shutting of the water of the heat shield circuit (leak rate without pumping leveling out). The vacuum chamber was vented and the heat shield with flexible lines was replaced with another heat shield with fixed lines. The chamber was again pumped down and water opened at ~150 mTorr to test the leak up rate without pumping. No leaks apparent, so continued pumping down with turbo pump. At a vacuum of about 1E-6 Torr the water was again supplied to the heat shield circuit and an increase in vacuum could be observed. Stopped the turbo pump and prepared to vent. Two new heat shield lines were brazed in the machine shop and fitted by Maico after lunch. During this time one of the old lines (from heat shield to feedthrough in box) was leak tested and a leak found at a location just above the VCR. The line had been twisted and due to the twist developed a leak. With the two lines replaced, the vacuum was pumped down again and water could be supplied without any increase in vacuum pressure at 1E-6 Torr. To facilitate the new copper tubing, the restraining bracket for the heat shield VCRs was not mounted. It will have to be fitted later. Until then, please contact Anders for help in removing the heat shield to prevent any damage to the new lines.

  473   Wednesday, November 27, 2019, 17:45 John WongSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)

Darwin Ortiz Rosales wrote:

Tuesday, November 26, 2019, 14:53

Total number of foils: 504

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at either end.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature= 1900 C (Correction = 1800 C, NOT 1900 - JW), Omega Slope set = 0.990 (use 1.08, check temp, JW), manually and automatically ramp to 700A (check temp to see if it's matching with the 1.08 slope), TGHT will be tapped up accordingly to reach desired Temp.

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

System experienced some vacuum issues due to cooling water leak in a heatshield line. 

Evaluation discs not included because no space.

Total Green disc mass measured = 58.250 g

 


Tuesday, November 26, 2019, 15:00

IGP1= 7.4e-06 Torr.  No leak issues found after last fix (Anders will add details).


Tuesday, November 26, 2019, 15:33

TGHT= 52.7A, .22V   TBHT= 49.3A, .52V

IGP1= 7.202 e-06 Torr (trending up so will allow to stabilize).

 

 Wednesday, November 27, 2019, 17:44

I'll take over from here to step up the target heater, and I'll coordinate it with Darwin. 


 Wednesday, November 27, 2019, 20:36

Note: Sintering temp should be at 1800 C, NOT 1900.  Use Omega slope 1.08 and check temperature.  Correction made on elog #471.

Continue to step up TGHT and TBHT, keeping vacuum below 1.5 e-5 Torr. 


 Thursday, November 28, 2019, 03:06

TGHT reached to 400A/5.29V, TBHT at 230A/3.13V. 

Vacuum coming down from 1.3 e-5 Torr.

OMEGA = 1105 C (slope at 0.99).

Instructions for Darwin:

1.  Confirm temperature - check the temp plot from the TaC coating step. 

2.  Change OMEGA slop to 1.08 - check to see if this matches the temp plot.  If not, bring it back to 0.99.

3.  Continue to step up TGHT, check temp at 1400C (change slop 1.08 and check), 1500 C, 1600 C (check windows for coating - if any coating, then OMEGA is no longer useful hereon)

4.  Use the temp plot and continue to tap up TGHT to reach 1800 C and hold it for at least 4 hours or until the vacuum goes below 1 e-6 Torr then proceed with cooling down.

5.  Use the auto cooling program for TGHT (-2A/min) and TBHT (-1A/min)

Note:  For ramping up TGHT, keep vacuum below 1.5 e-4 Torr and keep tapping up to reach 1800 C.  Above 1100 C, this should be a quick step to get to 1800 C; should take < 2 hrs to get there.  

See the striptool or the attachment below to see how I did it. 

Once the chamber is cool down, take out a few samples for SEM analysis. 

Good luck!


 

Attachment 1: SiC_42464-3_RUSH_400A.JPG
SiC_42464-3_RUSH_400A.JPG
  477   Friday, March 13, 2020, 14:21 Darwin Ortiz RosalesSiC42218-8 HP-SISDone Conditioning of SiC discs (sintering) (RUSH)

Friday, March 13, 2020, 13:52

Total number of foils: 493

Total length packed 17.4 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 50A at 1A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800 (C using slope 1.08 at after 1700C manually and automatically ramp to 700A then  TGHT will be tapped up accordingly to reach desired Temp).

