Friday, September 27, 2013, 11:41, Anders Mjos, Ta#41, HP-SIS, ITW, TM4, 39069-5, 38817-10, Done, Ta#41 Conditioning
|
Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Friday, September 27, 2013, 12:18: Vacuum at 1.5E-5 T
Monday, September 30, 2013, 08:41: Opened water supply. Vacuum stable at 1.5E-7 T
TGHT Q=5.5 T=28.0
TBHT Q=5.8 T=28.0
Monday, September 30, 2013, 15:19: Flow sensor moved from TBHT to HS
TGHT Q=5.5 T=27.9
HS Q=3.6 T=27.8
Tuesday, October 01, 2013, 12:08: Taget Biased to 30kV.
Wednesday, October 02, 2013, 08:50: Started autoramping to 580A/230A
Wednesday, October 02, 2013, 08:50: Opened IV4
Wednesday, October 02, 2013, 10:51 TGHT/TBHT 250A / 239A
TGHT Q=5.5 T=28.5
HS Q=3.6 T=29.2
SUPPLY (ext) 27.3
RETURN (ext) 27.8
Wednesday, October 02, 2013, 13:28 TGHT/TBHT 250A / 570A
TGHT Q=5.5 T=30.4
HS Q=3.6 T=33.4
SUPPLY (ext) 27.4
RETURN (ext) 29.3
Wednesday, October 02, 2013, 13:30: TBHT was starting to limit on voltage. Increased voltage limit to 2.4V.
Thursday, October 03, 2013, 08:21: TMS:TP2 timed out over night.
Magnet PS breaker tripped during a mass scan yesterday. Reset breaker and cleared interlocks.
TGHT Q=5.5 T=30.4
HS Q=3.6 T=34.0
SUPPLY (ext) 27.3
RETURN (ext) 29.3
Thursday, October 03, 2013, 08:28: Started mass scan 200 -> 0 m/q. FC0 7.5E-8 A
Thursday, October 03, 2013, 14:29
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.4
RETURN (ext) 29.6
Thursday, October 03, 2013, 15:14: Lowered TBHT:RDCUR to 230A.
Thursday, October 03, 2013, 15:37: Increased EE to -2000 V
Thursday, October 03, 2013, 16:22
TGHT Q=5.5 T=30.6
HS Q=3.6 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.6
Friday, October 04, 2013, 08:08
TGHT Q=5.5 T=30.6
HS Q=3.5 T=33.9
SUPPLY (ext) 27.5
RETURN (ext) 29.3
Mass scan started.
Friday, October 04, 2013, 08:46: Cool down started.
Friday, October 04, 2013, 13:35: TPS:IV4 closed
Friday, October 04, 2013, 13:41: Source debiased.
Tuesday, October 15, 2013, 09:56: Turbos stopped. Vacuum at 1.15 E-7 T
Tuesday, October 15, 2013, 12:44: Venting
After the conditioning, some oxidation (?) from the standards (?) were found on the Plasma Electrode and around the Target Tube. See attachment |
Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40
|
Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
Wednesday, April 10, 2013, 13:37: Roughing
Wednesday, April 10, 2013, 13:58: Started turbos
Wednesday, April 10, 2013, 14:07: Turbos at speed
Wednesday, April 10, 2013, 14:08: Vacuum at 9.2E-6 Torr
Thursday, April 11, 2013, 08:26: Opened cooling water. Vacuum stable at 2.2E-7 Torr
Monday, April 15, 2013, 08:40: HV conditioned to 30kV TSG:BIAS:RDCUR at 37 uA
Monday, April 15, 2013, 08:46: Started Target Heat Ramp 580A / 230A
Monday, April 15, 2013, 13:30: Target at temperature TGHT:RDCUR=574A, TBHT:RDCUR=230A
Monday, April 15, 2013, 15:10: Mass scan
Monday, April 15, 2013, 16:21: Target will be left at temperature overnight.
Tuesday, April 16, 2013, 08:40: Mass scan
Tuesday, April 16, 2013, 13:08: Started Target Cooling Sequence
Wednesday, April 17, 2013, 08:43: High voltage BIAS to zero
Wednesday, April 17, 2013, 08:47: Turbos off
Wednesday, April 17, 2013, 16:20: Target will likely be removed tomorrow Thursday.
