232
|
Monday, November 26, 2018, 17:06 |
Marla Cervantes | UO2/C | 40202-1 | TARGET BOAT | Done | UCx Fully loaded graphite insert - UCx26 |
|
|
|
81
|
Friday, October 11, 2013, 18:10 |
John Wong | UC2 | 39814-IV | LP-IG-LIS | Done | UCx#8 - Final Conditioning | Friday, October 11, 2013, 18:00
|
|
|
93
|
Wednesday, April 30, 2014, 14:58 |
John Wong | UC2 | 39165-9 | LP-SIS | Done | Conditioning UCx#9 | Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2. |
|
|
65
|
Thursday, May 30, 2013, 16:25 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 | Thursday, May 30, 2013, 16:16
The target container was previously
coated with TaC and sintered in Evap 2. |
|
|
66
|
Wednesday, June 05, 2013, 16:52 |
Laura Lambert | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
|
67
|
Thursday, June 06, 2013, 16:56 |
John Wong | UC2 | 39165-6 | LP-SIS | Done | Conditioning UCx#06 |
|
|
|
57
|
Friday, August 24, 2012, 16:44 |
John Wong | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx#5 | Friday, August 24, 2012, 16:40
Target is loaded with 245 discs of
UCx (material from batch#02-13062012), |
|
|
58
|
Monday, September 03, 2012, 02:56 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic/volatile burnoff complete at TGHT
= 190A. Rampdown initiated. |
|
|
59
|
Tuesday, September 04, 2012, 17:26 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Organic gunk cleaned out. Beginning 2nd phase
of conditioning. |
|
|
60
|
Friday, September 07, 2012, 17:21 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Target 6h at 520A. IEVAP:IG1 8.4e-6 Torr.
Cool down sequence initiated. |
|
|
61
|
Monday, September 10, 2012, 11:00 |
Peter Kunz | UC2 | 39165-5 | LP-SIS | In progress | Conditioning UCx05 | Plot of conditioning run: IEVAP:IG1, TGHT |
|
|
95
|
Friday, June 13, 2014, 15:21 |
John Wong | UC2 | 39165-10 | LP-SIS | Done | Conditioning UCx#10 | Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC. It's wrapped |
|
|
46
|
Thursday, April 05, 2012, 16:47 |
John Wong | Empty | 38817-3 | HP-SIS | Done | Coating target oven /w TaC & sintering | Thursday, April 05, 2012, 16:43
Target oven is coated with TaC.
The oven is wrapped with 3 Ta-heat shields. |
|
|
47
|
Tuesday, May 08, 2012, 07:42 |
John Wong | SiC | 38817-3 | HP-SIS | Done | Sintering SiC | Tuesday, May 08, 2012, 07:32
Target oven is filled with 240 discs
of SiC/C, and wrapped with 3 Ta-foils. |
|
|
19
|
Tuesday, May 10, 2011, 14:58 |
John Wong | Empty | 38817-2 | HP-SIS | Done | Diffusion bonding of Ta Fins for HP-SIS (w.o#38817-2) | Tue May 10 14:56:05 2011: Target
is wrapped with 3 heat-shields. The
evaporator is pumping down, vac @ 4.72e-6 |
|
|
18
|
Monday, May 09, 2011, 16:10 |
John Wong | Empty | 38817-1 | HP-SIS | Done | Diffusion bonding of Ta Fins | Mon May 9 16:09:35 2011: Target
is wrapped with 3 Ta heatshields and the
evaporator is begin pumped down. |
|
|
40
|
Thursday, September 22, 2011, 20:34 |
John Wong | Empty | 38634-9 | LP-SIS | Done | Sintering TaC coating for UCx#2 (spare) | Thursday, September 22, 2011, 20:21
Target oven was wrapped with 3 Ta-heat
shields and has been pumping down. |
|
|
55
|
Tuesday, July 10, 2012, 12:54 |
John Wong | UC2 | 38634-9 | LP-SIS | Done | UCx#4 final conditioning completed | Tuesday, July 10, 2012, 12:44
Target contains 230 discs of UCx
(material from UC2 flakes, batch#01-04062012). |
|
|
27
|
Wednesday, August 03, 2011, 17:16 |
John Wong | Empty | 38634-8 | LP-SIS | Done | Sintering TaC coating | Wednesday, August 03, 2011, 20:27 : Target
was wrapped with 3 new Ta-heat shields and
2 around the back block. The tar from |
|
|
28
|
Thursday, August 04, 2011, 17:46 |
John Wong | UC2 | 38634-8 | LP-SIS | Problems resolved | Repacking UCx in new target oven | Thursday, August 04, 2011, 17:44:
All the UCx material from target oven 38634-3
was recovered and repacked in this new oven. |
|