ID |
Date |
Author |
Target Material |
Target Oven W.O# |
Source |
Status |
Subject |
Text |
|
|
573
|
Thursday, April 21, 2022, 09:45 |
Darwin Ortiz Rosales | TaC | 42218-2 | LP-IG-LIS | Done | TaC coating | Thursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring |
|
|
373
|
Monday, June 05, 2017, 15:20 |
Laura Lambert | Empty | 42218-15 | LP-SIS | Done | Sintering TaC coating on UCx#21 container | Monday, June 05, 2017, 15:20
Container coated with TaC using |
|
|
372
|
Tuesday, May 30, 2017, 14:40 |
Laura Lambert | Ta | 42218-14 | LP-SIS | Done | Conditioning Ta#52 | Tuesday, May 30, 2017, 14:36
Target consists of 400 discs. |
|
|
402
|
Wednesday, February 28, 2018, 15:18 |
Laura Lambert | Empty | 42218-13 | LP-SIS | Done | Sintering TaC coating on UCx#22 container | Wednesday, February 28, 2018, 15:16
Container coated with TaC using |
|
|
340
|
Thursday, December 01, 2016, 16:08 |
Laura Lambert | Empty | 42218-12 | LP-SIS | Done | sintering TaC coating on UCx#19 container | Thursday, December 01, 2016, 16:06
Container coated with TaC using |
|
|
388
|
Friday, September 15, 2017, 10:56 |
Laura Lambert | Ta | 42218-10 | HP-SIS | Done | Conditioning Ta#54 | Friday, September 15, 2017, 09:44
Target consists of 470 discs. |
|
|
350
|
Tuesday, February 21, 2017, 15:21 |
Laura Lambert | Empty | 42218-1 | LP-IG-LIS | Done | sintering TaC coating on UCx#20 container | Tuesday, February 21, 2017, 15:19
Container coated with TaC using |
|
|
529
|
Saturday, February 13, 2021, 08:14 |
Darwin Ortiz Rosales | SiC | 41992-1 | TARGET BOAT | Done | Sintering of SiC discs for SEM | Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs |
|
|
392
|
Tuesday, November 21, 2017, 13:55 |
Laura Lambert | Empty | 41882-4 | TARGET BOAT | Done | Sintering TaC coating on fully enclosed target boat for graphite test | Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing |
|
|
393
|
Thursday, November 23, 2017, 15:10 |
Laura Lambert | | 41882-4 | TARGET BOAT | Done | Graphite insert test | Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat. |
6x |
|
459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
|
522
|
Wednesday, November 04, 2020, 17:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | Parasitic target graphite outgassing. | 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on. |
|
|
523
|
Thursday, November 05, 2020, 15:13 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | cleaning treatment. | 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on. |
|
|
545
|
Sunday, April 04, 2021, 16:09 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | Done | parasitic target commissioning | 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking |
|
|
585
|
Tuesday, June 28, 2022, 09:31 |
Ferran Boix Pamies | Empty | 41882-2 | TARGET BOAT | In progress | TC test on Ta tube | Tuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night. |
|
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
|
493
|
Friday, July 31, 2020, 11:16 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Thermocouple measurent of boat temperature | Boat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020 |
|
|
495
|
Wednesday, August 05, 2020, 19:14 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | Done | Parasitic target cooling test | 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr. |
|
|
496
|
Tuesday, August 11, 2020, 10:17 |
Ferran Boix Pamies | Empty | 41882-1 | TARGET BOAT | In progress | Contamination foils temperature test | The target was prepared and put under vacuum
on 2020-08-10
|
|