ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  479   Wednesday, March 18, 2020, 07:21 Marla CervantesTaC44139-11LP-SISDoneTaC coating/sintering Wednesday, March 18, 2020, 07:10
Ta tube was coated with TaC
 IMG_1538.JPG 
  478   Monday, March 16, 2020, 13:47 Marla Cervantes 40282-5TARGET BOATDoneConditioning graphite target #1 Monday, March 16, 2020, 13:47
Target material characteristics:
Graphite cast of 0.965g/cm3, 287 D-shaped
 CarbonTarget-100A.JPGCurrent_discrepancy.JPGManual_current_incresing.JPGCarbonTarget-Max_current.JPG 
  477   Friday, March 13, 2020, 14:21 Darwin Ortiz RosalesSiC42218-8 HP-SISDone Conditioning of SiC discs (sintering) (RUSH) Friday, March 13, 2020, 13:52
Total number of foils: 493
Total length packed 17.4 cm
  
  476   Tuesday, March 10, 2020, 09:34 Darwin Ortiz RosalesEmpty42218-8HP-SISDoneTaC coating/sinteringMonday, March 9, 2020, 03:15
Container coated with TaC and wrapped
with 3 Ta heat shields.
 SiC#40.PNG 
  475   Wednesday, March 04, 2020, 14:33 Aaron Schmidt   MaintenancePS swap out The TGHT PS was found to be defective.
It was uninstalled w/ Joel S: 
  
  474   Tuesday, December 03, 2019, 08:24 Aaron Schmidt  LP-FEBIADIn progressTemperature mapping.Tuesday, December 03, 2019, 08:15: Waterlines
opened. Vacuum ok @ 4.06e-07T
Tuesday, December 03, 2019, 08:23:
 TGHT_weird_behaviour.PNGIEVAP-WFB1.PNG191205-GHT-trip-1800.PNG 
  473   Wednesday, November 27, 2019, 17:45 John WongSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)


   
        
            
 SiC_42464-3_RUSH_400A.JPG 
  472   Tuesday, November 26, 2019, 15:43 Anders MjosSiC42464-3HP-FEBIADProblems resolvedWater to vacuum leak on heat shield lineThis morning, the vacuum responded to shutting
of the water of the heat shield circuit (leak
rate without pumping leveling out). The vacuum
  
  471   Tuesday, November 26, 2019, 15:21 Darwin Ortiz RosalesSiC42464-3HP-FEBIADDoneConditioning of SiC discs (sintering) (RUSH)Tuesday, November 26, 2019, 14:53
Total number of foils: 504
Total length packed 17.4 cm
 HPFIBIAD20191124-SinteringTaC.PNG 
  470   Monday, November 25, 2019, 11:35 Aaron Schmidt   In progressFlex - line HS installed Leak noted on previous TaC sintering
on HP FEBIAD # 42464-3.
Swapped out gaskets on HS flex line
  
  469   Saturday, November 23, 2019, 14:03 Darwin Ortiz RosalesTaC42464-3HP-FEBIADDoneTaC coating/sintering12.3
Saturday, November 23, 2019, 14:00
Container coated with TaC and wrapped
 HPFIBIAD20191124.PNG 
  468   Friday, November 22, 2019, 18:32 Fernando Maldonado & Marla Cervantes TaC HP-FEBIADIn progressTaC coating/sintering Friday, November 22, 2019, 18:18:
 
 
  
  467   Thursday, November 21, 2019, 08:10 Aaron SchmidtSiC HP-FEBIADIn progressTemperature mapping. Thursday, November 21, 2019, 08:09:
PS on. Leak issue resolved (Evap 2 Elog 466).
Vacuum @ 4.10e-07T.
  
  466   Friday, November 15, 2019, 13:26 Aaron SchmidtSiC HP-FEBIADProblems resolvedTemp map testing - 1. (Leak issue) HS 42752-5 - Setup for Temperature
mapping.
Friday, November 15, 2019, 13:26:
 Test_FEBIAD_2019_-_Nov_-_Leak.docxEvap_2_cooling_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_1.jpgTest_FEBIAD_Left_HS_cooling_line_-_2.jpg 
  465   Monday, November 04, 2019, 14:25 Darwin Ortiz RosalesEndcaps40282-4TARGET BOATDone 
Monday, November 04, 2019, 14:19 
Each endcap is separated with
 Nov4CapCoating.PNG 
  464   Thursday, October 17, 2019, 13:53 Darwin Ortiz RosalesTaC44062-3LP-SISIn progressTaC coating/sinteringThursday, October 17, 2019, 12:00
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  463   Tuesday, October 08, 2019, 14:16 Aaron SchmidtSiC HP-FEBIADIn progressTemp measurements.Tuesday, October 08, 2019, 14:14: Remove
Flex line HS. 
HS: 42752-1
  
  462   Monday, October 07, 2019, 09:18 Darwin Ortiz RosalesTaC TARGET BOATIn progressSintering TaC coating on endcaps and springsFriday, October 04, 2019, 11:37
Each endcap is separated with
  
  461   Thursday, October 03, 2019, 09:26 Darwin Ortiz RosalesTaC44062-6LP-SISDoneTaC coating/sinteringThursday, October 03, 2019, 08:58
Ta tube was coated with TaC and wrapped
with Ta heat-shields (3 layers)
  
  460   Friday, September 27, 2019, 18:18 Marla CervantesNb TARGET BOATDoneConditioning NB samples for Edward Wednesday, September 25, 2019, 18:06
Target boat with a layer of niobium
foil on the bottom is used to heat up Nb
 Nb-finalTemp.JPGNb-arrangement.jpg 