Thursday, April 18, 2013, 11:13 : Venting
Thursday, April 18, 2013, 11:17: Water lines purged
Thursday, April 18, 2013, 11:29: Chamber vented. Target Removed |
Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum
|
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Thursday, April 18, 2013, 14:20 : Turbos at speed
Thursday, April 18, 2013, 14:21 : Vacuum at 2.3E-5 T
Friday, April 19, 2013, 08:23: Opened cooling water. Vacuum stable at 9.6E-6 T
Vacuum is somewhat higher than expected (5.2E-7 T) . Will went and clean the o-rings on the doors.
Monday, April 22, 2013, 09:32: Turbos off.
Monday, April 22, 2013, 10:57: Venting
Monday, April 22, 2013, 12:25: Vented
Monday, April 22, 2013, 14:09: Roughing
Monday, April 22, 2013, 14:31: Started Turbos
Monday, April 22, 2013, 14:40: Turbos at speed
Monday, April 22, 2013, 14:41: Vacuum at 1.8E-5 T
Tuesday, April 23, 2013, 09:52 : Vacuum at 2.6E-7 T - already an improvement from yesterday
Thursday, April 25, 2013, 08:47: Stopped turbos. A test target with at new FEBIAD coil will be tested.
Thursday, April 25, 2013, 13:27: Venting |
Monday, March 25, 2013, 11:39, Anders Mjos, Ta#39, LP-SIS, ITW, TM1, , , Done, Ta#39 commissioning
|
Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Monday, March 25, 2013, 12:02: Both turbos at speed
Monday, March 25, 2013, 12:04: Vacuum at 2E-5 Torr
Tuesday, March 26, 2013, 08:03: Opened water supply. Vacuum stable at 3E-7 Torr
Tuesday, March 26, 2013, 09:11
All P/S switched on.
ISAC Ops will condition this target as a training exercise.
ISAC ops e-log
ISAC ops e-log 2
Wednesday, March 27, 2013, 13:41: ISAC ops called to inform that the target has been cooled down and bias is off.
Thursday, March 28, 2013, 08:22: Closed TPS:IV4 and switched off turbos.
Thursday, March 28, 2013, 13:27: Venting
Thursday, March 28, 2013, 13:33: Water purged |
Thursday, May 31, 2012, 15:43, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , In progress, Target ready to be heated
|
Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
Friday, June 01, 2012, 08:08: Cooling water opened. Vacuum stable at 5.7E-7. Target ready to be heated and biased. |
Friday, June 01, 2012, 12:23, Aurelia Laxdal, Ta#38, LP-SIS, ITW, TM1, , , In progress, HV & Heaters conditioning.
|
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down. |
Monday, June 04, 2012, 10:51, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , Done, Venting chamber
|
Aurelia Laxdal wrote: |
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
Tried to turn ON/OFF magnet PS and to reboot Canbus, but nothing worked. Still waiting for E-Fault 6031 to be resolved.
Started cool-down.
|
Monday, June 04, 2012, 10:51: Turbos switched off
Monday, June 04, 2012, 11:06: Purging water. Venting.
Monday, June 04, 2012, 11:36: Target removed |
Friday, September 20, 2024, 14:22, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, , Conditioning Ta#
|
https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: Roughing.
Friday, September 20, 2024, 14:39: TP1B on
Friday, September 20, 2024, 14:45: TP1A on.
Friday, September 20, 2024, 14:54: TP1A at speed. IG1 on.
Monday, September 23, 2024, 16:38 Water cooling on. no effect on vacuum pressure. Pressure at 6.0e-7T
Monday, September 23, 2024, 17:00 Ramping TGHT and TBHT to 580/230A at 1A/30s
Tuesday, September 24, 2024, 08:58 TGHT at 502A. Ramping program preventing further ramp up do to 'good vacuum' restriction at 1e-6T as outgassing is pushing up the chamber pressure. Increased good vacuum parameter to 5e-6T, resuming ramp up to 580A at 1A/30s.
Tuesday, September 24, 2024, 11:12: TGHT TBHT at 580/230A. Increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.
Tuesday, September 24, 2024, 14:16: mass scan at high voltage completed - 2024-09-24--14-11 LP-Ta-24C - scan 1
Tuesday, September 24, 2024, 14:17 background signal recording problem persists, despite channel change conducted with controls team and Keiko - will continue to investigate switching to current integrators
Tuesday, September 24, 2024, 14:17 ramping up HV BIAS to 50kV for conditioning, alongside increased EZL voltage
Tuesday, September 24, 2024, 17:00 BIAS was stable at 50kV for 30min. no noticeable sparking.
also noted that the mass scan data was saved incorrectly. however, there are multiple screen captures of the mass scan which clearly detail which peaks are present.
