  471   Sun Dec 2 23:36:13 2012 Keerthi JayamannaRoutineGeneral16O+2 is ready for tuning.MCIS finished xenon development. MCIS is off
and isolation valve is shut.
A new oxygen gas line is installed to microwave
  
  479   Fri May 16 08:44:27 2014 Raymond DubéRoutineGeneralOLIS work next weekAttached
is the scheduled work for OLIS next week.
 OLIS-Work-05.pdf 
  480   Wed Aug 13 15:00:27 2014 Raymond DubéRoutineGeneralOLIS Surface Source broken Ionizer CoilWe spent
most of the day looking at OLIS to find out
why the "Ionizer Coil" keeps breaking
 ISK4386D-rev5.pdfISK4583D-rev7.pdfISK4584D-rev1.pdfPE-R5-FAN_ON.jpg 
  482   Wed Aug 13 15:09:42 2014 Raymond DubéRoutineGeneralOLIS Attenuators #2 fixed, #1 gone!Today
Probe group (Scott K.) installed the OLIS
Attenuator, they fixed the vacuum leak on
  
  483   Tue Sep 16 11:55:28 2014 Raymond DubéRoutineGeneralMCIS infoI found
these files about the MCIS in Geoff folders
in M:\ISIS\Geoff-110715\OLIS\SuperNanogan
 Cart-Power1.pdfSuperNanogan_Control-R1.pdfSupernanogan_Interlocks-R1.pdf 
  484   Fri Oct 10 14:02:56 2014 Raymond DubeRoutineGeneralTest with new Alga, ALPA 50W RF AMPWe did a test yesterday with the new Alga
Microwave RF AMP, model # ALPA 50 Watt, serial
# 130684 to be used for the MCIS.  We
 ALPA-RF_AMP-50W.pdf 
  485   Tue Oct 14 08:31:53 2014 Brian MinatoOtherGeneralWater Flow Switch #3This entry was incorrectly added to the
OLIS logbook.  it has been moved to
the I3 logbook.
  
  486   Tue Oct 21 07:14:26 2014 Brian MinatoOtherGeneralOLIS WorkMCIS-
the cart was moved into the HV cage. 
The facilities will be connected and an oven
  
  487   Wed Oct 22 07:58:32 2014 Brian MinatoOtherGeneralMCIS WorkThe remaining connections were done on
the MCIS. 
A piece of 1/8" teflon was installed
  
  488   Thu Oct 23 10:52:21 2014 Brian MinatoRoutineGeneralALGA AmplifierThe ALGA amplifier and its signal generator
have been turned off at the request of Controls. 
They have had communication issues and are
  
  494   Thu Oct 30 22:44:45 2014 Keerthi JayamannaRoutineGeneralMass scan 3 to 4IOS mass scan if faulty. These is a manual
scan from mass 3 to 4
Const22 = 0.04187  adjusted
  
  495   Thu Oct 30 23:37:58 2014 Keerthi JayamannaRoutineGeneralMass scan 4 to 6A/Q           
FC6
4               
  
  496   Thu Oct 30 23:44:57 2014 Keerthi JayamannaRoutineGeneralOLIS Supernanogan mass scan 6 to 7.5A/q          
FC6  (only current over 100pA)
6.0          
  
  500   Wed Nov 12 13:32:47 2014 Raymond DubeRoutineGeneralNew in-line resistors for IOS:PEToday we replace the in-line resistors
for the Plasma Electrode (PE) it was a 25
ohm 200W (2 x 50 Ohm 100W) with a 50 Ohm
 ISK4583D-rev10.pdf 
  503   Tue Nov 18 08:56:23 2014 Brian MinatoOtherGeneralALGA UpdateThere has been no noticeable loss of communication
to the ALGA 50watt amplifier.  As a
test, the ethernet cable was removed for
  
  504   Wed Nov 19 11:34:55 2014 Raymond DubeRoutineGeneralOLIS Electrical diagram with 3 I.S.I updated
the electrical Diagram  for OLIS Faraday
Cage with 3 Ion Source, ref: ISK4586D rev.
 ISK4586D-rev2.pdf 
  505   Tue Nov 25 07:49:50 2014 Brian MinatoOtherGeneralMCIS and SIS UpdateMCIS-
the Se was loaded into the oven last
friday (21st).  During the weekend the
  
  506   Tue Nov 25 12:23:28 2014 Keerthi JayamannaRoutineGeneral76Se+13 tune saved141125_1159_OLIS_76Se+13.snap is saved
in reference directory.
El=3480/4303V
  
  508   Mon Apr 20 08:09:03 2015 Brian MinatoRoutineGeneralOLIS Shutdown UpdateThe OLIS 1 week shutdown has been completed
(WP 2015-04-13-1).
General-
  
  511   Mon Sep 14 11:21:16 2015 Keerthi JayamannaRoutineGeneral20Ne+2 beam saved20Ne+2 beam optics saved as 150914_1117_ios0iosfc6.snap   