Tuesday, November 15, 2022, 11:24, Aaron Schmidt, UC#41 assembly, LP-SIS, ITE, TM4, 45220-8, 45235-4, In progress, Conditioning UC#41 assembly
|
LP-SIS 45220-8 is empty & for testing only.
Tuesday, November 15, 2022, 11:00: Roughing.
Tuesday, November 15, 2022, 11:21: BV1A open.
Tuesday, November 15, 2022, 12:40: TP1B on
Tuesday, November 15, 2022, 12:47: TP1A on
Tuesday, November 15, 2022, 12:49: T1A Currently spinning up. Distinct & loud hum noted. Contacting vacuum group.
Tuesday, November 15, 2022, 12:50: TP's off.
Tuesday, November 15, 2022, 12:55: TP1B restart. ok
Tuesday, November 15, 2022, 12:56: TP1A restart. Failed
Tuesday, November 15, 2022, 13:04: TP1A restart. Failed.
Tuesday, November 15, 2022, 13:05: Controller reset TP1A restarted. Failed. Visually confirmed that it has seized.
See elog# 946
Wednesday, November 16, 2022, 14:53: TP1B on
Wednesday, November 16, 2022, 14:56: TP1B at speed.
Wednesday, November 16, 2022, 14:58: TP1A on.
Wednesday, November 16, 2022, 15:07: TP1A at speed. IG1 on
Thursday, November 17, 2022, 07:14: Waterline FS#5 open. Vacuum stable @ 9.59e-07T
Thursday, November 17, 2022, 07:15: IV4 open.
Thursday, November 17, 2022, 07:18: PS & Sources on.
Thursday, November 17, 2022, 07:20: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, November 17, 2022, 07:23: Optics set
Thursday, November 17, 2022, 07:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 07:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, November 17, 2022, 07:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, November 17, 2022, 07:40: BIAS / EE / EZL @ 45 / -2.3 / 20 kV
Thursday, November 17, 2022, 08:40: No sparks over 1 hr.
Thursday, November 17, 2022, 08:43: HV reduced. BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Thursday, November 17, 2022, 10:06: Minor instability & sparks noted.
Thursday, November 17, 2022, 10:18: Consistent sparking. Visually confirmed on the TBHT insulator.
Thursday, November 17, 2022, 10:21: BIAS & EZL reduced to 20 / 10 kV.
Thursday, November 17, 2022, 10:51: HV stable for the last 15 minutes. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.
Thursday, November 17, 2022, 14:02: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Stable
Thursday, November 17, 2022, 14:25: Mass & wire scans complete Empty LP-SIS No salts added.
Masses showed around mass:
-130-140
-39-40
-23-28
Thursday, November 17, 2022, 14:27: Outgassing continues.
Friday, November 18, 2022, 07:39: Mass & wire scans continued.
Traces masses:
-39-40
-23
Friday, November 18, 2022, 07:48: Auto-cooling @ 2 A per min.
Friday, November 18, 2022, 08:01: HV off.
Monday, November 21, 2022, 06:44: Sources off & IV4 closed.
Monday, November 21, 2022, 06:45: IG1 off. Turbo pumps off. |
Wednesday, October 19, 2022, 12:16, Aaron Schmidt, , , , , , , , Test Stand controls changed
|
genepicsas.triumf.ca
x11 enabled.
Then use login credentials.
Wednesday, October 19, 2022, 12:10: Login. Success
Monday, November 07, 2022, 13:13 Use ATTS on putty page.
New ramping program:
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:19: Ramping complete:
|
Tuesday, October 18, 2022, 13:25, Aaron Schmidt, C#5, LP-SIS, , , 45235-5, 44691-13, In progress, Conditioning C#5
|
Tuesday, October 18, 2022, 13:25: Roughing.
Tuesday, October 18, 2022, 13:28: BV1A open
Wednesday, October 19, 2022, 12:14: TP1B on.
Wednesday, October 19, 2022, 12:18: TP1A on.
Wednesday, October 19, 2022, 12:26: IG1 on.
Wednesday, October 19, 2022, 12:34: IV4 open & Closed. Vacuum @ 4.13e-06T.
Wednesday, October 19, 2022, 12:39: FS#5 Water line opened.
Wednesday, October 19, 2022, 12:40: PS on.
Wednesday, October 19, 2022, 12:43: Optics PS on. Unlocked.