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Evaluation discs not included because no space.

Total Green disc mass measured = 58.78 g


Friday, March 13, 2020, 14:22

Container loaded and pressuring down started without any pump issues.


Friday, March 13, 2020, 23:26

IGP1= 9.1e-07 Torr

Start auto tap at .25A/min to 50A on both TBHT and TGHT


Saturday, March 14, 2020, 07:09

IGP1=6.9e-6 Torr

TGHT = 49.1 A, 0.58V

TBHT = 49.2A, .49V

Continue ramp to 80 A on both heaters at .0.25A/min (good vacuum 3.0 e-04 Torr, bad vaccum 5.0 e-04 Torr


Saturday, March 14, 2020, 08:22

IGP1=6.8 e-05 Torr

Pressure spike TGHT =63.7 A, 0.77 V; TBHT = 60.0 A , 0.62 V

Aborted ramp alow to stabilize (Tapped TBHT to 63.8 A


Saturday, March 14, 2020, 12:16

IGP1= 8.1e-05 Torr

start autoramp at 0.25A/min


Saturday, March 14, 2020, 17:47

IGP1= 2.9e-05 Torr

TGHT= 78.4A, 1.0 V

TBHT = 79.4A, .88 V

manual and automatic  tap up to 740A TGHT and 230A TBHT then tap manually to 1800 C (mostly at .075 A/min and increasing to 1A /min as pressure stabilizes)


Sunday, March 15, 2020, 22:40

OMEGA = 1711 C

TGHT = 784,6 A, 12.9V (readback)

TBHT = 232 A, 3.5 V

Tap TGHT to 800 A readback set to 815A


Sunday, March 15, 2020, 23:20

OMEGA =1801 C

TGHT = 799.2 A, 13.3 V, TBHT = 232.9, 3.6V

Start gradual tap-down as temperature rising (1810 C at end of this note)


Sunday, March 15, 2020, 23:49

OMEGAA = 1818 C

TGHT = 769.9A, 12.6 V; TBHT = 232.9 A, 3.6 V

Temperature dropping tapped back up to 799 A on TGHT read back (set to 815 A)


Monday, March 16, 2020, 04:10

OMEGA = 1395 C (not reliable)

TGHT = 799.2 A, 13.2 V

TBHT = 232.9 A, 3.6 V

IGP1 = 2.2 e-06 Torr

Initiate cooling at -1.5 A/min on TGHT to 600A (at 600 A increase cooling rate to 3 A/min ; at 300 A increase cooling to 4 A/min and start TBHT cooling at 1 A/min; at `200 A on TGHT increase cooling to 4 A/min and TBHT 2 A/min)


Monday, March 16, 2020, 09:43

TGHT = 0 A , 0.02V

TBHT = 53,2 A, .56 V  (increase cooling to 4 A/min)

IGP1= 1.12e-07 Torr


Monday, March 16, 2020, 10:37

IGP1= 9.5 e -8 Torr

TGHT and TBHT = 0A, 0V

Will unload container


Monday, March 16, 2020, 12:40

Ten discs removed for evaluation (6 from left side and 4 from right side)

two graphite discs placed at each end as well as two TaC coated and sintered end-caps

total length after sintering = 17.8 cm

 

 

 

  490   Thursday, July 16, 2020, 11:15 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 1 of 2

 Thursday, July 16, 2020, 11:15

Coated Ta tube cotaining 233 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

Evap 2 was pumped down


 Friday, July 17, 2020, 08:49

Total length packed approximately 10 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two TaC coated Ta wire springs inserted at both ends.

