222
|
Fri Jan 15 15:30:02 2010 |
keerthi | | | Supernanogan oven start up |
Voltage Current MCIC:IG1
0 0 7.35e-8
0.3 0.2 "
1.6 0.4 9.1 e-8
1.6 0.4 7.79e-8 (5min later)
3.3 0.6 8.61e-8
3.3 0.6 8.98e-8 (5min later)
3.3 0.6 9.42e-8(10min later) 14.:36
3.3 0.58 7.89e-8 15:28pm
5.8(9.62RB) 0.8(0.48RB) 1.51e-7 15:30pm
5.8 (9.62RB 0.78(0.47RB) 8.17e-8 16:30pm
8.5V(14.15RB) 1.0(0.60RB) 9.5e-8) 16.33pm
8.5V(14.15RB) 0.97)0.58RB) 8.52e-8 16:45pm
11.6V(19.47RB) 1.20(0.72RB) 1.08e-7 16:47pm
15.2V(25.27RB) 1.4(0.83RB) 1.34e-7 16:53
20.0V(33.02RB) 1.6A(0.96RB) 1.6e-7 17:00
18.4V(30.52RB) 1.64A(0.98RB) 8.6e-8 17:30
21.6V(35.92VRB) 1.8A(1.07RB) 9.42e-8 17:40
25.7V(42.73RB) 2.0A(1.21RB) 1.43e-7 17:50
23.6V(23.14RB) 2.02A(1.21RB) 7.7e-8 20:20
Oven is off 7.62e-8 20:22
|
6
|
Fri May 22 12:31:36 2009 |
Raymond Dubé | | | Test |
Hello world |
475
|
Wed Jan 22 10:34:58 2014 |
Raymond Dubé | | | IN-line 100K for IOS:YCB1A removed |
Last January 17th 2014 we removed an in-line resistor (100K 10W) from IOS:YCB1A because we do not think that it is needed.
|
476
|
Thu Jan 23 12:56:14 2014 |
Raymond Dubé | | | New & updated drawings for S.S. |
I updated an old drawing ISK4478D (MS & MCIS Optics) and created 2 new ones: ISK4583D (Electrical Diagram for SS & MS) and ISK4585D (SS & MS Optics)
If you see any errors please let me know. |
Attachment 1: ISK4478D-rev5.pdf
|
Attachment 2: ISK4585D-rev2.pdf
|
Attachment 3: ISK4583D-rev5.pdf
|
477
|
Fri Jan 24 09:15:10 2014 |
Raymond Dubé | | | New ISK4586D for OLIS with 3 Ion Source |
I created a new drawing: ISK4586D that shows the Optics for OLIS with 3 Ion Source. |
Attachment 1: ISK4586D-rev1.pdf
|
478
|
Wed Jan 29 12:27:57 2014 |
Raymond Dubé | | | OLIS Skimmers BOP & Labels |
I updated 2 drawings that show the OLIS skimmers.
A. ISK4363D for the OLIS Skimmers BOP connections, we have 7 skimmers cables (6 wires per cable) going in and 16 skimmers channel going out to Controls.
B. ISK4365D that shows the skimmers cables location along the OLIS beamline.
|
Attachment 1: isk4363d-rev4.pdf
|
Attachment 2: isk4365d-rev2.pdf
|
479
|
Fri May 16 08:44:27 2014 |
Raymond Dubé | Routine | General | OLIS work next week |
Attached is the scheduled work for OLIS next week. |
Attachment 1: OLIS-Work-05.pdf
|
480
|
Wed Aug 13 15:00:27 2014 |
Raymond Dubé | Routine | General | OLIS Surface Source broken Ionizer Coil |
We spent most of the day looking at OLIS to find out why the "Ionizer Coil" keeps breaking down, we found the following:
1. The FAN to cool R5 (ref: ISK4583D rev.7) a 25 Ohm 200W Resistor (2x50 ohm/100W ea.) was not ON, the nylon insulator (also the plastic tube across to the HV Terminal) was burnt and not holding the R5 resistor properly, I replaced the plastic insulator with a ceramic insulator.
Note that if the PE electrode is open it will charge up to the beam energy and start sparking. Also I used a red heatshrink tubing to prevent the BNC connector (it sits at Common) to touch the Cu pipe for the Plasma electrode water cooling.
2. Drawing for PE Polarity Switch: ISK4386D rev. 5
3. Drawing for EE:SS BOP (resistors & spark gap): ISK4584D rev. 1
4. Drawing for OLIS Surface & McroWave Source electrical diagram: ISK4583D rev. 7 |
Attachment 1: ISK4386D-rev5.pdf
|
Attachment 2: ISK4583D-rev7.pdf
|
Attachment 3: ISK4584D-rev1.pdf
|
Attachment 4: PE-R5-FAN_ON.jpg
|
|
481
|
Wed Aug 13 15:04:05 2014 |
Raymond Dubé | | | OLIS Bender Magnet PS (0-500 amps) |
Arthur and Derek had a look at the OLIS Bender Magnet P/S and found a problem with the Polarity Switch, it was set up upside down, they fixed that.
