Mon Oct 4 09:40:30 2010 |
Damien Gallop | | | OLIS Maintenance and Development completed | The September Mini-Shutdown is now a memory.
The few days available to OLIS were used
for MCIS Development on 197Au. Productive. |
|
312
|
Tue Jul 13 18:33:04 2010 |
Damien Gallop | | | OLIS Maintenance and Development | A source switchover day was negotiated,
with a goal to provide 12C2+ beam. As a practical
matter, it's been an OLIS Maintenance Day, |
|
340
|
Fri Sep 24 13:22:00 2010 |
Damien Gallop | | | OLIS Maintenance and Development | Supernanogan on overnight, in the search
for gold. A trace of 197Au34 observed this
morning. Development continues. |
|
248
|
Mon Apr 19 17:12:55 2010 |
Damien Gallop | | | OLIS Maintenance | Just in: an active work permit for OLIS
maintenance. Underway through tomorrow (Tuesday)
evening. |
|
249
|
Tue Apr 20 09:02:18 2010 |
Damien Gallop | | | OLIS Maintenance | Maintenance Day for OLIS started late yesterday
afternoon. Source up at end of the day. See
attached Stripchart and in particular how |
  |
307
|
Tue Jul 6 19:10:33 2010 |
Damien Gallop | | | OLIS Maintenance | Source pulled down for Mg removal and cleanup.
Done. Supernanogan refurbishing of MCIS optics
complete, plus a comple of other items. Opened |
|
316
|
Tue Jul 20 09:38:45 2010 |
Damien Gallop | | | OLIS Maintenance | Our work permit to leakcheck the Supernanogan
and IOS was signed this morning. The source
is off presently, and work is underway. The |
|
320
|
Tue Jul 27 08:55:49 2010 |
Damien Gallop | | | OLIS Maintenance | Today we switch from 74Ge1+ to 4He1+, about
as wide a switch as we've done at OLIS. We
will use the MWS for the 4He. |
  |
392
|
Fri Mar 25 17:42:38 2011 |
Keerthi Jayamanna | | | OLIS HV start up | High Voltage cage is on at ~17:43pm
Interlock cleard and HV (10kV) is
on at 17:53pm |
|
504
|
Wed Nov 19 11:34:55 2014 |
Raymond Dube | Routine | General | OLIS Electrical diagram with 3 I.S. | I updated
the electrical Diagram for OLIS Faraday
Cage with 3 Ion Source, ref: ISK4586D rev. |
|
481
|
Wed Aug 13 15:04:05 2014 |
Raymond Dubé | | | OLIS Bender Magnet PS (0-500 amps) | Arthur
and Derek had a look at the OLIS Bender Magnet
P/S and found a problem with the Polarity |
|
482
|
Wed Aug 13 15:09:42 2014 |
Raymond Dubé | Routine | General | OLIS Attenuators #2 fixed, #1 gone! | Today
Probe group (Scott K.) installed the OLIS
Attenuator, they fixed the vacuum leak on |
|
152
|
Tue Oct 6 15:28:31 2009 |
Keerthi | | | OLIS A/Q changed to 5 (20Ne+4) | Changed OLIS A/Q to 5 (20Ne+4) to satisfy
the CSB and ISAC development changes. 8nA
is sitting at the FC6 |
|
17
|
Fri Jun 12 14:12:04 2009 |
Damien Gallop | Routine | General | OLIS & Supernanogan Facilities presentation | Presentation this morning in Auditorium.
Players:
Keerthi: science |
|
500
|
Wed Nov 12 13:32:47 2014 |
Raymond Dube | Routine | General | New in-line resistors for IOS:PE | Today we replace the in-line resistors
for the Plasma Electrode (PE) it was a 25
ohm 200W (2 x 50 Ohm 100W) with a 50 Ohm |
|
477
|
Fri Jan 24 09:15:10 2014 |
Raymond Dubé | | | New ISK4586D for OLIS with 3 Ion Source | I created
a new drawing: ISK4586D that shows the Optics
for OLIS with 3 Ion Source. |
|
476
|
Thu Jan 23 12:56:14 2014 |
Raymond Dubé | | | New & updated drawings for S.S. | I updated
an old drawing ISK4478D (MS & MCIS Optics)
and created 2 new ones: ISK4583D (Electrical |
  |
157
|
Sun Oct 11 13:17:37 2009 |
Keerthi | | | Neon Leak closed | Neon leak close for upcoming 33S development. |
|
382
|
Fri Dec 24 13:06:07 2010 |
Damien Gallop | | | Merry Christmas and Happy New Year | Our very best to all of you. |
|
52
|
Wed Jul 8 16:12:51 2009 |
Damien Gallop | Routine | General | Mass scan in progress | A mass scan from A/q of zero to 25 is in
progress. Data file (large): masscorr_mcis_090708.txt.