Wednesday, October 19, 2022, 12:44: Sources on. Vacuum @ 3.21e-06T.
Wednesday, October 19, 2022, 12:46: BIAS / EE / EZL @ 1 / -0.5 / 1 kV.
Wednesday, October 19, 2022, 12:47: TGHT / TBHT @ 10 / 10 A manually.
Wednesday, October 19, 2022, 12:48: IV4 Open.
Wednesday, October 19, 2022, 12:53: Optics set.
Controls updated
Monday, November 07, 2022, 12:40: Optics set
Monday, November 07, 2022, 13:00: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Monday, November 07, 2022, 13:15: Auto-ramping TGHT / TBHT to 20 A @ 4A per minute. (Testing new auto-ramp)
Monday, November 07, 2022, 13:35: BIAS / EE / EZL @ 35 / -1.8 / 15 kV. Spark*
Monday, November 07, 2022, 13:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Monday, November 07, 2022, 13:41: BIAS / EE / EZL @ 45 / -2.3 / 20 kV with multiple sparks near the 44-45kV end of the tap up.
Monday, November 07, 2022, 14:09: Spark. Audible outside the cage, however vacuum was also affected.
Monday, November 07, 2022, 14:49: No further sparks. HV check ok.
Monday, November 07, 2022, 14:52: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. |
Thursday, September 29, 2022, 13:50, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Water loop installed.
Thursday, September 29, 2022, 13:50: Roughing
Tuesday, October 18, 2022, 11:17: Venting |
Tuesday, September 27, 2022, 07:55, Aaron Schmidt, C#4, LP-SIS, ITE, TM4, 44691-3, 44378-23, In progress, Conditioning C#4 w/ thermocouples
|
Thermocouples attached on 5 X 5 multi-pin:
O - O
O - X
O - X
X - X
X - X
Tuesday, September 27, 2022, 07:51: Roughing.
Tuesday, September 27, 2022, 08:25: TP1B on.
Tuesday, September 27, 2022, 08:45: TP1A on.
Tuesday, September 27, 2022, 11:02: Vacuum @ 8.31e-06T
Tuesday, September 27, 2022, 11:04: Waterline FS#5 opened. Vacuum @ 8.13e-06T. Power on
Data logger connected as per FBP
Tuesday, September 27, 2022, 12:18: Sources/PS on.
Tuesday, September 27, 2022, 12:21: TGHT / TBHT manually tapped up to 10A.
Tuesday, September 27, 2022, 12:29: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Tuesday, September 27, 2022, 12:34: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Tuesday, September 27, 2022, 12:35: Sparks* @ 37 KV BIAS. Outside the cage. x 2
Tuesday, September 27, 2022, 12:37: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Tuesday, September 27, 2022, 12:47: BIAS / EE / EZL @ 45 / -2.3 / 19 kV with multiple sparks on the tap up.
Tuesday, September 27, 2022, 13:00: 2 more sparks. TSG:CBC down. (Red)
Tuesday, September 27, 2022, 13:08: BIAS / EE / EZL @ 47.2 / -2.4 / 20 kV. Significant spark outside the cage.
Tuesday, September 27, 2022, 13:10: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. Spark outside the cage.
Tuesday, September 27, 2022, 13:12: Blue glow / crack flowing across the TBHT.
Tuesday, September 27, 2022, 13:15: The glow is flexing? Fading in & out.
Tuesday, September 27, 2022, 13:50: HV Tap down to 0 kV
Tuesday, September 27, 2022, 14:13: TSG:CBC controls card replaced. Operation returned.
Tuesday, September 27, 2022, 14:14: IV4 opened.
Tuesday, September 27, 2022, 14:17: Optics set.
Tuesday, September 27, 2022, 14:19: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per min.
Tuesday, September 27, 2022, 14:43: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Remote operation clear.
Tuesday, September 27, 2022, 18:20: TS tripped shortly after 3:35 PM
Tuesday, September 27, 2022, 18:30: Reset TS sources & optics
Tuesday, September 27, 2022, 18:49: Auto-ramping TGHT / TBHT to 300 / 150 @ 1A per min. Allow for a gradual out gassing.
Tuesday, September 27, 2022, 21:20: TGHT / TBHT @ 150A Vacuum @ 2.15e-06T. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 22:08: TGHT / TBHT @ 200 / 150 A. Vacuum @ 2.15e-06T. Stable. TGHT ramp ongoing @ 1 A per min.