Initially to ramp TGHT and TBHT to 40 A at 0.5 A/min

Then heat ramping TGHT manually and automatically  to reach 400 A  (Omega slope set = 0.990)

Then ramp to temperature = 1800 C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Initial IGP1 = 6.45e-07 Torr

 


 

Friday, July 17, 2020, 20:49

TBHT = 38.9 A, 0.47 V

TGHT = 39.7 A, 0.59 V

IGP1 = 9.1e-06 Torr

Autoramp to 50 A at 0.5 A/min for both TGHT and TBHT


 Saturday, July 18, 2020, 09:04

IGP1 = 1.6e-06 Torr

TGHT = 50.5 A, 0.76V

TBHT = 49.7 A, 0.62 V

Starting autoramp at 0.5 A/ min to 400 A TGHT and 230 A TBHT


Saturday, July 18, 2020, 10:17

IGP1 = 5.06e-05 torr

stopped autoramp and allow pressure to decrease and stabilize


Saturday, July 18, 2020, 10:47 

IGP1 = 6.65 e-06 Torr and trending down

TGHT = 55.4 A, 0.83 V

TBHT= 54.6 A, 0.68 V

Change autoramp to 0.25 A/min for both heaters (.05 increments and 120s wait) 


Sunday, July 19, 2020, 08:46 

 IGP1= 2.2 e-05 Torr

TBHT = 109.5 A, 1.6 V

TGHT = 106.6 A, 1.7 V

increased ramping rate to .5A/min by decreasing wait intervals to 60 s


Sunday, July 19, 2020, 14:55 

IGP1 = 7.1 e -06 Torr

TGHT = 271.8 A, 4.7 V

TBHT = 233.1 A, 4.1 V

Increasing ramping rate to 1 A/min 


 Sunday, July 19, 2020, 17:35

IGP1 = 2.6e-06 Torr

TGHT = 400 A, 7.2 V

TBHT = 233 A, 4.1 V

Tap manually  to 410 (expected 1800 C )

Note*  OMEGA reading cannot be obtained.  

Leave at 410 A on TGHT for 4 hours.


Sunday, July 19, 2020, 22:57

IGP1 = 7.0 e-07 Torr

TGHT= 410 A , 7.2 V

TBHT = 233 A, 4.2 V

Start cool down at -2A/min for TGHT and -1A/min for TBHT

 


 Monday, July 20, 2020, 12:20

IGP1 = 2.2e-07 Torr

Unloading target

  491   Monday, July 20, 2020, 19:25 Darwin Ortiz RosalesSiC44139-11LP-SISDoneSiC sintering for Luca 2 of 2

Monday, July 20, 2020, 19:27 

Coated Ta tube cotaining 355 SiC disks wrapped with Ta heat-shields (3 layers)

Desired temperature= 1800C (expected TGHT 410 A), TBHT will be set fixed at 230A (max).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap 2 was left to pump down over night.


 Monday, July 20, 2020, 23:06

IPG1 = 3.1e-06 Torr

Start autoramp at .25A/min to 40A for both TGHT and TBHT


Tuesday, July 21, 2020, 08:06

TGHT = 40.3 A, 0.51 V

TBHT = 39.0 A, 0.46 V

increase auto ramp limit to 50 A for both TGHT and TBHT 

IGP1=1.8e-05 Torr

 


Tuesday, July 21, 2020, 16:22

IGP1= 1.5 e-05 Torr 

TGHT = 50.1 A, 0.65 V

TBHT = 50.0 A, 0.60 V

 Change ramp target to 350 A for TGHT and 230A for TBHT


Wednesday, July 22, 2020, 13:24

Stopped autoramp.  Will allow pressure to drop. 

TGHT = 64.0 A, 0.86 V

TBHT = 64.5 A, 0.82 V 

 

Thursday, July 23, 2020, 23:55

TGHT Reached 430 A,  7.7 V

OMEGA reads 1310 C but reading is not considered accurate so will leave at this current for 4 hours.


Friday, July 24, 2020, 11:31

IGP1 = 1.98e-07 Torr

Window for pyrometer was coated with condensate.  

Dismounted target and cleaned two windows in line with the pyrometer.

 

 

 

  526   Monday, February 01, 2021, 13:57 Darwin Ortiz RosalesSiC40282-4TARGET BOATDoneSintering of SiC discs for SEM

Monday, February 01, 2021, 13:52  

Ta boat loaded with 20 Disc on either end capped with Ta springs to prevent overexpansion.   discs wrapped Graphite foil and boat wrapped in Ta heat-shields (3 layers).

