Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 12 of 35  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  472   Tuesday, November 26, 2019, 15:43 Anders MjosSiC42464-3HP-FEBIADProblems resolvedWater to vacuum leak on heat shield lineThis morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum
  
  471   Tuesday, November 26, 2019, 15:21 Darwin Ortiz RosalesSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm
 HPFIBIAD20191124-SinteringTaC.PNG 
  470   Monday, November 25, 2019, 11:35 Aaron Schmidt   In progressFlex - line HS installed Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line
  
  469   Saturday, November 23, 2019, 14:03 Darwin Ortiz RosalesTaC42464-3HP-FEBIADDoneTaC coating/sintering12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped
 HPFIBIAD20191124.PNG 
  468   Friday, November 22, 2019, 18:32 Fernando Maldonado & Marla Cervantes TaC HP-FEBIADIn progressTaC coating/sintering Friday, November 22, 2019, 18:18:
 
 
  
  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping. Thursday, November 21, 2019, 08:09:
PS on. Leak issue resolved (Evap 2 Elog 466).
Vacuum @ 4.10e-07T.
  
  466   Friday, November 15, 2019, 13:26 Aaron SchmidtSiC HP-FEBIADProblems resolvedTemp map testing - 1. (Leak issue) HS 42752-5 - Setup for Temperature
mapping.
Friday, November 15, 2019, 13:26:
 Test_FEBIAD_2019_-_Nov_-_Leak.docxEvap_2_cooling_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_2.jpg 
  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 
Monday, November 04, 2019, 14:19 
Each endcap is separated with
 Nov4CapCoating.PNG 
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sinteringThursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.Tuesday, October 08, 2019, 14:14: Remove
Flex line HS. 
HS: 42752-1
  
  462   Monday, October 07, 2019, 09:18 Darwin Ortiz RosalesTaC TARGET BOATIn progressSintering TaC coating on endcaps and springsFriday, October 04, 2019, 11:37
Each endcap is separated with
  
  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sinteringThursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  460   Friday, September 27, 2019, 18:18 Marla CervantesNb TARGET BOATDoneConditioning NB samples for Edward Wednesday, September 25, 2019, 18:06
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb
 Nb-finalTemp.JPGNb-arrangement.jpg 
  459   Thursday, September 26, 2019, 14:03 Aaron SchmidtNb41882-3TARGET BOATIn progressHS swap & test Nb target HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS
  
  458   Tuesday, September 17, 2019, 13:25 Aaron Schmidt  LP-SISProblems resolvedTurbo pump / roughing troubleshoot.Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23:
  
  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59 Ta#59 LP-SIS  Ta#59_Evap_2_Conditioning..docx 
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning  Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog
 A.JPGB.JPG 
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sinteringFriday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields.
 190906LPSIS_Sintering.PNG 
  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert testWednesday, August 28, 2019, 06:00
A graphite insert (with conical
  
  453   Monday, August 12, 2019, 15:55 John WongZrC43044-6LP-SISDoneSintering ZrC Discs


   
        
            
 ZrC_43044-6_inspection.pdf 
ELOG V2.9.2-2455