Note: We do not need a Polarity Switch for OLIS may be we should remove or bypass it, at the moment when the PS goes OFF we need to use the reverse Polarity to Bend the Beam the right way. |
482
|
Wed Aug 13 15:09:42 2014 |
Raymond Dubé | Routine | General | OLIS Attenuators #2 fixed, #1 gone! |
Today Probe group (Scott K.) installed the OLIS Attenuator, they fixed the vacuum leak on Attenuator #2, Marco M. asked them to remove Attenuator #1 because it is not needed and confusing for Ops;
Attenuator #1 was an experiment that Marco M. asked for, it was the same as Attenuator #2 but with 45 degrees offset, the results were not good and he decided to remove it. |
483
|
Tue Sep 16 11:55:28 2014 |
Raymond Dubé | Routine | General | MCIS info |
I found these files about the MCIS in Geoff folders in M:\ISIS\Geoff-110715\OLIS\SuperNanogan |
Attachment 1: Cart-Power1.pdf
|
Attachment 2: SuperNanogan_Control-R1.pdf
|
Attachment 3: Supernanogan_Interlocks-R1.pdf
|
484
|
Fri Oct 10 14:02:56 2014 |
Raymond Dube | Routine | General | Test with new Alga, ALPA 50W RF AMP |
We did a test yesterday with the new Alga Microwave RF AMP, model # ALPA 50 Watt, serial # 130684 to be used for the MCIS. We used the RF Generator from MISTIC and set the frequency to 13.80 Ghz, note that the RF Generator was/is limited to 16DB maxiumum RF output.
The RF cable that we used was from the 200W RF AMP, it has a 20DB SMA attenuator at the Generator end, so we could only get about 25 Watts maximum output. |
Attachment 1: ALPA-RF_AMP-50W.pdf
|
500
|
Wed Nov 12 13:32:47 2014 |
Raymond Dube | Routine | General | New in-line resistors for IOS:PE |
Today we replace the in-line resistors for the Plasma Electrode (PE) it was a 25 ohm 200W (2 x 50 Ohm 100W) with a 50 Ohm 200W (2 x 100 Ohm / 100W) also added the inductance coil.
This is R5 on drawing: ISK4583D rev. 10
This was done to reduce the power on R5
Note: We still need to make sure the the FAN is running to cool the resistors when the PE P/S is ON. |
Attachment 1: ISK4583D-rev10.pdf
|
504
|
Wed Nov 19 11:34:55 2014 |
Raymond Dube | Routine | General | OLIS Electrical diagram with 3 I.S. |
I updated the electrical Diagram for OLIS Faraday Cage with 3 Ion Source, ref: ISK4586D rev. 2
PS: Make sure that you do not connect both Bias P/S on same Ion Source ... |
Attachment 1: ISK4586D-rev2.pdf
|
182
|
Sat Nov 7 12:21:35 2009 |
Keerthi Jayamanna | | | 17O hand valve status |
17O+3 at FC6 became 550nA.
17O hand valve found to be closed. Probable cause may be the cold weather.
After opening the valve beam came back. 2.6uA of 17+3 at FC6.
Notes by DMG 8-Nov-2009:
This valve is barely cracked. Temperature will affect it at such close settings.
Starting pressure Saturday when beam fell off: 4e-8 Torr.
Pressure today with strong beam: 6e-8 Torr.
Pressure during Saturday setup where beam began to quench: 8e-8 Torr.
Conclusion: Correct operating pressure range for Supernanogan source is tight. We removed the MWS head, anticipating this to be the case. It's so even when the slight extra pressure is entirely due to the source gas. |
188
|
Wed Nov 18 23:46:14 2009 |
Keerthi Jayamanna | | | OLIS development started |
All turbos in the OLIS and MCIS are off. No controls for the MCIS. Pumps switched of by pulling the CG cable.
All the gate valves are off. All bypass are removed |
193
|
Thu Nov 26 06:20:21 2009 |
Keerthi Jayamanna | | | Supernanogan Development |
Swiched off all the pumps and ion gauge for oven installation.
|
194
|
Thu Nov 26 06:22:58 2009 |
Keerthi Jayamanna | | | Cusp source |
Arc power supply does not hold any voltage. |
263
|
Fri May 7 12:29:41 2010 |
Keerthi Jayamanna | | | Supernanogan development |
Supernanogan development for 33S started. All MW and MW and MCIS power sypplies are off.
Gas for microwave source also closed from hand valve
Later... separator field stability development. Local Hall probe is online. Let it cook. |
264
|
Fri May 7 19:10:05 2010 |
Keerthi Jayamanna | Routine | General | OLIS status |
MW source is back and running.
A new vacuum chamber is added to the Supernanogan RF block.
SO2 is not filled in yet. |