Sample A on left side and sample B on right side.

Desired temperature= 1800C (expected TGHT 410 A).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap2 left to pump down over night.


 Tuesday, February 02, 2021, 10:01

Pressure stable at IGP1= 7.8e-7 Torr

TGHT autoramp  set to 50 A @ 1/min


Tuesday, February 02, 2021, 13:45

IGP1=3.5e-6 Torr

TGHT =49.9 A, 0.56 V

Ramp at 1A/min to 100A


Wednesday, February 03, 2021, 08:25

IGP1= 5.5 e-07 Torr

TGHT = 100 A, , 1.2 V

Yesterday the camera failed to operate.  Cloud service discontinued.  The TS camera is offline but it is a different provider.  Will start ramping to 400A .

Ramp rate 2A/min


Wednesday, February 03, 2021, 15:55

ramped up to 520 A and 9.1V TGHT

Temperature average 1644 C but suspect actual temperature higher.

Held for 5 hours and started ramp down at -2A/min


Thursday, February 04, 2021, 9:35

IGP1= 2.99e-7 Torr

Begin pumpdown procedure and remove container

Note:  SiC evaporation on most discs.  The temperature was too high.  Need to repeat.

 

 

 

  529   Saturday, February 13, 2021, 08:14 Darwin Ortiz RosalesSiC41992-1TARGET BOATDone Sintering of SiC discs for SEM

Saturday, February 13, 2021, 08:10

Ta boat loaded with 80 discs enclosed in graphite foil in pockets of 20.  Sample A at both ends and sample B in the middle spaced out. Boat wrapped in Ta heat-shields (3 layers).

(A B B A)

Desired temperature= 1800C (expected TGHT approx 410 A).

good vacuum = 3.00 e-05 Torr

bad vacuum = 5.00 e-05 Torr

Evap2 left to pump down over previous night.

IGP1= 5.4e-7 Torr and stable

Initiating TGHT ramp up at 1 A/ min to 30 A


Saturday, February 13, 2021, 12:19

IGP1= 6.9e-06 Torr

Ramp to 50 A 1A/min


Saturday, February 13, 2021, 14:35

IGP1 = 6.4e-6 Torr

Pressure trending down. 


Saturday, February 13, 2021, 14:56

IGP1= 4.9 e-6 Torr

Initiate Ramp up @ 1 A/min to 400 A

Changed ramp up to 0.5 A/min at around 11:30 pm


Sunday, February 14, 2021, 11:43

The current will be ramped up to 420 A according to the trendline approximation (see attachement 1)


Sunday, February 14, 2021, 12:26

IGP1 = 8.9 e-06 Torr and trending down

TGHT = 420 A, 7.5 V

OMEGA = 1730 C

Will ramp up to 428 A manually 


Sunday, February 14, 2021, 12:30

Reached 428 A on TGHT.  

OMEGA = 1760 C

Will bump to 430 A and hold for 4 hours

OMEGA= 1765 C


Sunday, February 14, 2021, 18:00

OMEGA = 1789 C

IGP1= 7.5 e -7 Torr

TGHT = 430.5 A , 7.8 V

Start ramping down at -1A/min to zero A

 

 

 

 

 

 

Attachment 1: Screenshot_2021-02-14_114713.png
Screenshot_2021-02-14_114713.png
  549   Wednesday, April 28, 2021, 11:57 Darwin Ortiz RosalesSiC42218-7HP-SISDonesintering discs for SiC#41 (or back-up for #40)

Wednesday, April 28, 2021, 11:54

Total number of foils: 449 (not including analysis discs)

Total length packed 16.7 cm

5 extra analysis discs and 2 dr. Blade discs

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

One Ta disc inserted at front end

Initially to ramp TGHT and TBHT to 50A at0.5 A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 530A A (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

 


Thursday, April 29, 2021, 10:09

IGP1 = 6.5 e-07 Torr

Start heating at 0.5 A/min to 50 A on both TGHT and TBHT 


Thursday, April 29, 2021, 21:45

 IGP1= 7.7 e-06 

TGHT = 50.3A , 0.59 V

TBHT = 49.4 A, 0.56 V

Pressure is taking a while to equilibrate.  Will wait a bit more to continue heating

 


Thursday, April 29, 2021, 23:49

IGP1 = 7.2 e-06 Torr

will start ramping at 0.5 A/min to 100 A 


Saturday, May 01, 2021, 20:09 


Friday, April 30, 2021, 08:19

IGP1 pressure higher than bad vacuum.  Stopped autoramp.  Will allow vacuum to come back down and restart ramp. 


