Entry  Friday, December 01, 2017, 14:31, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, Silver plated bolts test / Outgas TS 1st_silver_bolts_test.docxTS-2017-12-05-08-10.rga
Chamber 'open state, no turbos' 2 weeks. Testing Silver plated 3/8"-16x1" (SCR, SHC, 18-8, AG) bolt on the TBHT.
Friday, December 01, 2017, 14:26: Roughing. BV1B open.
Friday, December 01, 2017, 14:27: BV1A open
Entry  Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas Empty_Chamber_-_Silver_bolts_removed.docxTS-2017-12-12-09-00.rgaTS-2017-12-13-06-50.rga
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.
Entry  Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down 
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.
Entry  Friday, January 26, 2018, 13:59, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 1 2018_HV_test_1.docx
Friday, January 26, 2018, 14:00: BIAS/EZL/EE ramp up.
Friday, January 26, 2018, 14:06: BIAS/EZL/EE @ 30/13/1.5 kV.
Friday, January 26, 2018, 14:09: BIAS/EZL/EE @ 35/13/1.5 kV.
Entry  Monday, January 29, 2018, 10:07, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Power outage / HV test 2 2018_HV_test_2.docx
HV test 2 cancelled.  9:38: BIAS/EZL/EE @ 30/13/1.5 kV
Monday, January 29, 2018, 09:40 (Roughly) Power went out completely
Monday, January 29, 2018, 10:00: Power up TS
Entry  Tuesday, January 30, 2018, 06:51, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, HV test 3 2018_HV_test_3.docx
Tuesday, January 30, 2018, 06:50: BIAS / EZL / EE @ 30 / 13 / 1.5
Tuesday, January 30, 2018, 06:52: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 30, 2018, 06:58: Optics on / set
Entry  Wednesday, January 31, 2018, 09:53, Aaron Schmidt, , , , , (Blank), 42752-3, Done, Wire moved. 
Wednesday, January 31, 2018, 09:50: A wire (B - F) was too close (Almost touching) to the EZL and had visible sparks during HV tests 1 & 2. The wire
was adjusted to sit higher. and away from the EZL
Entry  Wednesday, January 31, 2018, 12:58, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, In progress, HV test 4 2018_HV_test_4.docx
Wednesday, January 31, 2018, 12:53: Power/sources on.
Wednesday, January 31, 2018, 12:58: BIAS / EZL / EE @ 40 / 17 / 2
Wednesday, January 31, 2018, 13:02: BIAS / EZL / EE @ 40 / 17 / 2
Entry  Tuesday, July 03, 2018, 12:46, Aaron Schmidt, Ta#56, HP-SIS, ITE, TM4, 42218-9, 42752-3, In progress, Conditioning Ta#56 8x
Tuesday, July 03, 2018, 12:44: Roughing
Tuesday, July 03, 2018, 13:32: Turbo pumps started.
Tuesday, July 03, 2018, 13:38: Ion gauge on.
Entry  Wednesday, March 21, 2018, 14:11, Fernando Maldonado, , LP-FEBIAD, , , 395530-3, 42752-2, In progress, Test FEBIAD  10x
Tests on coil, temperature and the use of silver bolts.
(3) Vented silver bolts on the TBHT and (2) Full silver bolts on the coil
Wednesday, March 21, 2018, 14:10: Roughing.
Entry  Monday, September 23, 2019, 13:30, Aaron Schmidt, Ta#59, LP-SIS, ITE, TM2, 44062-5, 42752-10, In progress, Conditioning Ta#59 Assy 9x
Monday, September 23, 2019, 13:28: Roughing.
Monday, September 23, 2019, 13:38: Closed BV1A / Opened BV1 A & B to open both @ 35.0 T.
Monday, September 23, 2019, 14:20: Turbo pumps started.
Entry  Friday, October 18, 2019, 15:01, Aaron Schmidt, SiC#38, HP-FEBIAD, ITE, TM2, 42464-4, 42752-1, In progress, Conditioning SiC#38 HP-FEBIAD 12x
Friday, October 18, 2019, 14:58: Roughing.
Friday, October 18, 2019, 15:30: Turbo pumps on.
Friday, October 18, 2019, 15:35: Ion gauge on.
Entry  Thursday, July 06, 2017, 13:16, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, Conditioning Ta spare for Ta#52 10x
Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo  pumps started.
Thursday, July 06, 2017, 14:30: Ion gauge on. RGA Started
Entry  Tuesday, August 15, 2017, 08:41, Aaron Schmidt, Ta#55, LP-SIS, , , 42218-11, 42738-2, In progress, TBHT sight in test 
Heat TGHT to 580 A & TGHT to  200 A for view port test.
Tuesday, August 15, 2017, 08:40: Roughing.
Tuesday, August 15, 2017, 08:59: Both Turbo pumps started.
Entry  Friday, March 16, 2018, 08:15, Aaron Schmidt, Nb#8, HP-SIS, ITW, TM2, 38817-2, 42738-12, In progress, Conditioning Nb#08 6x
Friday, March 16, 2018, 08:42: Roughing.
Friday, March 16, 2018, 10:34: Turbo pumps started.
Friday, March 16, 2018, 10:40: Ion gauge on.
Entry  Monday, July 17, 2017, 09:55, Aaron Schmidt, , , , , 41882-4, 42738-1, In progress, Out Gas HS for Target Cleaning Test OMEGA_OM-DAQPRO-5300_24-Jul-17_10.23.02.dlpTarget_Cleaning_Test_HS_Outgassing.docxTS-2017-07-17-11-17.rga
-No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Entry  Monday, July 17, 2017, 09:58, Aaron Schmidt, , HP-SIS, , , 42218-8, 42738-1, , Target cleaning test (Long) HP-SIS CC Clean  HP-SIS_CC_Clean_(Long).docxOMEGA_OM-DAQPRO-5300_27-Jul-17_10.25.04.dlpTS-2017-07-24-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Monday, July 17, 2017, 10:04, Aaron Schmidt, , HP-SIS, , , 42218-10, 42738-1, , Target cleaning test HP-SIS Full Clean  HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga
 Target
Test (Fully Cleaned vs Crystal Clean only).
Entry  Monday, October 04, 2021, 15:38, Aaron Schmidt, , LP-IG-LIS, ITE, TM4, , 42132-7, In progress, Conditioning UC#35 IG-LIS HS UC#35.docx
Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08: TP1B on. 
Monday, October 04, 2021, 16:15: TP1 A on. 
Entry  Friday, June 02, 2017, 15:57, Aaron Schmidt, SiC#36, HP-FEBIAD-CTL, ITW, TM2, 41369-10, 42132-6/9, , Conditioning SiC#36 9x
Friday, June 02, 2017, 15:20: Coil loose (Remove lid, Tighten and place lid again)
Friday, June 02, 2017, 15:52: Roughing
Friday, June 02, 2017, 16:13: Turbo pumps on.