ID |
Date |
Author |
Target/No.# |
Source |
Station |
Module |
Target Oven W.O# |
Heat Shield W.O# |
Status |
Subject |
Text |
|
|
615
|
Friday, December 01, 2017, 14:31 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | Silver plated bolts test / Outgas TS | Chamber 'open state, no turbos' 2 weeks.
Testing Silver plated 3/8"-16x1"
(SCR, SHC, 18-8, AG) bolt on the TBHT. |
|
|
617
|
Tuesday, December 12, 2017, 08:32 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Pump down w/ possible outgas | Check achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in. |
|
|
618
|
Wednesday, December 20, 2017, 09:11 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Holiday Shut Down | Power/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07: |
|
|
623
|
Friday, January 26, 2018, 13:59 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 1 | Friday, January 26, 2018, 14:00: BIAS/EZL/EE
ramp up.
Friday, January 26, 2018, 14:06: |
|
|
624
|
Monday, January 29, 2018, 10:07 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Power outage / HV test 2 | HV test 2 cancelled. 9:38: BIAS/EZL/EE
@ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) |
|
|
625
|
Tuesday, January 30, 2018, 06:51 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | HV test 3 | Tuesday, January 30, 2018, 06:50: BIAS
/ EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: |
|
|
626
|
Wednesday, January 31, 2018, 09:53 |
Aaron Schmidt | | | | | (Blank) | 42752-3 | Done | Wire moved. | Wednesday, January 31, 2018, 09:50: A wire
(B - F) was too close (Almost touching) to
the EZL and had visible sparks during HV |
|
|
627
|
Wednesday, January 31, 2018, 12:58 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | In progress | HV test 4 | Wednesday, January 31, 2018, 12:53: Power/sources
on.
Wednesday, January 31, 2018, 12:58: |
|
|
671
|
Tuesday, July 03, 2018, 12:46 |
Aaron Schmidt | Ta#56 | HP-SIS | ITE | TM4 | 42218-9 | 42752-3 | In progress | Conditioning Ta#56 | Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo
pumps started. |
8x |
|
651
|
Wednesday, March 21, 2018, 14:11 |
Fernando Maldonado | | LP-FEBIAD | | | 395530-3 | 42752-2 | In progress | Test FEBIAD | Tests on coil, temperature and the use
of silver bolts.
(3) Vented silver bolts on the TBHT |
10x |
|
758
|
Monday, September 23, 2019, 13:30 |
Aaron Schmidt | Ta#59 | LP-SIS | ITE | TM2 | 44062-5 | 42752-10 | In progress | Conditioning Ta#59 Assy | Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38:
Closed BV1A / Opened BV1 A & B to open |
9x |
|
762
|
Friday, October 18, 2019, 15:01 |
Aaron Schmidt | SiC#38 | HP-FEBIAD | ITE | TM2 | 42464-4 | 42752-1 | In progress | Conditioning SiC#38 HP-FEBIAD | Friday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30:
Turbo pumps on. |
12x |
|
595
|
Thursday, July 06, 2017, 13:16 |
Aaron Schmidt | Ta#55 | LP-SIS | | | 42218-11 | 42738-2 | In progress | Conditioning Ta spare for Ta#52 | Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo
pumps started. |
10x |
|
602
|
Tuesday, August 15, 2017, 08:41 |
Aaron Schmidt | Ta#55 | LP-SIS | | | 42218-11 | 42738-2 | In progress | TBHT sight in test | Heat TGHT to 580 A & TGHT to
200 A for view port test.
Tuesday, August 15, 2017, 08:40: |
|
|
649
|
Friday, March 16, 2018, 08:15 |
Aaron Schmidt | Nb#8 | HP-SIS | ITW | TM2 | 38817-2 | 42738-12 | In progress | Conditioning Nb#08 | Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo
pumps started. |
6x |
|
597
|
Monday, July 17, 2017, 09:55 |
Aaron Schmidt | | | | | 41882-4 | 42738-1 | In progress | Out Gas HS for Target Cleaning Test | -No EE. Insulators, gripper arms,
and blank EE plate included |
|
|
598
|
Monday, July 17, 2017, 09:58 |
Aaron Schmidt | | HP-SIS | | | 42218-8 | 42738-1 | | Target cleaning test (Long) HP-SIS CC Clean | |
|
|
599
|
Monday, July 17, 2017, 10:04 |
Aaron Schmidt | | HP-SIS | | | 42218-10 | 42738-1 | | Target cleaning test HP-SIS Full Clean | |
|
|
901
|
Monday, October 04, 2021, 15:38 |
Aaron Schmidt | | LP-IG-LIS | ITE | TM4 | | 42132-7 | In progress | Conditioning UC#35 IG-LIS HS | Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08:
TP1B on. |
|
|
588
|
Friday, June 02, 2017, 15:57 |
Aaron Schmidt | SiC#36 | HP-FEBIAD-CTL | ITW | TM2 | 41369-10 | 42132-6/9 | | Conditioning SiC#36 | Friday, June 02, 2017, 15:20: Coil loose
(Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing |
9x |
|