  Evaporator_2, Page 12 of 34  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  459   Thursday, September 26, 2019, 14:03 Aaron SchmidtNb41882-3TARGET BOATIn progressHS swap & test Nb target HS# 42752-7
Thursday, September 26, 2019, 13:46:
Remove Flexible lines HS
  
  458   Tuesday, September 17, 2019, 13:25 Aaron Schmidt  LP-SISProblems resolvedTurbo pump / roughing troubleshoot.Swapped out VCRs on HS to tray connection.
(Right one felt slightly off)
Tuesday, September 17, 2019, 13:23:
  
  457   Monday, September 16, 2019, 14:50 Aaron SchmidtTa44062-5LP-SISIn progressConditioning Ta#59 Ta#59 LP-SIS  Ta#59_Evap_2_Conditioning..docx 
  456   Wednesday, September 11, 2019, 15:16 Marla Cervantes 44062-4LP-SISDoneTaC coated target container calibration/conditioning  Wednesday, September 11, 2019, 15:12
A target container coated with TaC elog
 A.JPGB.JPG 
  455   Friday, September 06, 2019, 11:58 Darwin Ortiz Rosales 44062-4LP-SISDoneTaC coating/sinteringFriday, September 06, 2019, 11:20
Container was coated with Tac and
wrapped with 2 Ta heat shields.
 190906LPSIS_Sintering.PNG 
  454   Wednesday, August 28, 2019, 05:59 Marla Cervantes 44062-2-SK DoneGraphite insert testWednesday, August 28, 2019, 06:00
A graphite insert (with conical
  
  453   Monday, August 12, 2019, 15:55 John WongZrC43044-6LP-SISDoneSintering ZrC Discs


   
        
            
 ZrC_43044-6_inspection.pdf 
  452   Tuesday, July 30, 2019, 15:42 Darwin Ortiz RosalesZrC43044-6LP-SISDoneSintering ZrC Discs 
 
Tuesday,
July 30, 2019, 15:33
ZrC backup Target 12.6 cm disc length,
  
  451   Wednesday, July 17, 2019, 11:13 Marla CervantesNb40282-4TARGET BOATDoneAnnealing of RRR-Nb test samples Wednesday, July 17, 2019, 10:57
Annealing of five RRR Nb samples
following cold-working and resistance measurements. 
  
  450   Monday, June 24, 2019, 08:42 Darwin Ortiz RosalesSiC42464-4HP-FEBIADDoneConditioning of BSiC discs
Monday, June 24, 2019, 08:24
Total number of foils: 484
Total mass in  including container
  
  449   Monday, June 17, 2019, 17:09 Marla Cervantes 49044-9LP-SISDoneTarget container calibration/conditioning Monday, June 17, 2019, 17:04
A LP-SIS target container  was
wrapped with 3 heat shielding layers,
  
  448   Monday, June 17, 2019, 17:03 Marla Cervantes 43943-2 DoneGraphite insert testThursday, June 6, 2019, 16:43
A graphite insert with tantalum
  
  447   Tuesday, June 04, 2019, 08:41 Darwin Ortiz RosalesEndcaps TARGET BOATDoneSintering TaC coating on endcaps and springsTuesday,
June 04, 2019, 08:36
  
  446   Friday, May 24, 2019, 15:29 Marla Cervantes 43943-2 DoneGraphite insert testFriday, May 24, 2019, 15:26
 A graphite insert with tantalum
wires in its caps
  
  445   Tuesday, May 21, 2019, 18:01 Marla Cervantes 43943-1 DoneGraphite foil test Tuesday, May 21, 2019, 17:57
A tantalum tube previously coated
with TaC and sintered was loaded with graphite
  
  444   Tuesday, May 21, 2019, 14:34 Aaron Schmidt    HS swap to EVAP 2 flex line. Tuesday, May 21, 2019, 14:33: Install
flexible line evap 2 HS.
  
  443   Tuesday, May 14, 2019, 13:57 Aaron Schmidt  LP-FEBIADDoneTest FEBIAD Tuesday, May 14, 2019, 13:56: Removed
old HS w/ flexible lines & swapped in
the FEBIAD. (HS waterlines are still purged.)
  
  442   Friday, May 10, 2019, 16:58 Marla Cervantes 43943-1 DoneTaC coating/sintering for graphite insert test Friday, May 10, 2019, 16:54
A tantalum tube was coated with TaC,and
wrapped with three tantalum sheets,
  
  441   Tuesday, April 30, 2019, 09:35 Darwin Ortiz RosalesEmpty43044-6LP-SISDoneTaC coating/sinteringTuesday, April 30, 2019, 09:33
Container was coated with TaC and
wrapped with 2 Ta heat shields.
 43044_6a.png43044_6b.png 
  440   Tuesday, April 23, 2019, 13:55 Aaron SchmidtTa43044-4LP-SISIn progressConditioning Ta#58Ta#58 LP-SIS  Ta#58_Loading_data.pdfTa#58_Evap_2_Conditioning..docx 