HV elements decreased to zero and target was left hot overnight for outgassing and so beam content can be re-evaluated
Wednesday, September 25, 2024, 10:24 increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.
Wednesday, September 25, 2024, 13:25 two mass scans conducted: 2024-09-25--12-39 LP-Ta-24C - scan 2, 2024-09-25--13-22 LP-Ta-24C - scan 3
Wednesday, September 25, 2024, 13:26 ramping down high voltages. |
Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
|
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Thursday, January 19, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.70e-07T.
Thursday, January 19, 2017, 08:55: Power/Sources on. BIAS/EZL/EE @ 30/15/1.5 kV . Coil @ 50 A . Anode @ 200 V.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.9 |
3.99 |
TBHT |
24.8 |
3.15 |
COIL + EE |
24.7 |
5.16 |
TGHT |
24.7 |
5.05 |
Thursday, January 19, 2017, 08:59: IV4 opened. Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Friday, January 20, 2017, 08:25: TSG : TP1A and TSG : BV1A were noticed to be tripped around 6am.
Friday, January 20, 2017, 08:42: Bypass to restart TSG : TP1A and TSG : BV1A. TP1A is at speed.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.1 |
3.99 |
TBHT |
25.0 |
3.19 |
COIL + EE |
24.7 |
5.19 |
TGHT |
26.5 |
5.05 |
Friday, January 20, 2017, 11:48: Auto ramping TBHT to 320 A @ 2A per min.
Friday, January 20, 2017, 15:51: Coil @ 100A
Saturday, January 21, 2017, 11:00: Increased TB HT voltage limit to 2.75 V. TBHT current went back up from 313 to 319 A. -AM
Monday, January 23, 2017, 10:08: Argon Valve closed.
Monday, January 23, 2017, 10:33: Neon Valve closed.
Monday, January 23, 2017, 11:00: Auto-cooling @ 4A per min. Coil reduced from 100 A to 50 A
Monday, January 23, 2017, 13:32: Power/sources off.
Monday, January 23, 2017, 13:35: RGA off. IV4 closed. Ion gauge off. Turbo pumps off.
Monday, January 23, 2017, 14:45: Venting |
Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks
|
Attached is a recent list of Ta targets with their extracted ions peaks. |
Wednesday, April 25, 2018, 09:50, Aaron Schmidt, Ta (test), LP-SIS, , , 41177-3, , In progress, Ta test and window change
|
Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right door window temperature.
Wednesday, April 25, 2018, 09:47: Roughing both the Evap/box end and beam end.
Wednesday, April 25, 2018, 10:27: All 4 turbo pumps started.
Wednesday, April 25, 2018, 10:49: Both Ion gauges on.
Wednesday, April 25, 2018, 14:56: RGA on.
Thursday, April 26, 2018, 06:54: Water lines opened. No response on RGA. Vacuum stable @ 4.23e-07T
Thursday, April 26, 2018, 06:56: Power/sources on.
Thursday, April 26, 2018, 07:00: Auto ramping TGHT to 300 @ 2A per min.
Thursday, April 26, 2018, 07:05: IV4 opened.
Thursday, April 26, 2018, 08:50: Door temp @ 25 C @ left window.
Thursday, April 26, 2018, 09:30: 300A reached. Door temp @ 26 C @ left window.
Thursday, April 26, 2018, 13:01: 550A Reached. Door temp @ 29 C @ left window.
Monday, April 30, 2018, 07:05: IV4 closed, RGA off.
Monday, April 30, 2018, 07:10: Ion gauge off. Turbo pumps off.
Monday, April 30, 2018, 11:00: Venting. Purging water lines. |
Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning
|
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T
Tuesday, April 07, 2015, 08:25: Pumping on gas lines.
Tuesday, April 07, 2015, 08:37: Finished pumping.
Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber
Tuesday, April 07, 2015, 08:42: RGA filament on.
Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, April 07, 2015, 08:55: COIL to 50 A, ANODE to 200 V
Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min
Tuesday, April 07, 2015, 13:25 : Opened IV4
Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A
Wednesday, April 08, 2015, 09:27: Opening for Ne gas
Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV
Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV
Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV
Thursday, April 09, 2015, 11:19: Starting target cool down
Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV
Thursday, April 09, 2015, 17:58: BIAS and source off.
