489
|
Monday, July 13, 2020, 11:03 |
Aaron Schmidt | | | | | Pump down / leak / vacuum check. | Darwin reported that he was unable
to achieve vacuum of 150mTorr. The flex-line
HS had been removed last week for modifications. |
|
488
|
Monday, June 15, 2020, 14:28 |
Darwin Ortiz Rosales | Empty | 42218-7 | HP-SIS | Done | TaC coating/sintering | Monday, June 15, 2020, 13:30
Container coated with TaC and |
|
487
|
Thursday, June 11, 2020, 13:01 |
Darwin Ortiz Rosales | Empty | 44139-12 | LP-SIS | Done | | Thursday, June 11, 2020, 09:56
Previous day (Wednesday June 10,
2020) |
|
486
|
Monday, June 01, 2020, 12:03 |
Aaron Schmidt | Ta | 44139-13 | LP-SIS | In progress | Ta#60 Conditioning | Ta#60 LP-SIS target
description: |
|
485
|
Friday, May 29, 2020, 10:26 |
Marla Cervantes | Empty | 43044-8 | LP-SIS | Done | TaC coating/sintering | Friday, May 29, 2020, 08:52
Ta tube was coated with TaC |
|
484
|
Wednesday, May 27, 2020, 13:04 |
Marla Cervantes | | 44139-7-SK | | Done | Conditioning graphite target #2 | Wednesday, May 27, 2020, 10:22
IGP1 = 3.2e-7 Torr |
 |
483
|
Sunday, May 24, 2020, 13:39 |
Marla Cervantes | Empty | 44139-11 | LP-SIS | Done | TaC coating/sintering | Sunday, May 24, 2020, 06:54
Ta tube was coated with TaC |
|
482
|
Wednesday, May 20, 2020, 12:54 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) |
|
|
481
|
Wednesday, May 20, 2020, 07:18 |
Aaron Schmidt | | | | | Check Evap 2 | Gradually open waterlines under vacuum
after period of no use.
Wednesday, May 20, 2020, 07:17: Vacuum |
|
480
|
Monday, March 23, 2020, 07:50 |
Marla Cervantes | | 41882-1 | TARGET BOAT | Done | Conditioning graphite target #1 (T2) | Friday, March 20, 2020, 19:39
The target material is loaded |
|
479
|
Wednesday, March 18, 2020, 07:21 |
Marla Cervantes | TaC | 44139-11 | LP-SIS | Done | TaC coating/sintering | Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC |
|
478
|
Monday, March 16, 2020, 13:47 |
Marla Cervantes | | 40282-5 | TARGET BOAT | Done | Conditioning graphite target #1 | Monday, March 16, 2020, 13:47
Target material characteristics:
Graphite cast of 0.965g/cm3, 287 D-shaped |
   |
477
|
Friday, March 13, 2020, 14:21 |
Darwin Ortiz Rosales | SiC | 42218-8 | HP-SIS | Done | Conditioning of SiC discs (sintering) (RUSH) | Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm |
|
476
|
Tuesday, March 10, 2020, 09:34 |
Darwin Ortiz Rosales | Empty | 42218-8 | HP-SIS | Done | TaC coating/sintering | Monday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields. |
|
475
|
Wednesday, March 04, 2020, 14:33 |
Aaron Schmidt | | | | Maintenance | PS swap out | The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: |
|
474
|
Tuesday, December 03, 2019, 08:24 |
Aaron Schmidt | | | LP-FEBIAD | In progress | Temperature mapping. | Tuesday, December 03, 2019, 08:15: Waterlines
opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23: |
  |
473
|
Wednesday, November 27, 2019, 17:45 |
John Wong | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) |
|
|
472
|
Tuesday, November 26, 2019, 15:43 |
Anders Mjos | SiC | 42464-3 | HP-FEBIAD | Problems resolved | Water to vacuum leak on heat shield line | This morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum |
|
471
|
Tuesday, November 26, 2019, 15:21 |
Darwin Ortiz Rosales | SiC | 42464-3 | HP-FEBIAD | Done | Conditioning of SiC discs (sintering) (RUSH) | Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm |
|
470
|
Monday, November 25, 2019, 11:35 |
Aaron Schmidt | | | | In progress | Flex - line HS installed | Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line |
|