Entry  Fri Jan 15 15:30:02 2010, keerthi, , , Supernanogan oven start up 
Voltage              Current             MCIC:IG1
0                            0                
      7.35e-8
Entry  Fri May 22 12:31:36 2009, Raymond Dubé, , , Test 
Hello world
Entry  Wed Jan 22 10:34:58 2014, Raymond Dubé, , , IN-line 100K for IOS:YCB1A removed 
Last January 17th 2014 we removed an in-line resistor (100K 10W) from IOS:YCB1A because we do not think that it is needed.
 
Entry  Thu Jan 23 12:56:14 2014, Raymond Dubé, , , New & updated drawings for S.S. ISK4478D-rev5.pdfISK4585D-rev2.pdfISK4583D-rev5.pdf
I updated an old drawing ISK4478D (MS & MCIS Optics) and created 2 new ones: ISK4583D (Electrical Diagram for SS
& MS) and ISK4585D (SS & MS Optics)
If you see any errors please let me know.
Entry  Fri Jan 24 09:15:10 2014, Raymond Dubé, , , New ISK4586D for OLIS with 3 Ion Source ISK4586D-rev1.pdf
I created a new drawing: ISK4586D that shows the Optics for OLIS with 3 Ion Source.
Entry  Wed Jan 29 12:27:57 2014, Raymond Dubé, , , OLIS Skimmers BOP & Labels isk4363d-rev4.pdfisk4365d-rev2.pdf
I updated 2 drawings that show the OLIS skimmers.
A.  ISK4363D for the OLIS Skimmers BOP connections, we have 7 skimmers cables (6 wires per cable) going in
and 16 skimmers channel going out to Controls.
Entry  Fri May 16 08:44:27 2014, Raymond Dubé, Routine, General, OLIS work next week OLIS-Work-05.pdf
Attached is the scheduled work for OLIS next week.
Entry  Wed Aug 13 15:00:27 2014, Raymond Dubé, Routine, General, OLIS Surface Source broken Ionizer Coil ISK4386D-rev5.pdfISK4583D-rev7.pdfISK4584D-rev1.pdfPE-R5-FAN_ON.jpg
We spent most of the day looking at OLIS to find out why the "Ionizer Coil" keeps breaking down, we found
the following:
1.  The FAN to cool R5 (ref: ISK4583D rev.7) a 25 Ohm 200W Resistor (2x50 ohm/100W ea.) was not ON, the nylon
Entry  Wed Aug 13 15:04:05 2014, Raymond Dubé, , , OLIS Bender Magnet PS (0-500 amps) 
Arthur and Derek had a look at the OLIS Bender Magnet P/S and found a problem with the Polarity Switch, it was set up
upside down, they fixed that.
Note: We do not need a Polarity Switch for OLIS may be we should remove or bypass it, at the moment when the PS
Entry  Wed Aug 13 15:09:42 2014, Raymond Dubé, Routine, General, OLIS Attenuators #2 fixed, #1 gone! 
Today Probe group (Scott K.) installed the OLIS Attenuator, they fixed the vacuum leak on Attenuator #2,  Marco
M. asked them to remove Attenuator #1 because it is not needed and confusing for Ops;
 
Entry  Tue Sep 16 11:55:28 2014, Raymond Dubé, Routine, General, MCIS info Cart-Power1.pdfSuperNanogan_Control-R1.pdfSupernanogan_Interlocks-R1.pdf
I found these files about the MCIS in Geoff folders in M:\ISIS\Geoff-110715\OLIS\SuperNanogan
Entry  Fri Oct 10 14:02:56 2014, Raymond Dube, Routine, General, Test with new Alga, ALPA 50W RF AMP ALPA-RF_AMP-50W.pdf
We did a test yesterday with the new Alga Microwave RF AMP, model # ALPA 50 Watt, serial # 130684 to be used for the MCIS.  We used the RF Generator
from MISTIC and set the frequency to 13.80 Ghz, note that the RF Generator was/is  limited to 16DB maxiumum RF output.
The RF cable that we used was from the 200W RF AMP, it has a 20DB SMA attenuator at the Generator end, so we could only get about 25 Watts maximum
Entry  Wed Nov 12 13:32:47 2014, Raymond Dube, Routine, General, New in-line resistors for IOS:PE ISK4583D-rev10.pdf
Today we replace the in-line resistors for the Plasma Electrode (PE) it was a 25 ohm 200W (2 x 50 Ohm 100W) with a 50 Ohm 200W (2 x 100 Ohm / 100W) also
added the inductance coil.
This is R5 on drawing: ISK4583D rev. 10
Entry  Wed Nov 19 11:34:55 2014, Raymond Dube, Routine, General, OLIS Electrical diagram with 3 I.S. ISK4586D-rev2.pdf
I updated the electrical Diagram  for OLIS Faraday Cage with 3 Ion Source, ref: ISK4586D rev. 2
PS:  Make sure that you do not connect both Bias P/S on same Ion Source ... 
Entry  Sat Nov 7 12:21:35 2009, Keerthi Jayamanna, , , 17O hand valve status 
17O+3 at FC6 became 550nA.
17O hand valve found to be closed. Probable cause may be the cold weather.
After opening the valve beam came back. 2.6uA of 17+3 at FC6.
Entry  Wed Nov 18 23:46:14 2009, Keerthi Jayamanna, , , OLIS development started 
All turbos in the OLIS and MCIS are off. No controls for the MCIS. Pumps switched of by pulling the CG cable.
All the gate valves are off. All bypass are removed
Entry  Thu Nov 26 06:20:21 2009, Keerthi Jayamanna, , , Supernanogan Development 
Swiched off all the pumps and ion gauge for oven installation.
 
Entry  Thu Nov 26 06:22:58 2009, Keerthi Jayamanna, , , Cusp source 
Arc power supply does not hold any voltage.
Entry  Fri May 7 12:29:41 2010, Keerthi Jayamanna, , , Supernanogan development 
Supernanogan development for 33S started. All MW and MW and MCIS power sypplies are off.
Gas for microwave source also closed from hand valve
Later... separator field stability development. Local Hall probe is online. Let it cook.
Entry  Fri May 7 19:10:05 2010, Keerthi Jayamanna, Routine, General, OLIS status 
MW source is back and running.
A new vacuum chamber is added to the Supernanogan RF block.
SO2 is not filled in yet.