Friday, April 10, 2015, 08:21: Closed gas supply
Friday, April 10, 2015, 08:23: Stopped turbos |
Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training
|
Anders Mjos wrote: |
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
Thursday, September 20, 2012, 16:29: Starting turbos
Thursday, September 20, 2012, 16:38 : Turbos at speed
Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr
|
Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr. |
Tuesday, May 15, 2012, 07:39, Rick Maharaj, Sic #27, HP-SIS, ITE, TM4, , , In progress, Water on at test stand
|
The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure. |
Wednesday, May 31, 2023, 15:19, Aaron Schmidt, SiC#46, HP-SIS, , , 44692-2, 45235-6, In progress, Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts
|
(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.
Thursday, June 01, 2023, 07:30: TP1B on.
Thursday, June 01, 2023, 07:31: TMS:TP6 & TMS:TP2 on.
Thursday, June 01, 2023, 07:38: IG6 on. TSG:TP1A on.
Thursday, June 01, 2023, 07:48: IG1 on.
Thursday, June 01, 2023, 08:26: Waterline FS#5 on. Vacuum @ 1.40e-06T. Power on.
Thursday, June 01, 2023, 08:28: Sources on. IV4 open.
Thursday, June 01, 2023, 08:31: Optics set.
Thursday, June 01, 2023, 08:33: Quick check: Manually tap up TGHT / TBHT to 5 / 5 A
BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Thursday, June 01, 2023, 08:51: Auto-ramping TGHT / TBHT to 100 / 50 A @ 2 A per min.
Thursday, June 01, 2023, 09:55: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min.
Thursday, June 01, 2023, 11:36: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, June 01, 2023, 13:56: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, June 01, 2023, 14:20: Mass & wire scans.
Friday, June 02, 2023, 07:10: Mass & wires scans complete. Auto-cooling @ 2 A per min
Friday, June 02, 2023, 09:22: BIAS / EE / EZL @ 0 kV.
Thursday, June 08, 2023, 07:51: IV4 closed. Power / Sources off.
Thursday, June 08, 2023, 07:53: IG1 & Turbo pumps off.
Thursday, June 08, 2023, 10:32: Venting. |
Tuesday, May 09, 2023, 10:40, Aaron Schmidt, SiC#45, HP-SIS, ITE, TM4, 44692-3, 45235-8, In progress, Conditioning SiC#45
|
Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B on.
Tuesday, May 09, 2023, 12:38: TP1A on.
Tuesday, May 09, 2023, 12:49: IG1 on.
Wednesday, May 10, 2023, 10:41: Waterline FS#5 opened. Vacuum @6.36e-07T
Wednesday, May 10, 2023, 10:56: IV4 open. Power / sources / optics on.
Wednesday, May 10, 2023, 10:59: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 11:09: BIAS / EE / EZL @ 10 / -1.0 / 5 kV.
Wednesday, May 10, 2023, 11:54: Vacuum climbing quickly @ 4.10e-06T. Halt ramping to stabilize. TGHT / TBHT @ 100 / 50 A.
Wednesday, May 10, 2023, 11:59: Vacuum @ 7.69e-06T & still climbing.
Wednesday, May 10, 2023, 12:05: Levelled off @ 8.91e-06T.
Wednesday, May 10, 2023, 13:16: Vacuum @ 2.04e-06T. Auto-ramping TGHT / TBHT to 200 / 100 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 13:34: Abort ramping.
Wednesday, May 10, 2023, 13:52: Vacuum @ 4.35e-06T. Restart auto-ramping TGHT / TBHT to 200 / 100 A @ 1 A per minute.
Wednesday, May 10, 2023, 15:43: Vacuum @ 1.05e-06T. Auto-ramping TGHT / TBHT to 300 / 150 A @ 1 A per minute.
Wednesday, May 10, 2023, 16:36: Vacuum @ 8.23e-07T. TGHT / TBHT @ 250 A / 150 A. Auto-ramping TGHT / TBHT to 450 / 250 A @ 2 / 1 A per minute.
Wednesday, May 10, 2023, 20:52: Vacuum @ 5.01e-06T. TGHT / TBHT Slowly ramping due to vacuum limit being reached.
Thursday, May 11, 2023, 05:42: TBHT reduced @ 230 A. Auto-ramping TGHT to 580 A @ 2 A per min
Thursday, May 11, 2023, 05:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, May 11, 2023, 09:30: Mass & wire scans complete.
Friday, May 12, 2023, 07:21: Auto-cooling @ 1 A per min.
Friday, May 12, 2023, 11:54: HV to 0 kV.
