Wednesday, October 20, 2021, 15:01, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 20, 2021, 15:01: Roughing. |
Thursday, October 14, 2021, 10:13, Aaron Schmidt, , LP-SIS, ITW, TM2, , 44378-22, In progress, Conditioning UC#36 HS
|
Tube / TGHT only.
Thursday, October 14, 2021, 10:11: Roughing.
Thursday, October 14, 2021, 12:05: TP1B on. |
Wednesday, October 06, 2021, 11:56, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Wednesday, October 06, 2021, 11:56: Roughing.
Thursday, October 14, 2021, 09:07: Venting. |
Monday, October 04, 2021, 15:38, Aaron Schmidt, , LP-IG-LIS, ITE, TM4, , 42132-7, In progress, Conditioning UC#35 IG-LIS HS
|
Monday, October 04, 2021, 15:38: Roughing.
Monday, October 04, 2021, 16:08: TP1B on.
Monday, October 04, 2021, 16:15: TP1 A on. |
Thursday, September 23, 2021, 07:16, Aaron Schmidt, , , , , , , , Pump down empty chamber & reboot
|
Thursday, September 23, 2021, 07:15: Roughing. Waterline loop installed.
Monday, September 27, 2021, 10:35: MB1 off. Turbo pumps, IG, RP, all off/closed. DI water closed/purged.
TS shutdown for planned power outage. |
Tuesday, September 14, 2021, 17:12, Aaron Schmidt, C#3, LP-SIS, ITW, TM2, 44691-7, 44378-11, In progress, C#3 Conditioning 6x
|
Tuesday, September 14, 2021, 17:00: Roughing
Tuesday, September 14, 2021, 17:37: TP1B on.
Tuesday, September 14, 2021, 17:47: TP1A on. |
Tuesday, September 07, 2021, 16:04, Alexander Shkuratoff, , , , , , , Done, Replaced flange on F/T R with blank flange
|
Feedthrough R had a flange installed with a HV feedthrough on it for TM3 service tray prototype HV tests. It was replaced today with the original blank
flange. |
Tuesday, August 31, 2021, 13:55, Aaron Schmidt, , , , , , , , Pump down chamber
|
Pump down chamber w/ empty HS |
Wednesday, August 25, 2021, 15:30, Ferran Boix Pamies, , , , , , , , Thermocouple high voltage test
|
Wednesday, August 25, 2021, 15:29: Roughing.
Thursday, August 26, 2021, 04:11: IG1 switched on. Vacuum @ 8.35e-06T - AS
Thursday, August 26, 2021, 14:04 Water on, no spike in vacuum. IG1:2.6e-6T |
Monday, August 23, 2021, 10:49, Aaron Schmidt - Fernando Maldonado, , , , , , , Problems/Solutions, RGA replaced with a blind flange
|
Monday, August 23, 2021, 10:49: Aaron removed the Extorr RGA and install a blind instead.
When the new RGA arrives it will be changed. |
Monday, August 23, 2021, 09:55, Fernando Maldonado, , , , , , , Problems/Solutions, RP1 changed back
|
Monday, August 23, 2021, 09:53: RP1 was swapped back to our original pump. (see e-log
889)
Derek informed that they test it overnight and performed well, and it's a bit slow but it goes down to 20 mT. |
Saturday, August 07, 2021, 18:07, Fernando Maldonado, , , , , , , Problems/Solutions, FC0 lasrge oscillation and RMPs offset. Both started today. [Got solved by itself]
|
Saturday, August 07, 2021, 18:02: As mentions in previous entries, the FC0 current oscillates with no change on ion source parameters.
Hence, I came on-site to see if there was an issue with the hardware. Nothing obvious.
Last night there were some sparks that might have cause some issue. |
Thursday, August 05, 2021, 08:49, Fernando Maldonado, , , , , , , Problems/Solutions, CANBUS snooper set up to investigate random optics turnining off
|
Problem: Some devices turn off unexpectedly and sometimes without any obvious trigger. In the past, the only time this was an issue
was during mass scans. Now with the automation of measurements, this is a major problem as it prevents longer parameter scans.
Thursday, August 05, 2021, 08:00: Kevin setup the CANBUS snooper by hooking it up on the magnet card loop port. |
Tuesday, August 03, 2021, 11:55, Fernando Maldonado, , , , , , , Problems/Solutions, Swapped emmittance meter voltage cables.
|
After not being able to get beam through the emittance meter. I diagnosed that the plates was not biased (reason yet unknow).
I swapped the cables from the plates such that it looks like the picture below. With this, I was able to take an emittance scan with the previous
parameters. |
Friday, July 30, 2021, 16:28, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Done, FEBIAD parameter scan - efficiency measurements
|
Restarting everything after swapping RP1 (see elog 889).
Friday, July 30, 2021, 16:14: IG1 @ 7.02e-7 T. |
Friday, July 30, 2021, 15:34, Carla Babcock, , , , , , , Failed, TSG:RP1 failure
|
TP1A tripped off on Fernando, seems the backing pressure got too high. Even with PV1 closed the RP1 pump could not get below 200mTorr. Derek from vacuum
group came and had a look, and is swapping RP1 out for one of the vacuum group pumps, then will see if they can repair ours. |
Wednesday, July 28, 2021, 08:48, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Modified spiral tube from VCR to counteract torque towards the HS. Now points towards TBHT.
Electric checks before closing shows no short between TIS and HS. |
Tuesday, July 27, 2021, 12:57, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD parameter scan - efficiency measurements
|
Assembly has new gas tube to the target for better fit and clearance to the HS.
Electric checks before closing shows no short between TIS and HS.
Tuesday, July 27, 2021, 12:57: Venting |
Monday, July 26, 2021, 17:35, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements.
|
Monday, July 26, 2021, 17:23: Roughing
Monday, July 26, 2021, 17:55: Turbos on.
Monday, July 26, 2021, 18:03 : TP1A timed out ...again |
Thursday, July 22, 2021, 17:43, Fernando Maldonado, , LP-FEBIAD, , , 41790-10, 44378-5, Failed, FEBIAD efficiency measurements
|
Thursday, July 22, 2021, 17:43: Roughing
New argon gas bottle installed.
Thursday, July 22, 2021, 18:16: Turbos on. |
|