Saturday, May 01, 2021, 09:04

Yesterday the system had tripped.  All pumps had turned off and the pressure was found at 0.005 torr

vacuum was restarted.

 Current IGP1= 6.5e-07 Torr

Restarting heaters.  

Autoramp at 0.5A/min to 20A on both TGHT and TBHT


Saturday, May 01, 2021, 10:48

IGP1=5.9e-7 Torr

TGHT = 20.0 A, 0.24V

TBHT = 20A, 0.20V 

 Autoramp at 0.5A/min to 40A both TGHT and TBHT


Saturday, May 01, 2021, 13:26 

TGHT = 40.0 A, 0.47 V

TBHT= 39A, 0.44V

IGP1= 5.5 e-07 Torr

Autoramp at 0.5A/min to 60 A on both TGHT and TBHT


Saturday, May 01, 2021, 20:09

TGHT = 60.0 A, 0.72V

TBHT = 59.4 A, 0.69V

IGP1= 4.4e-07 Torr

Autoramp at 0.5A/min to 100 A on both TGHT and TBHT

 


Sunday, May 02, 2021, 18:30 

IGP1= 1.7 e-06 Torr

TGHT =100A, 1.3V

TBHT = 99.9A, 1.3V

Autoramp both heaters at 0.25A/min to 120A and monitor 


Sunday, May 02, 2021, 18:45

pressure increase to 4.1e-06 Torr.  TBHT unexpectedly rose to 120A and was manually tapped back down to 104 A.  Will keep both , TGHT and TBHT, at 104 A  for a while. 


Sunday, May 02, 2021, 19:50

Stepping at 0.5A/min to 105A then to 110 A on both TGHT and TBHT


Sunday, May 02, 2021, 22:10 

Will leave both TGHT and TBHT at 110 A until pressure comes back down

currently IGP1= 1.3e-05 Torr


Monday, May 03, 2021, 09:35 

IGP1= 2.2 e-06 Torr

Tapping TGHT and TBHT to 115A 


Monday, May 03, 2021, 11:30

 Tapping TGHT and TBHT to 120A @ 1A/min


Monday, May 03, 2021, 18:38

IGP1= 5.4e-06 Torr

TGHT = 130.3 A, 1.8 V

TBHT = 129.1 A, 1.8 V

Continue gradual ramping at 1A/min in increments of 5 A 


Tuesday, May 04, 2021, 09:27

IGP1= 3.2e-5 Torr

TGHT = 400 A, 6.0V

TBHT = 232 A, 3.6V

OMEGA = 1104 C

waiting for pressure to drop then will continue heating 


Tuesday, May 04, 2021, 17:27

TGHT = 420.1 A, 6.5V

TBHT= 232A, 3.6V

OMEGA = 1139 C

IGP1= 1.15e-5 Torr 

will increase ramp up at 0.5A/min to 430A and hold (TGHT)


Tuesday, May 04, 2021, 22:43

TGHT= 430A, 6.6V

TBHT = 232.8A, 3.6V

OMEGA= 1157 C

IGP1=6.6e-6 Torr

 Set Autoramp at 0.5A/min to 540 A (TGHT)


Wednesday, May 05, 2021, 08:09

IGP1= 7.5e-06 Torr

TGHT = 534 A, 8.5V

TBHT=232 A, 3.7 V 

OMEGA = 1485

Continue ramp at 0.5A/min to to 600 A on TGHT

 


Wednesday, May 05, 2021, 15:07

IGP1=1.2e-5 Torr

TGHT=601A, 9.6V

TBHT= 232A, 3.7V

OMEGA =1600 C

ramp to 650A on TGHT at 0.5A/min 


Wednesday, May 05, 2021, 20:05

Tapped TGHT to 694A, 11.4 V (manually)

TBHT= 232A, 3.7V

OMEGA =  1790 C

IGP1= 2.5e-05 Torr

Will monitor Pressure and temperature .  Will start 4 hour count.