Tuesday, September 27, 2022, 23:19: Auto-ramp halted. Sped up to 2 A per min. Vacuum @ 1.96e-06T. TGHT @ 270 A.
Tuesday, September 27, 2022, 23:41: TGHT / TBHT @ 300 / 150 A. Vacuum @ 1.97e-06T
Wednesday, September 28, 2022, 06:36: Auto-ramping TGHT to 350A @ 1A per min.
Wednesday, September 28, 2022, 08:14: Vacuum remained stable @ 1.49e-06T. Auto-ramping TGHT / TBHT to 400 / 200 A @ 2A per min.
Wednesday, September 28, 2022, 08:48: Increase in vacuum up to 2.50e-06T+ followed by a drop in TBHT voltage. TGHT / TBHT remain stable @ 400 / 200 A. Vacuum stabilizing @ 2.32e-06T. HV off.
Wednesday, September 28, 2022, 09:15: Data logger setup. Pins moved from 3 & 4 to 4 & 5. Temperature @ 50.6 C.
Wednesday, September 28, 2022, 09:20: HV sources & optics back on. Tap up.
Wednesday, September 28, 2022, 09:33: Auto-ramping TGHT to 450A @ 2 A per min. Some small sparks noted.
Wednesday, September 28, 2022, 09:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.
Wednesday, September 28, 2022, 09:59: Auto-ramping TGHT to 500A @ 2 A per min. Some small sparks noted although less frequent.
Wednesday, September 28, 2022, 10:28: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2A per min.
Wednesday, September 28, 2022, 10:41: BIAS lowered to 25 kV.
Wednesday, September 28, 2022, 11:09: TGHT / TBHT @ 580 / 230 A. BIAS @ 30 kV. Unstable / sparking.Very active on FC0
Wednesday, September 28, 2022, 11:29: Mass & wire scans ongoing. Reset DAC PS.
Wednesday, September 28, 2022, 11:58: Mass, wire & emittance scans complete. FC0 in. Auto-cooling @ 2 A per min.
Wednesday, September 28, 2022, 13:16: Cooling aborted for measurement.
Wednesday, September 28, 2022, 13:21: Auto-cooling @ 2 A per min.
Thursday, September 29, 2022, 07:20: IV4 closed. Sources off. IG 1 & TP off. |
Tuesday, August 30, 2022, 13:58, Aaron Schmidt, , , , , 44062-7, 44378-25, In progress, Conditioning UC#40 assembly
|
Conditioning the UC#40 LP-SIS assembly & ISAC TS main vacuum chamber. Straight / round oven in use (TGHT only).
Tuesday, August 30, 2022, 13:55: BV1B open. Roughing.
Tuesday, August 30, 2022, 14:00: BV1A open.
Wednesday, August 31, 2022, 07:29: Vacuum @ 0.064T. TP1B on.
Wednesday, August 31, 2022, 07:35: TP1 A on.
Wednesday, August 31, 2022, 08:56: Vacuum @ 9.97e-06T. Waterline FS#5 opened.
Wednesday, August 31, 2022, 08:58: Vacuum @ 9.95e-06T. OK. Power on.
Thursday, September 01, 2022, 07:50: Vacuum @ 5.21e-06T.
Thursday, September 01, 2022, 07:54: Manually tapped up TGHT to 50 A.
Limit increased on TGHT parameter setup to 5.500e-06T.
Thursday, September 01, 2022, 07:57: Auto-ramping TGHT to 580 A @ 2 A per min.
Monday, September 12, 2022, 15:09: Vacuum @ 1.69e-06T. Auto-cooling @ 2A per min.
Monday, September 26, 2022, 10:52: Turbo pumps off.
Monday, September 26, 2022, 12:20: Venting. PS off & waterlines purged. |
Monday, July 11, 2022, 09:17, Aaron Schmidt, , , , , , , In progress, Pump down empty chamber
|
Monday, July 11, 2022, 09:15: Roughing. |
Sunday, July 10, 2022, 22:19, Aaron Schmidt, , , , , , , Problems/Solutions, TP2 Trip / TMS:RP2 issue
|
Sunday, July 10, 2022, 22:19: A trip was noted on TP2. the backing pressure is quite high. Shutting off the turbo pumps for the beamline side.
