459
|
Thursday, September 26, 2019, 14:03 |
Aaron Schmidt | Nb | 41882-3 | TARGET BOAT | In progress | HS swap & test Nb target | HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS |
|
458
|
Tuesday, September 17, 2019, 13:25 |
Aaron Schmidt | | | LP-SIS | Problems resolved | Turbo pump / roughing troubleshoot. | Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23: |
|
457
|
Monday, September 16, 2019, 14:50 |
Aaron Schmidt | Ta | 44062-5 | LP-SIS | In progress | Conditioning Ta#59 | Ta#59 LP-SIS |
|
456
|
Wednesday, September 11, 2019, 15:16 |
Marla Cervantes | | 44062-4 | LP-SIS | Done | TaC coated target container calibration/conditioning | Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog |
|
455
|
Friday, September 06, 2019, 11:58 |
Darwin Ortiz Rosales | | 44062-4 | LP-SIS | Done | TaC coating/sintering | Friday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields. |
|
454
|
Wednesday, August 28, 2019, 05:59 |
Marla Cervantes | | 44062-2-SK | | Done | Graphite insert test | Wednesday, August 28, 2019, 06:00
A graphite insert (with conical |
|
453
|
Monday, August 12, 2019, 15:55 |
John Wong | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
|
|
452
|
Tuesday, July 30, 2019, 15:42 |
Darwin Ortiz Rosales | ZrC | 43044-6 | LP-SIS | Done | Sintering ZrC Discs |
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length, |
|
451
|
Wednesday, July 17, 2019, 11:13 |
Marla Cervantes | Nb | 40282-4 | TARGET BOAT | Done | Annealing of RRR-Nb test samples | Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. |
|
450
|
Monday, June 24, 2019, 08:42 |
Darwin Ortiz Rosales | SiC | 42464-4 | HP-FEBIAD | Done | Conditioning of BSiC discs |
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in including container |
|
449
|
Monday, June 17, 2019, 17:09 |
Marla Cervantes | | 49044-9 | LP-SIS | Done | Target container calibration/conditioning | Monday, June 17, 2019, 17:04
A LP-SIS target container was
wrapped with 3 heat shielding layers, |
|
448
|
Monday, June 17, 2019, 17:03 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Thursday, June 6, 2019, 16:43
A graphite insert with tantalum |
|
447
|
Tuesday, June 04, 2019, 08:41 |
Darwin Ortiz Rosales | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on endcaps and springs | Tuesday,
June 04, 2019, 08:36
|
|
446
|
Friday, May 24, 2019, 15:29 |
Marla Cervantes | | 43943-2 | | Done | Graphite insert test | Friday, May 24, 2019, 15:26
A graphite insert with tantalum
wires in its caps |
|
445
|
Tuesday, May 21, 2019, 18:01 |
Marla Cervantes | | 43943-1 | | Done | Graphite foil test | Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite |
|
444
|
Tuesday, May 21, 2019, 14:34 |
Aaron Schmidt | | | | | HS swap to EVAP 2 flex line. | Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS. |
|
443
|
Tuesday, May 14, 2019, 13:57 |
Aaron Schmidt | | | LP-FEBIAD | Done | Test FEBIAD | Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.) |
|
442
|
Friday, May 10, 2019, 16:58 |
Marla Cervantes | | 43943-1 | | Done | TaC coating/sintering for graphite insert test | Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets, |
|
441
|
Tuesday, April 30, 2019, 09:35 |
Darwin Ortiz Rosales | Empty | 43044-6 | LP-SIS | Done | TaC coating/sintering | Tuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields. |
|
440
|
Tuesday, April 23, 2019, 13:55 |
Aaron Schmidt | Ta | 43044-4 | LP-SIS | In progress | Conditioning Ta#58 | Ta#58 LP-SIS |
|
|