Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 11 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O#down Source Status Subject Text Attachments
  573   Thursday, April 21, 2022, 09:45 Darwin Ortiz RosalesTaC42218-2LP-IG-LISDoneTaC coatingThursday, April 21, 2022, 09:43
TaC coated Target container was placed
in Evaporator 2 yesterday and left pressuring
  
  373   Monday, June 05, 2017, 15:20 Laura LambertEmpty42218-15LP-SISDoneSintering TaC coating on UCx#21 container Monday, June 05, 2017, 15:20
Container coated with TaC using
  
  372   Tuesday, May 30, 2017, 14:40 Laura LambertTa42218-14LP-SISDoneConditioning Ta#52 Tuesday, May 30, 2017, 14:36
Target consists of 400 discs.
  
  402   Wednesday, February 28, 2018, 15:18 Laura LambertEmpty42218-13LP-SISDoneSintering TaC coating on UCx#22 container Wednesday, February 28, 2018, 15:16
Container coated with TaC using
  
  340   Thursday, December 01, 2016, 16:08 Laura LambertEmpty42218-12LP-SISDonesintering TaC coating on UCx#19 container Thursday, December 01, 2016, 16:06
Container coated with TaC using
  
  388   Friday, September 15, 2017, 10:56 Laura LambertTa42218-10HP-SISDoneConditioning Ta#54 Friday, September 15, 2017, 09:44
Target consists of 470 discs.
 Capture.JPG 
  350   Tuesday, February 21, 2017, 15:21 Laura LambertEmpty42218-1LP-IG-LISDonesintering TaC coating on UCx#20 containerTuesday, February 21, 2017, 15:19
Container coated with TaC using
 IMG_1562.JPGIMG_1564.JPG 
  529   Saturday, February 13, 2021, 08:14 Darwin Ortiz RosalesSiC41992-1TARGET BOATDone Sintering of SiC discs for SEM Saturday, February 13, 2021, 08:10
Ta boat loaded with 80 discs
 Screenshot_2021-02-14_114713.png 
  392   Tuesday, November 21, 2017, 13:55 Laura LambertEmpty41882-4TARGET BOATDoneSintering TaC coating on fully enclosed target boat for graphite test Tuesday, November 21, 2017, 12:01
Boat coated with TaC using 'flushing
  
  393   Thursday, November 23, 2017, 15:10 Laura Lambert 41882-4TARGET BOATDoneGraphite insert test Thursday, November 23, 2017, 14:54
Graphite insert loaded into previously
TaC coated target boat.
 6x 
  459   Thursday, September 26, 2019, 14:03 Aaron SchmidtNb41882-3TARGET BOATIn progressHS swap & test Nb target HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS
  
  522   Wednesday, November 04, 2020, 17:31 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneParasitic target graphite outgassing. 2020-11-04 17:31: target installed
with boat containing graphite container for
outgassing. Roughing pump on.
  
  523   Thursday, November 05, 2020, 15:13 Ferran Boix PamiesEmpty41882-2TARGET BOATDonecleaning treatment. 2020-11-05 15:44 empty and naked
boat in for heating up system and clean up.
Turbo on.
  
  545   Sunday, April 04, 2021, 16:09 Ferran Boix PamiesEmpty41882-2TARGET BOATDoneparasitic target commissioning 2021-04-04 16:07 New container is
in with heatshields, vacuum 8.6E-6 torr.
leak check done. ramping up current, checking
  
  585   Tuesday, June 28, 2022, 09:31 Ferran Boix PamiesEmpty41882-2TARGET BOATIn progressTC test on Ta tubeTuesday, June 27, 2022, early afternoon:
We assembled the setup in evap2 and started
the pumps leaving it running over night.
  
  480   Monday, March 23, 2020, 07:50 Marla Cervantes 41882-1TARGET BOATDoneConditioning graphite target #1 (T2)Friday, March 20, 2020, 19:39
The target material is loaded
  
  482   Wednesday, May 20, 2020, 12:54 Marla Cervantes 41882-1TARGET BOATDoneConditioning graphite target #1 (T2)

    

       
            
 e-log482-fig-1.JPG 
  493   Friday, July 31, 2020, 11:16 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneThermocouple measurent of boat temperatureBoat with attached thermocouple type C
with AREMCO ceramabond glue installed in
evap2 the 30-07-2020
  
  495   Wednesday, August 05, 2020, 19:14 Ferran Boix PamiesEmpty41882-1TARGET BOATDoneParasitic target cooling test 2020-08-05 7.13pm Roughing pump on
2020-08-06 10:48am Turbo was turned
on by Marla in the morning. Vacuum IGP1 4e-6Torr.
  
  496   Tuesday, August 11, 2020, 10:17 Ferran Boix PamiesEmpty41882-1TARGET BOATIn progressContamination foils temperature testThe target was prepared and put under vacuum
on 2020-08-10
 
  
ELOG V2.9.2-2455