  69   Tuesday, June 25, 2013, 16:28 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  71   Thursday, July 11, 2013, 16:22 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  72   Monday, July 15, 2013, 09:45 John WongUO2/CTarget boat #2 DoneProcessing UC2 flakes (batch#05 - 18062013)

    

       
            
  
  74   Monday, August 05, 2013, 07:52 John WongUC238634-7LP-SISDoneConditioning UCx # 07

    

       
            
 UC#7_final_conditioning.PNG 
  75   Thursday, August 22, 2013, 18:00 John WongUO2/CTarget Boat #2 DoneProcessing UC2 flaskes (batch#06 - 08222013Thursday, August 22, 2013, 17:31
1st attempt: 
UO2/C green was prepared on Aug 14,
 UO2_C_cast.PNGUCx_flakes.PNG 
  76   Friday, August 23, 2013, 16:11 John WongUO2/CTarget Boat #2 Problems resolvedProcessing UC2 flaskes (batch#06 - 08222013

    

       
            
  
  79   Friday, September 20, 2013, 13:49 John WongUO2/CTarget Boat #2 DoneProcessing UC2Flk_00

    

       
            
  
  80   Friday, October 04, 2013, 15:56 John WongEmpty LP-SISDoneIgnore this entry - Process was done in Evap2Friday, October 04, 2013, 15:37
A LP target container is coated with
TaC.  The container is wrapped with
  
  81   Friday, October 11, 2013, 18:10 John WongUC239814-IVLP-IG-LISDoneUCx#8 - Final Conditioning Friday, October 11, 2013, 18:00
 
  
  89   Tuesday, March 04, 2014, 15:48 John Wong  TARGET BOATIn progressRe-sinterring end capsTuesday, March 04, 2014, 15:43
Theses endcaps (4) were previously
sinterred in Evap#2 but some surfaces were
  
  91   Wednesday, March 05, 2014, 23:05 John Wong  TARGET BOATDoneRe-sinterring end caps

    

       
            
 endcaps_Mar3_2014.PNG 
  92   Monday, March 24, 2014, 17:53 John WongUO2/C TARGET BOATDoneProcessing UC2Flk_02 Monday, March 24, 2014, 17:50
UO2/C cast was prepared on March
21 and let dry over the weekend.  The
 UC2_flakes_batch#09-03242014.PNG 
  93   Wednesday, April 30, 2014, 14:58 John WongUC239165-9LP-SISDoneConditioning UCx#9Wednesday, April 30, 2014, 14:50
The target container was previously
coated with TaC and sintered in Evap 2.
 UCx#9_final_conditioning.PNG 
  94   Wednesday, May 21, 2014, 11:41 John WongUC2 TARGET BOATIn progressTests: Sintering carbon Mesh coated with UC2Tuesday, May 20, 2014, 16:01
Target boat contains one pellet of
carbon mesh coated with UC2.  The sample
 Vac_Cur_plot.PNG 
  95   Friday, June 13, 2014, 15:21 John WongUC239165-10LP-SISDoneConditioning UCx#10 Friday, June 13, 2014, 15:02
Target container was previously coated
and sintered with TaC.  It's wrapped
  
  96   Friday, July 04, 2014, 10:23 John WongThO240282-2TARGET BOATDoneTest: Sintering ThO2 with Nb backing foils Friday, July 04, 2014, 10:13
Target boat contains 4 set of samples. 
Each sample consists of 5pack ThO2/Nb. 
 2014-07-03_12.29.29.jpgThO_raw_green_sintered_30um.pngpressure_current_plot.PNG 
  98   Thursday, August 14, 2014, 17:56 John WongThO2 LP-SISDoneSintering ThO2#1 Thursday, August 14, 2014, 17:54
Target container consists of 240
discs of ThO2/Nb discs.  The container
  
  101   Friday, October 10, 2014, 14:00 John WongUO2/C40282-1TARGET BOATDoneProcessing UC2Flk_04

    

       
            
 archiver_TGHT&VAC.PNG 
  103   Monday, October 20, 2014, 16:22 John WongUC240282-5LP-SISDoneConditioning UCx #11

    

       
            
 power_bump.PNG 
  113   Thursday, July 02, 2015, 13:01 John WongUC240860-1LP-IG-LISIn progressConditioning UCx #13

    

       
            
  