Entry  Friday, September 27, 2013, 11:41, Anders Mjos, Ta#41, HP-SIS, ITW, TM4, 39069-5, 38817-10, Done, Ta#41 Conditioning Ta#41_EE_After_Test_Stand.pdf
Friday, September 27, 2013, 11:41: Roughing
Friday, September 27, 2013, 12:08: Turbos started
Friday, September 27, 2013, 12:16: Turbos at speed.
Entry  Wednesday, April 10, 2013, 12:14, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Conditioning Ta#40 
 Wednesday, April 10, 2013, 12:13: Stopped turbos in preparation for venting the chamber.
Wednesday, April 10, 2013, 13:05: Venting
Wednesday, April 10, 2013, 13:37: Ta#40 installed with 130 in lbs torque on all bolts.
    Reply  Thursday, April 18, 2013, 13:50, Anders Mjos, Ta#40, HP-SIS, ITE, TM4, 38295-4, , Done, Ta#40 stored under vacuum 
Target installed at the Test Stand after an inspection in the lab. EE was cleand. All bolts torqued to 130 in lbs
Thursday, April 18, 2013, 13:48: Rouging
Thursday, April 18, 2013, 14:11: Starting turbos
Entry  Monday, March 25, 2013, 11:39, Anders Mjos, Ta#39, LP-SIS, ITW, TM1, , , Done, Ta#39 commissioning 
Target installed with 130 in lbs torque on all bolts.
Monday, March 25, 2013, 11:36: Roughing
Monday, March 25, 2013, 11:54: Starting turbos
Entry  Thursday, May 31, 2012, 15:43, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , In progress, Target ready to be heated 
Thursday, May 31, 2012, 15:42: Roughing
Thursday, May 31, 2012, 16:01 : Starting turbos
Thursday, May 31, 2012, 16:08 : Turbos at speed. Vacuum 1.7 E-5
Entry  Friday, June 01, 2012, 12:23, Aurelia Laxdal, Ta#38, LP-SIS, ITW, TM1, , , In progress, HV & Heaters conditioning. 
Did the HV conditioning.
Heaters conditioning in progress.
The Hall probe is not working: couldn't pass 35.5 units (readback) or 50.16 units (setpoint) at field -3710G.
    Reply  Monday, June 04, 2012, 10:51, Anders Mjos, Ta#38, LP-SIS, ITW, TM1, , , Done, Venting chamber 


    
        
            Aurelia Laxdal wrote:
        
        
            
            Did the HV conditioning.
Entry  Friday, September 20, 2024, 14:22, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, , Conditioning Ta# 
 https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: Roughing.
Entry  Wednesday, January 18, 2017, 09:23, Aaron Schmidt, Ta Test, LP-FEBIAD, , , 39530-3, , In progress, Tri-Coil FEBIAD for testing 12x
Wednesday, January 18, 2017, 09:22: Roughing
Wednesday, January 18, 2017, 09:41: Turbo pumps started.
Wednesday, January 18, 2017, 11:01: Ion gauge on.
Entry  Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks Magnet_peaks.xlsx
Attached is a recent list of Ta targets with their extracted ions peaks.
Entry  Wednesday, April 25, 2018, 09:50, Aaron Schmidt, Ta (test), LP-SIS, , , 41177-3, , In progress, Ta test and window change TS-2018-04-25-14-55.rgaTa_target_heating_test_-_Test_stand.docx
Window changed on view port. Ta target prepared for Aurelia's tests.
***Note*** No Ta window foils on the end plates. Initial ramping to on the TGHT to 300 A. Follow up in increments of 50 A and check the right
door window temperature.
Entry  Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning TM2_FEBIAD_Test_Target.docxER_Scans.zip
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Entry  Thursday, September 20, 2012, 15:52, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 
Thursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.
Thursday, September 20, 2012, 16:09: Roughing
    Reply  Friday, September 21, 2012, 08:20, Anders Mjos, TEST SiC, HP-FEBIAD, , , , , In progress, Installilng SiC-HP-FEBIAD target for operator training 


    
        
            Anders Mjos wrote:
        
        
            
            Thursday, September 20, 2012, 15:50: Roughing
Entry  Tuesday, May 15, 2012, 07:39, Rick Maharaj, Sic #27, HP-SIS, ITE, TM4, , , In progress, Water on at test stand 
The vacuum on TSGIG1 reads 2.85e-07. Turing on water on teststand and observing any changes in vacuum pressure.
Entry  Wednesday, May 31, 2023, 15:19, Aaron Schmidt, SiC#46, HP-SIS, , , 44692-2, 45235-6, In progress, Conditioning SiC#2023A (Spare, renamed SiC-23B) - No salts SiC#2023A_-_No_Salts.docx
(Spare HP-SIS SiC SiC-23B)
Wednesday, May 31, 2023, 15:18: Roughing.

Thursday, June 01, 2023, 07:30: TP1B on.  
Entry  Tuesday, May 09, 2023, 10:40, Aaron Schmidt, SiC#45, HP-SIS, ITE, TM4, 44692-3, 45235-8, In progress, Conditioning SiC#45 SiC#45_Conditioning..docx
Tuesday, May 09, 2023, 10:28: Roughing.
Tuesday, May 09, 2023, 11:25: TP1B on. 
Tuesday, May 09, 2023, 12:38: TP1A on.
Entry  Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44 SiC#44_-_R.docxER-580-290-30kV-m28.txtSiC#44.docx
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on
Entry  Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43 SiC#43_Conditioning_-_R.docxER-580-290-30kV-m27.txtSiC#43.docx
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.
Entry  Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42 ER-580-290-30kV-m28.txtSiC#42.docxSiC#42_Conditioning_-_R.docx
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.
ELOG V2.9.2-2455