Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Evaporator_2, Page 18 of 35  Not logged in ELOG logo
ID Date Author Target Material Target Oven W.O# Source Status Subject Text Attachments
  349   Tuesday, February 14, 2017, 15:48 Laura LambertEndcaps TARGET BOATDoneSintering TaC coating on Ta endcaps and springs

    

       
            
 IMG_1542.JPGIMG_1545.JPGIMG_1549.JPGIMG_1552.JPG 
  348   Tuesday, February 14, 2017, 15:44 Laura LambertEndcaps TARGET BOATProblems resolvedSintering TaC coating on Ta endcaps and springs

    

       
            
  
  347   Thursday, February 09, 2017, 23:28 John Wongnp-SiC TARGET BOATDoneThermotest: SiC-SiO2-Lys and SiC pelletsThursday, February 09, 2017, 23:26
There are two types of samples being
test for thermal stability:
 striptool_01.JPG 
  346   Thursday, February 09, 2017, 11:49 Laura Lambert   MaintenanceNew heatshield with flexible water lines Thursday, February 09, 2017, 11:47
A new heatshield with flexible water
lines has been put into evap2 last Friday
  
  345   Monday, February 06, 2017, 11:17 Anders Mjos   Problems resolvedIOC restart after power outagae Dave Morris did a remote restart
of the IOC after the outage. Turbo pump started.
  
  344   Friday, February 03, 2017, 14:18 Laura LambertEndcaps TARGET BOATProblemsSintering TaC coating on Ta endcaps and springs Friday, February 03, 2017, 14:17
The endcaps are stacked together
 IMG_1526.JPGIMG_1527.JPG 
  343   Tuesday, January 31, 2017, 16:03 Laura LambertEmpty39530-10HP-FEBIADDoneSintering TaC coated container for backup Tuesday, January 31, 2017, 13:43
Container coated with TaC using
 39530-10(1).JPG39530-10(2).JPG 
  342   Tuesday, December 20, 2016, 15:04 Laura Lambert   MaintenanceRETURN and SUPPLY valves CLOSED for xmas breakTuesday, December 20, 2016, 15:05
confirmed ~full tank of Ar for glove
box --> ~1600psi 
  
  341   Friday, December 16, 2016, 14:14 Laura LambertTa39530-3LP-FEBIADDoneConditioning Ta FEBIAD target for shutdown tests Friday, December 16, 2016, 14:08
Target consists of 470 discs.
 Ta-FEBIAD.xlsxEvernote_Camera_Roll_20161220_145947.jpg 
  340   Thursday, December 01, 2016, 16:08 Laura LambertEmpty42218-12LP-SISDonesintering TaC coating on UCx#19 container Thursday, December 01, 2016, 16:06
Container coated with TaC using
  
  339   Tuesday, November 22, 2016, 15:58 Laura LambertNb40282-3TARGET BOATDoneConditioning Nb samples for DougTuesday, November 22, 2016, 15:53
Target boat has a layer of niobium
 samples.jpgevap2.jpgheating_up.xlsxvisual_of_MIKRON_pointing_at_samples.JPG 
  338   Friday, November 18, 2016, 17:28 John Wongnp-SiC TARGET BOATDoneHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  337   Thursday, November 17, 2016, 11:15 Laura Lambertnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1


   
        
            
  
  336   Tuesday, November 15, 2016, 16:51 John Wongnp-SiC TARGET BOATIn progressHeat-treatment: Beta-SiC (1um) fiber mats - SAMPLE ID: A1Tuesday, November 15, 2016, 16:48
Three samples were prepared 
(see my logbook#1 page 3, preparing for carbonization).
  
  335   Monday, October 24, 2016, 17:52 John Wongnp-SiC TARGET BOATDoneThermo test of np-SiC raw powder Monday, October 24, 2016, 17:43
Two samples were prepared and loaded
into the target boat with 1 layer of heat-shied
 Capture.JPG450A_1500C.JPG 
  334   Tuesday, October 18, 2016, 09:23 Laura LambertTa41790-5LP-SISDoneTemperature measurements for Ta#50

    

       
            
  
  333   Sunday, October 16, 2016, 17:55 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  332   Saturday, October 15, 2016, 12:42 Aurelia LaxdalTa41790-5LP-SISIn progressTemperature measurements for Ta#50

    

       
            
  
  331   Thursday, October 13, 2016, 18:05 Laura LambertTa41790-5LP-SISIn progressTemperature measurements for Ta#50Thursday, October 13, 2016, 18:04
Target loaded into evap2
No heat shields.
  
  330   Thursday, October 13, 2016, 17:32 Laura LambertTa41790-5LP-SISDoneConditioning Ta#50

    

       
            
  
ELOG V2.9.2-2455