Monday, July 11, 2022, 06:01: Venting.
Monday, July 11, 2022, 08:12: RP1 off.
Monday, July 11, 2022, 09:01: RP changed. SN#LPA49885
Monday, July 11, 2022, 09:02: Down to 0.032T Fast. TP2 & TP6 on.
Monday, July 11, 2022, 09:08: Pumps up to speed. IG6 on. |
Thursday, July 07, 2022, 16:52, Aaron Schmidt, , LP-IG-LIS, ITW, TM2, , 42132-3, In progress, Conditioning UC#39 assembly
|
No UCx target installed. Straight / blank oven in use for out gassing.
Thursday, July 07, 2022, 16:50: Roughing.
Thursday, July 07, 2022, 16:53: BV1A Open.
Thursday, July 07, 2022, 17:31: TP1B on.
Thursday, July 07, 2022, 17:36: TP1A on.
Thursday, July 07, 2022, 17:46: IG1 on. Vacuum @ 2.31e-05T
Thursday, July 07, 2022, 17:47: Waterline FS#5 Opened. Vacuum @ 2.05e-05T & continuing down.
Thursday, July 07, 2022, 18:00: Bypass on IG1. 10A TGHT Check. Ok. Back to 0A. Removed bypass. Ready for remote operation.
Friday, July 08, 2022, 10:44: Started autoramping TGHT 580A/TBHT 0A
Friday, July 08, 2022, 15:37: Autoramping complete
Saturday, July 09, 2022, 07:34 : ramp down started
Sunday, July 10, 2022, 22:14: IG1, TP1B & A off. TP6 has tripped. Sources off.
|
Thursday, June 30, 2022, 13:50, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Thursday, June 30, 2022, 13:46: Roughing.
Thursday, July 07, 2022, 15:00: Venting. |
Thursday, June 23, 2022, 11:00, Aaron Schmidt, SiC#44, HP-FEBIAD, ITE, TM4, 37978-1, 44378-24, In progress, Conditioning SiC#44
|
Thursday, June 23, 2022, 10:58: Roughing.
Thursday, June 23, 2022, 11:03: BV1A open.
Thursday, June 23, 2022, 11:34: TP1B on
Thursday, June 23, 2022, 11:41: TP1A on.
Thursday, June 23, 2022, 11:49: IG1 on.
Thursday, June 23, 2022, 12:25: Gases on.
Thursday, June 23, 2022, 12:30: Power on. Cage locked up
Thursday, June 23, 2022, 14:14: Vacuum @ 3.23e-06T.
Thursday, June 23, 2022, 14:15: Waterlines opened. Vacuum stable.
Thursday, June 23, 2022, 14:16: IV4 opened.
Thursday, June 23, 2022, 14:17: Sources on.
Thursday, June 23, 2022, 14:18: Optics set. FM tune.
Thursday, June 23, 2022, 14:21: Electrical check OK. Will leave as is. Remote operation ready.
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Thursday, June 23, 2022, 14:22: Reset Kepco (E-rig) PS.
Friday, June 24, 2022, 09:07: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Friday, June 24, 2022, 09:17: BIAS / EE / EZL @ 20 / -1.5 / 10 kV.
Friday, June 24, 2022, 13:18: Ramping ongoing. TGHT / TBHT @ 510 / 290 A. Vacuum @ 3.65e-06T
Friday, June 24, 2022, 19:19: FM Tune on optics / Sources. Vacuum @ 1.60e-06T. BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Friday, June 24, 2022, 19:42: Coil to 15 A. Anode to 200 V.
Friday, June 24, 2022, 20:00: Mass scans complete.
Friday, June 24, 2022, 20:01: BIAS / EZL reduced to 20 / 10 kV.
Friday, June 24, 2022, 20:02: Anode @ 100 V.
Monday, June 27, 2022, 09:34: BIAS / EE / EZL @ 30 / -1.5 / 15 kV.
Monday, June 27, 2022, 09:36: Anode @ 200 V. Coil @ 40 A. Vacuum @ 9.99e-07T
Monday, June 27, 2022, 10:09: Last scans complete. Auto-cooling @ 2 A per min.
Monday, June 27, 2022, 10:19: Anode, coil, & HV to 0.
Monday, June 27, 2022, 10:20: IV4 & SV5 Closed.
