Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 6 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  944   Tuesday, November 15, 2022, 11:24 Aaron SchmidtUC#41 assemblyLP-SISITETM445220-845235-4In progressConditioning UC#41 assembly LP-SIS 45220-8 is empty & for
testing only.
Tuesday, November 15, 2022, 11:00:
 UC#41_assembly_conditioning.docx 
  943   Wednesday, October 19, 2022, 12:16 Aaron Schmidt       Test Stand controls changedgenepicsas.triumf.ca
x11 enabled.
Then use login credentials.
  
  942   Tuesday, October 18, 2022, 13:25 Aaron SchmidtC#5LP-SIS  45235-544691-13In progressConditioning C#5Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28:
BV1A open
 C#5_-_Conditioning_start_-_HV.docx 
  941   Thursday, September 29, 2022, 13:50 Aaron Schmidt      In progressPump down empty chamberWater loop installed.
Thursday, September 29, 2022, 13:50:
Roughing
  
  940   Tuesday, September 27, 2022, 07:55 Aaron SchmidtC#4LP-SISITETM444691-344378-23In progressConditioning C#4 w/ thermocouplesThermocouples attached on 5 X 5 multi-pin:
O - O
O - X
 C#4_Conditioning_-_HV_test.docxER-580-230-30kV-m7.txtER-580-230-30kV-m39.txtER-580-230-30kV-m134.txt 
  939   Tuesday, August 30, 2022, 13:58 Aaron Schmidt    44062-744378-25In progressConditioning UC#40 assemblyConditioning the UC#40 LP-SIS assembly
& ISAC TS main vacuum chamber. Straight
/ round oven in use (TGHT only).
  
  938   Monday, July 11, 2022, 09:17 Aaron Schmidt      In progressPump down empty chamberMonday, July 11, 2022, 09:15: Roughing.   
  937   Sunday, July 10, 2022, 22:19 Aaron Schmidt      Problems/SolutionsTP2 Trip / TMS:RP2 issue Sunday, July 10, 2022, 22:19: A trip
was noted on TP2. the backing pressure is
quite high. Shutting off the turbo pumps
  
  936   Thursday, July 07, 2022, 16:52 Aaron Schmidt LP-IG-LISITWTM2 42132-3In progressConditioning UC#39 assemblyNo UCx target installed. Straight / blank
oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
  
  935   Thursday, June 30, 2022, 13:50 Aaron Schmidt       Pump down empty chamberThursday, June 30, 2022, 13:46: Roughing.

Thursday, July 07, 2022,
15:00: Venting.
  
  934   Thursday, June 23, 2022, 11:00 Aaron SchmidtSiC#44HP-FEBIADITETM437978-144378-24In progressConditioning SiC#44Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A
open.
 SiC#44_-_R.docxER-580-290-30kV-m28.txtSiC#44.docx 
  933   Monday, June 20, 2022, 11:49 Aaron Schmidt       Pump down empty chamberMonday, June 20, 2022, 11:49: Water line
loop installed. Roughing.

Thursday, June 23, 2022,
  
  932   Saturday, June 18, 2022, 10:04 Aaron SchmidtSiC#43HP-FEBIADITWTM242464-144378-16In progressConditioning SiC#43Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data
 SiC#43_Conditioning_-_R.docxER-580-290-30kV-m27.txtSiC#43.docx 
  931   Wednesday, June 08, 2022, 10:01 Aaron SchmidtTa#64LP-SISITETM444691-1244378-13In progressConditioning Ta#64 & HV Test.Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33:
Roughing.
 7x 
  930   Tuesday, May 31, 2022, 13:35 Aaron SchmidtUCx HS ITWTM2 44378-19In progressConditioning UC#38 assemblyUsing a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B
  
  929   Friday, May 27, 2022, 07:19 Fernando Maldonado      DoneFEBIAD parameter scan web-app and brief description (with links)A web-app for systematic FEBIAD parametrizations
has been develop and  now includes the
ISAC Test Stand (ITS) :
  
  928   Wednesday, May 25, 2022, 15:48 Aaron SchmidtSiC#42HP-FEBIADITWTM244692-944378-5In progressConditioning SiC#42Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B
on.
 ER-580-290-30kV-m28.txtSiC#42.docxSiC#42_Conditioning_-_R.docx 
  927   Thursday, May 12, 2022, 10:50 Aaron Schmidt P2N-SISITETM444812-245240-1In progressP2N assembly conditioning - 4PE shimmed & extended 1mm due to likely
ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
  
  926   Wednesday, May 11, 2022, 10:05 Aaron Schmidt P2N-SISITETM444812-245240-1 P2N assembly conditioning - 3Target oven #45241-1 swapped out. SS bolts
were in use on the legs.
Molybdenum screws in the legs on
  
  925   Tuesday, May 10, 2022, 10:09 Aaron Schmidt P2N-SISITETM445241-145240-1In progressP2N assembly conditioning - 2 Ref: https://elog.triumf.ca/TIS/Test-Stand/924.
During testing, it was noted one leg was
glowing vs the other. P2N assembly was removed
  
ELOG V2.9.2-2455