Tuesday, May 16, 2023, 11:03: IV4 closed. Power / Sources off. Locked out.
Tuesday, May 16, 2023, 11:04: IG1 & IG6 off. All turbo pumps off.
Tuesday, May 16, 2023, 12:19: Venting.
|
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on
Thursday, June 23, 2022, 11:41: TP1A on.
Thursday, June 23, 2022, 11:49: IG1 on.
Thursday, June 23, 2022, 12:25: Gases on.
Thursday, June 23, 2022, 12:30: Power on. Cage locked up
Thursday, June 23, 2022, 14:14: Vacuum @ 3.23e-06T.
Thursday, June 23, 2022, 14:15: Waterlines opened. Vacuum stable.
Thursday, June 23, 2022, 14:16: IV4 opened.
Thursday, June 23, 2022, 14:17: Sources on.
Thursday, June 23, 2022, 14:18: Optics set. FM tune.
Thursday, June 23, 2022, 14:21: Electrical check OK. Will leave as is. Remote operation ready.
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Thursday, June 23, 2022, 14:22: Reset Kepco (E-rig) PS.
Friday, June 24, 2022, 09:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 24, 2022, 09:17: BIAS / EE / EZL @ 20 / -1.5 / 10 kV.
Friday, June 24, 2022, 13:18: Ramping ongoing. TGHT / TBHT @ 510 / 290 A. Vacuum @ 3.65e-06T
Friday, June 24, 2022, 19:19: FM Tune on optics / Sources. Vacuum @ 1.60e-06T. BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Friday, June 24, 2022, 19:42: Coil to 15 A. Anode to 200 V.
Friday, June 24, 2022, 20:00: Mass scans complete.
Friday, June 24, 2022, 20:01: BIAS / EZL reduced to 20 / 10 kV.
Friday, June 24, 2022, 20:02: Anode @ 100 V.
Monday, June 27, 2022, 09:34: BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Monday, June 27, 2022, 09:36: Anode @ 200 V. Coil @ 40 A. Vacuum @ 9.99e-07T
Monday, June 27, 2022, 10:09: Last scans complete. Auto-cooling @ 2 A per min.
Monday, June 27, 2022, 10:19: Anode, coil, & HV to 0.
Monday, June 27, 2022, 10:20: IV4 & SV5 Closed.
Wednesday, June 29, 2022, 10:57: Sources & IG1 off. Turbo pumps off
Wednesday, June 29, 2022, 12:25: Venting. |
Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43
|
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.
Saturday, June 18, 2022, 10:41: TP1B on.
Saturday, June 18, 2022, 10:48: TP1A on.
Saturday, June 18, 2022, 10:55: IG1 on.
Saturday, June 18, 2022, 11:13: Gases on. Cage closed up. SV5 remains on. SV4 (Argon tank) Closed.
Saturday, June 18, 2022, 11:14: Vacuum @ 2.49e-05T.
Saturday, June 18, 2022, 11:15: Waterline FS#5 opened.
Saturday, June 18, 2022, 11:22: Electrical check w/ IG1 bypass
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Saturday, June 18, 2022, 11:23: All checks clear. Bypass removed. Ready for remote operation. Vacuum @ 2.14e-05T
Saturday, June 18, 2022, 21:34: Sources on. Vacuum @ 3.38e-06T. IV4 open.
Saturday, June 18, 2022, 21:36: Optics on. Standard tune.
Saturday, June 18, 2022, 22:24: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min to out gas overnight.
Saturday, June 18, 2022, 22:55: BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V. Coil @ 10 A. Low settings left as a general electrical check to run as the target heats up.
Sunday, June 19, 2022, 16:37: Vacuum @ 1.60e-06T.
Sunday, June 19, 2022, 16:40: Open SV4 (Argon gas - W/ quick steps on procedure). Vacuum ok.
Sunday, June 19, 2022, 16:42: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Sunday, June 19, 2022, 19:48: BIAS / EE / EZL / Anode @ 0. Coil to 0.
Sunday, June 19, 2022, 19:59: Anode tapped up manually to 400 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Anode tapped up manually to 0 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Coil tapped up manually to 100 A @ approx 1 A per second.
Sunday, June 19, 2022, 20:15: Full Trip. Vacuum limit passed. TGHT / TBHT Went to 0 A
Sunday, June 19, 2022, 20:17: TGHT / TBHT @ 580 / 290 A.