Wednesday, May 05, 2021, 22:03

OMEGA = 1765 C 

TGHT = 694A, 11.5V

TBHT = 232A, 3.8 V

IPG1= 1.6e-05 Torr

Manually bumping TGHT to 700 A

 

  553   Thursday, August 05, 2021, 11:18 Darwin Ortiz RosalesSiC44691-2LP-SISDoneDr blade and non-Dr blade Material Experiment (sintering)

Thursday, August 05, 2021, 11:10

Total number of foils: 380

Total length packed 13.5 cm

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Two Ta discs at either end and three graphite discs as separators 

[Left end [ blade--no blade--blade---no blade]  Right end ]

Initially to ramp TGHT and TBHT to 50A at0.5 A/min

Then heat manually to OMEGA ~1400 C , ramping TGHT manually and automatically  to reach 430A A (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -5 Torr

Bad vac at 5.00 e-5 Torr

Total weight into Evap2 =503.8 g

 


Friday, August 06, 2021, 11:33

IGP1= 8.3e-07 Torr

Start heating at 0.5 A/min on both TGHT and TBHT up to 50A


Friday, August 06, 2021, 22:34

 IGP1= 7.0e-06 Torr

TGHT= 50.1 A, 0.6 V    TBHT = 50.0A, 0.6V

Continue heating at 0.5A/min to 400A on TGHT and 230A on TBHT


Saturday, August 07, 2021, 10:11

Stopped autoramping.  Will allow some time at 63 A on both TGHT and TBHT


Saturday, August 07, 2021, 12:19

IGP1= 1.9e-05 Torr

Manually increase TGHT and TBHT to 65 A 


Saturday, August 07, 2021, 23:01

IGP1= 5.8e-06 Torr

TGHT= 64.5 A, 08V  TBHT=64.6A, 0.8V

Ramp up manually while monitoring pressure 


Sunday, August 08, 2021, 08:46

IGP1= 6.0e-06 Torr

TGHT = 69A, 0.85V  TBHT = 69A, 0.90V

ramp up manually  


Monday, August 09, 2021, 08:54 

IGP1= 1.38e-05 Torr

TGHT= 90.0 A, 1.1V, TBHT= 90.0A 1.3V

Start autoramp at 0.5 A/min on both TGHT and TBHT to 400A and 230A respectively.

Changed bad vacuum to 5e-04 Torr

 


Monday, August 09, 2021, 21:37

IGP1= 6.6e-06 Torr

TGHT= 300.3 A, 5.0 V, TBHT = 233.0 A, 4.1V

 Increase ramp rate to 2A/min for TGHT to 400 A,

OMEGA = 1430 C


Monday, August 09, 2021, 22:09

Will autoramp at 2A/min up to 424A as per regression line on attached file 


Monday, August 09, 2021, 22:58

Temperature drop on OMEGA.  Unexpected.  Will lower current on TGHT to 418A and keep there for 4 hours.  OMEGA may not be reliable 


Tuesday, August 10, 2021, 3:16

IGP1=8.8e-07 Torr

TGHT = 414A, 7.5V TBHT = 233A, 4.1V

ramp down at -2A/min for TGHT and -1A/min for TBHT


Tuesday, August 10, 2021, 10:35

IGP1= 3.6e-07 Torr

Dismount

Some discs, especially end sections were coated with a golden layer.  

