368
|
Thursday, May 11, 2017, 11:25 |
Laura Lambert | Empty | 41369-10 | HP-FEBIAD-CTL | Done | RUSH! Sintering TaC coated container for SiC#36 | Thursday, May 11, 2017, 11:21
Turns out SiC HP-FEBIAD that has
finished conditioning is loaded in the wrong |
 |
367
|
Thursday, May 11, 2017, 10:51 |
Laura Lambert | Empty | | TARGET BOAT | Done | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|
366
|
Wednesday, May 10, 2017, 21:33 |
Anders Mjos | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down |
|
|
365
|
Wednesday, May 10, 2017, 16:07 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Conditioning Heat Shield for IGLIS UCx#20 - test stand is down | Wednesday, May 10, 2017, 16:05
Loaded.
HS water valves opened, no leaks |
|
364
|
Monday, May 08, 2017, 10:05 |
Laura Lambert | | | | Maintenance | Turbo pump control box replaced | Monday, May 08, 2017, 10:05
Turbo pump control box died last
week. |
|
363
|
Wednesday, May 03, 2017, 16:10 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Done | Sintering SiC#36 |
|
8x |
362
|
Wednesday, May 03, 2017, 16:09 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Problems resolved | Sintering SiC#36 |
|
|
361
|
Wednesday, May 03, 2017, 13:48 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | Problems | Sintering SiC#36 |
|
 |
360
|
Thursday, April 27, 2017, 15:54 |
Laura Lambert | SiC | 39530-10 | HP-FEBIAD | In progress | Sintering SiC#36 | Thursday, April 27, 2017, 14:01
Target container contains 470 |
|
359
|
Thursday, April 20, 2017, 12:45 |
John Wong | np-SiC | | TARGET BOAT | In progress | Higher Temp Treament: B3-92Mpa pellets | Thursday, April 20, 2017, 12:38
3 samples are loaded into the Ta
boat and wrapped with heat shield (1 long |
|
358
|
Thursday, April 13, 2017, 12:03 |
Laura Lambert | SiC | | TARGET BOAT | Done | Sintering SiC pellets | Thursday, April 13, 2017, 12:01
Pellets made this morning and weighed.
Placed in a graphite boat which is |
 |
357
|
Thursday, April 06, 2017, 13:16 |
Laura Lambert | Empty | 40282-2 | TARGET BOAT | Done | Sintering TaC coating on evap1 target boat |
|
|
356
|
Thursday, April 06, 2017, 11:15 |
Laura Lambert | Empty | | TARGET BOAT | Problems resolved | Sintering TaC coating on evap1 target boat |
|
 |
355
|
Thursday, April 06, 2017, 08:57 |
Laura Lambert | Empty | | TARGET BOAT | Problems | Sintering TaC coating on evap1 target boat |
|
|
354
|
Wednesday, April 05, 2017, 15:42 |
Laura Lambert | Empty | | TARGET BOAT | In progress | Sintering TaC coating on evap1 target boat | Wednesday, April 05, 2017, 15:36
Coated container with TaC coating
using spray technique this morning and let |
|
353
|
Friday, March 31, 2017, 12:22 |
John Wong | np-SiC | | TARGET BOAT | In progress | Thermo test: B3 Pellets (13.3K-PSI) | Friday, March 31, 2017, 12:21
Two compressed pellets loaded into
the target boat and wrapped with Ta foil. |
 |
352
|
Monday, March 13, 2017, 15:34 |
Anders Mjos | Ta | 41790-4 | LP-SIS | Done | Conditioning Ta#51 | Target container wrapped in 3x heat shield
foils and installed by JW
Monday, March 13, 2017, 15:33: |
|
351
|
Saturday, March 11, 2017, 11:58 |
John Wong | np-SiC | | TARGET BOAT | Done | Thermo test B3 Pellets | Friday, March 10, 2017, 17:29
Three B3 pellets are loaded into
the container for thermo test. |
|
350
|
Tuesday, February 21, 2017, 15:21 |
Laura Lambert | Empty | 42218-1 | LP-IG-LIS | Done | sintering TaC coating on UCx#20 container | Tuesday, February 21, 2017, 15:19
Container coated with TaC using |
 |
349
|
Tuesday, February 14, 2017, 15:48 |
Laura Lambert | Endcaps | | TARGET BOAT | Done | Sintering TaC coating on Ta endcaps and springs |
|
   |