Sunday, June 19, 2022, 20:31: Stable. Vacuum @ 4.21e-06T.
Sunday, June 19, 2022, 20:58: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.
Sunday, June 19, 2022, 21:00: Coil @ 10 A. Vacuum @ 3.49e-06T.
Sunday, June 19, 2022, 21:07: Begin mass & wire scans.
Sunday, June 19, 2022, 21:39: Scans complete.
Monday, June 20, 2022, 05:58: Further mass, wire, & emittance scans.
Monday, June 20, 2022, 06:29: Coil @ 40 A, Anode @ 300 V. Optics set to FM tune.
Monday, June 20, 2022, 06:59: Scans complete. Auto-cooling @ 3 A per min.
Monday, June 20, 2022, 07:03: Coil & Anode to 0 A / 0 V.
Monday, June 20, 2022, 07:07: BIAS / EE / EZL @ 0 kV.
Monday, June 20, 2022, 10:12: IV4 closed.
Monday, June 20, 2022, 10:13: Gases closed. IG1 off. Turbo pumps off.
Monday, June 20, 2022, 11:09: Venting. |
Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42
|
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.
Wednesday, May 25, 2022, 16:46: IG1 on.
Thursday, May 26, 2022, 09:20: FS#5 Waterline opened. Vacuum ok @ 5.27e-06T.
HV preset: BIAS / EE / EZL @ 30 / -1.0 / 15 kV
Friday, May 27, 2022, 05:11: Coil to 40 A. Anode t0 300 V.
Friday, May 27, 2022, 05:16: TGHT on. Auto-ramping TGHT / TBHT to 580 / 290 @ 2 A per min.
Friday, May 27, 2022, 07:14: Optics set & IV4 opened. TGHT / TBHT @ 242 A (Ramping ongoing)
FM
Friday, May 27, 2022, 17:17 : IG1 @ 5.19e-6 T. TBHT @ 290 A. TGHT @ 540 A since 16:27.
Friday, May 27, 2022, 17:18: The assembly has been outgassing and the good vacuum limit was reached, preventing reaching the operational point.
Friday, May 27, 2022, 17:19: Auto-ramp up aborted. We'll heat up again Monday morning.
Friday, May 27, 2022, 17:20: Auto-cooling to 0 A @ 2A/min
Sunday, May 29, 2022, 21:35: Auto-ramping TGHT/ TBHT to 350 / 150 A @ 2 A per min - AS.
Sunday, May 29, 2022, 21:40: Vacuum @ 1.43e-06T.
Monday, May 30, 2022, 04:53: Vacuum @ 1.49e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min - AS
Monday, May 30, 2022, 08:06: Initial wire & mass scans ok. Increase EE to -1.5 kV.
Monday, May 30, 2022, 08:30: EE back to -1.0 kV.
Monday, May 30, 2022, 10:31: BIAS / EE / EZL / Anode @ 0 kV. Lock over. Open back/top cage.
FM
Monday, May 30, 2022, 11:21: Mass set to 40Ar+. The gas on/off now shows an effect on the signal
Monday, May 30, 2022, 11:24: Running a small scan to test the web-app
Monday, May 30, 2022, 14:00: Spark towards TBHT, TPS:Q1 charged up.
Monday, May 30, 2022, 14:30: Spark to anode.
Monday, May 30, 2022, 16:16: Issue preventing FEBIAD-scan solve.
Monday, May 30, 2022, 16:16 : FEBIAD scan on 40Ar+.
Monday, May 30, 2022, 17:00: TMS :VCB1 died in the middle of the scan. Scan aborted save id 1085. Starting a new scan
Monday, May 30, 2022, 18:24: measured_id = 1086
Moving to H2O
Monday, May 30, 2022, 18:30: Scan started for H2O.
Monday, May 30, 2022, 19:53: Scan finished. measure_id = 1087
Monday, May 30, 2022, 19:58: Gas off. Scan for H2O ready to go.
Monday, May 30, 2022, 19:59: Scan started
Monday, May 30, 2022, 21:21: Scan finished. measured_id = 1089
Monday, May 30, 2022, 21:32: Auto-cooling to 0 A @ 2A/min
AS
Tuesday, May 31, 2022, 05:10: All HV & Sources off.
Tuesday, May 31, 2022, 05:11: IV4 closed. IG1 & turbo pumps off.
Tuesday, May 31, 2022, 07:02: IV4 reset. Venting.
Tuesday, May 31, 2022, 07:08: FS#5 purged. Power locked up. |
|