Attachment 1: image_2021-08-09_221014.png
image_2021-08-09_221014.png
  567   Thursday, February 10, 2022, 08:58 Darwin Ortiz RosalesSiC HP-FEBIADDone 

Thursday, February 10, 2022, 08:52 

Total number of foils: 528 ( including 10 analysis discs)

Weight without springs = 1521.9 g (includes heatshields and T bar)

Total length packed 18.1 cm (including 10 analysis discs that will be removed)

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Ta coated spring at  ends

Initially to ramp TGHT and TBHT to 50A at0.5 A/min

Then heat automatically heat to OMEGA ~1400 C , then continue to max 530A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1= 1.0 e-06 Torr at start of initial ramp


IGP1 = 5.7 e-06 Torr

TGHT = 50.0 A, 0.6 V

TBHT = 50.0A, 0.5 V

continue to ramp up at 0.5A/min to 200A


Friday, February 11, 2022, 07:59 

IGP1=3.0e-07 Torr and stable

TGHT= 201A, 2.8V

TBHT = 201A, 2.6V

continue autoramp at 1A/min to 230A on TBHT and 450A on TGHT


Friday, February 11, 2022, 12:41

IGP1= 6.6e-05 Torr

TGHT= 450A, 6.5V

TBHT= 232A, 3.1V

OMEGA = 1258C

Allowing pressure to drop.  Will continue ramp up when [pressure around 9-e-6 Torr


Friday, February 11, 2022, 13:59

IGP1= 2.4e-05 Torr

Will ramp up at 1A/min to 550A on TGHT


Friday, February 11, 2022, 15:54  

IGP1= 2.4e-05 Torr

TGHT= 551.0A, 8.3V

TBHT=232A, 3.2V

OMEGA= 1426 C

ramp to 600 A @ 2A/min


Friday, February 11, 2022, 16:23

TGHT= 600.1A, 9.3V

TBHT= 232A, 3.2V

OMEGA = 1612C

ramp to 689 @2A/min to 1800 C as projected in regression plot attached 


Friday, February 11, 2022, 21:20 

Evap has been at 1800 +/- 20 C for 4 hours and 10 minutes

OMEGA 1802 C

TGHT = 689 A, 11.0V

TBHT=232.8 A, 3.26V

IGP1= 1.3e-05 Torr and stabilizing.  

will start cool down at -2A/min TGHT and -1A/min TBHT

 

 

  576   Wednesday, May 18, 2022, 09:59 Darwin Ortiz RosalesSiC44692-9HP-FEBIADDoneT-220516 Sintering SiC

 Wednesday, May 18, 2022, 09:46

Total number of foils: 415 ( including 10 analysis discs on the right side of the container)

Total weight = 1580 g (includes heatshields and T bar)

Total length packed 17 cm (including 10 analysis discs that will be removed)

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Ta coated spring at  front (right) side

Initially to ramp TGHT and TBHT to 30A at 3 A/min

then continue to and slow down ramp when pressure begins to increase

max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1= 7.1 e-07 Torr at start of initial ramp.  Note, first real operation with new noisy Turbo Pump.


Wednesday, May 18, 2022, 10:18

Pressure increase observed starting around 60A.  Ramped to 70 A and will leave until pressure stabilizes

After about 30 minutes pressure dropped so ramped up to 90 A @1A/min on both TGHT and TBHT


Wednesday, May 18, 2022, 11:37

pressure spike around 90A.  will leave until pressure stabilizes 


Wednesday, May 18, 2022, 12:54  

start autoramp to 100A at 1A/min.  IGP1= 1.4e-4 Torr


Wednesday, May 18, 2022, 13:15

autoramp to 150A @1A/min 


Wednesday, May 18, 2022, 13:41

 At 110A another spike in pressure.  System waiting for good vacuum


Wednesday, May 18, 2022, 15:24

ramped to 150A on both TGHT and TBHT.  Ramping to 200 A at @A/min for both TGHT and TBHT

currently IGP1=  2.0e-4 Torr


Wednesday, May 18, 2022, 15:33  

Pressure still trending down; therefore will start ramp at 4A/min to 400 amp on TGHT and 230A to TBHT


Wednesday, May 18, 2022, 16:22 

Increasing ramp to 4A/min on TGHT


Wednesday, May 18, 2022, 17:26 

switched to 6A/min in 1A/10s increments on TGHT


Wednesday, May 18, 2022, 17:43 

Set final current to 730 A as per regression attached.

 

 

 

 

 

 

 


Wednesday, May 18, 2022, 17:54

Final current on TGHT = 740A, 11.9 V

OMEGA = 1775 C

TBHT = 230A, 

Will leave for 4 hours

 


Wednesday, May 18, 2022, 19:56

Temperature dropped so increased current to 755A for the remaining of the time.


Friday, May 20, 2022, 08:58

Final notes:  The difference between initial and final mass was 6 g as expected.  Slight coating on window of evaporator may explain apparent temperature drop.  Next time will keep current at projected setting.  The material looks good with slight overheating on the outer discs of left side.

 

 

  578   Tuesday, June 07, 2022, 07:31 Darwin Ortiz RosalesSiC42464-2HP-FEBIADDoneT-220524 Sintering SiC

Tuesday, June 07, 2022, 07:19

Total number of foils: 403 ( including 5 analysis discs on the right side of the container)

Total weight = 1535.3 g (includes heatshields, spring and T bar)

Total length packed 16.4 cm (excluding 5 analysis discs that will be removed)

container has 3 Ta heat shields.

No endcaps inserted to facilitate out-gassing

Ta coated spring at  front (right) side

Initially to ramp TGHT and TBHT to 50A at 3 A/min

then continue to 80A and slow down ramp when pressure begins to increase

max approx 700A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1= 7.6 e-07 Torr at start of initial ramp.


 Tuesday, June 07, 2022, 11:14

Ramping to 150A on TGHT and TBHT at 1A/min


Ramped TGHT and TBHT to 230A at 2A/min

Tuesday, June 07, 2022, 13:12

Ramping TGHT to 600A at 4A/min

TBHT at 230A, 3.0V


Tuesday, June 07, 2022, 16:41

TGHT= 740 A, 12.1V

TBHT= 232A, 3.0 V

OMEGA reading 1616C but questionable.  Will leave for 4 hours at 740A top TGHT.


Wednesday, June 08, 2022, 22:15

Early Wednesday morning the left TGHT bolt was found damaged.  The target leg was coated with bolt material rendering the Target inoperable.   

The Heatshield assembly was swapped and surfaces cleaned.  A "dummy" FEBIAD was installed to test if the system can withstand high current. 

The system was pumped down and ramped to 740A on TGHT at 4A/min.  It was then left at that current for 4 to 5 hours.

Currently starting rampdown at -2A/min to 0A. 

Photos of the incident attached in *eLog 580*.  IGP1= 5.7e-06 Torr

TGHT= 742A, 11.4V

  584   Tuesday, June 21, 2022, 09:48 Darwin Ortiz RosalesSiC37978-1HP-FEBIADDoneT-220617 sintering

Tuesday, June 21, 2022, 09:43

Total number of foils: 377 ( including 6 analysis discs on the right side of the container)

Total weight = 1454 g (includes heatshields, spring and T bar)

Total length packed 15.5 cm (excluding 6 analysis discs that will be removed)

container has 3 Ta heat shields and is coated

No endcaps inserted to facilitate out-gassing

Ta coated spring at  front (right) side

Initially to ramp TGHT and TBHT to 80A at 2 A/min

then to 120A and slow down ramp when pressure begins to increase

max approx 675A on TGHT and 230A on TBHT (Omega slope set = 0.990)

Then temperature = 1800C

TBHT will be set fixed at 230 A (max).  TBHT heated manually and automatically to max.

Good vac at 3.00 e -4 Torr

Bad vac at 5.00 e-2 Torr

 IGP1=3.6 e-07 Torr at start of initial ramp.

 


Tuesday, June 21, 2022, 13:54

IGP1= 7.1 e-05 and dropping.  Start ramp to 150A for both TGHT and TBHT @1A/min


Tuesday, June 21, 2022, 21:27

Increased ramp rate to 3A/min for TGHT to 675A


Tuesday, June 21, 2022, 22:38

Ramp up to 685 A on TGHT and leave for 4 hours. 

OMEGA = 1645 C but suspect reading not on Ta surface.


Wednesday, June 22, 2022, 02:28

IGP1=7.7e-6 Torr

OMEGA =1610C

TGHT = 685A, 10.5V

TBHT = 230A, 3V

initiate rampdown at -2A/min and -1Amin TGHT and TBHT