Wednesday, June 29, 2022, 10:57: Sources & IG1 off. Turbo pumps off
Wednesday, June 29, 2022, 12:25: Venting. |
Monday, June 20, 2022, 11:49, Aaron Schmidt, , , , , , , , Pump down empty chamber
|
Monday, June 20, 2022, 11:49: Water line loop installed. Roughing.
Thursday, June 23, 2022, 09:25: Venting. |
Saturday, June 18, 2022, 10:04, Aaron Schmidt, SiC#43, HP-FEBIAD, ITW, TM2, 42464-1, 44378-16, In progress, Conditioning SiC#43
|
Note: SiC#42 replacement.
Saturday, June 18, 2022, 09:54: Roughing.
Saturday, June 18, 2022, 10:08: Data logger removed. Pins 4 & 5 grounded. Power on.
Saturday, June 18, 2022, 10:41: TP1B on.
Saturday, June 18, 2022, 10:48: TP1A on.
Saturday, June 18, 2022, 10:55: IG1 on.
Saturday, June 18, 2022, 11:13: Gases on. Cage closed up. SV5 remains on. SV4 (Argon tank) Closed.
Saturday, June 18, 2022, 11:14: Vacuum @ 2.49e-05T.
Saturday, June 18, 2022, 11:15: Waterline FS#5 opened.
Saturday, June 18, 2022, 11:22: Electrical check w/ IG1 bypass
BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V.
TGHT / TBHT @ 5 A each. Coil @ 5 A.
Saturday, June 18, 2022, 11:23: All checks clear. Bypass removed. Ready for remote operation. Vacuum @ 2.14e-05T
Saturday, June 18, 2022, 21:34: Sources on. Vacuum @ 3.38e-06T. IV4 open.
Saturday, June 18, 2022, 21:36: Optics on. Standard tune.
Saturday, June 18, 2022, 22:24: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min to out gas overnight.
Saturday, June 18, 2022, 22:55: BIAS / EE / EZL @ 2.5 / -0.5 / 1 kV. Anode @ 100V. Coil @ 10 A. Low settings left as a general electrical check to run as the target heats up.
Sunday, June 19, 2022, 16:37: Vacuum @ 1.60e-06T.
Sunday, June 19, 2022, 16:40: Open SV4 (Argon gas - W/ quick steps on procedure). Vacuum ok.
Sunday, June 19, 2022, 16:42: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min.
Sunday, June 19, 2022, 19:48: BIAS / EE / EZL / Anode @ 0. Coil to 0.
Sunday, June 19, 2022, 19:59: Anode tapped up manually to 400 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Anode tapped up manually to 0 V @ approx 1 V per second.
Sunday, June 19, 2022, 20:14: Coil tapped up manually to 100 A @ approx 1 A per second.
Sunday, June 19, 2022, 20:15: Full Trip. Vacuum limit passed. TGHT / TBHT Went to 0 A
Sunday, June 19, 2022, 20:17: TGHT / TBHT @ 580 / 290 A.
Sunday, June 19, 2022, 20:31: Stable. Vacuum @ 4.21e-06T.
Sunday, June 19, 2022, 20:58: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Anode @ 100 V.
Sunday, June 19, 2022, 21:00: Coil @ 10 A. Vacuum @ 3.49e-06T.
Sunday, June 19, 2022, 21:07: Begin mass & wire scans.
Sunday, June 19, 2022, 21:39: Scans complete.
Monday, June 20, 2022, 05:58: Further mass, wire, & emittance scans.
Monday, June 20, 2022, 06:29: Coil @ 40 A, Anode @ 300 V. Optics set to FM tune.
Monday, June 20, 2022, 06:59: Scans complete. Auto-cooling @ 3 A per min.
Monday, June 20, 2022, 07:03: Coil & Anode to 0 A / 0 V.
Monday, June 20, 2022, 07:07: BIAS / EE / EZL @ 0 kV.
Monday, June 20, 2022, 10:12: IV4 closed.
Monday, June 20, 2022, 10:13: Gases closed. IG1 off. Turbo pumps off.
Monday, June 20, 2022, 11:09: Venting. |
Wednesday, June 08, 2022, 10:01, Aaron Schmidt, Ta#64, LP-SIS, ITE, TM4, 44691-12, 44378-13, In progress, Conditioning Ta#64 & HV Test. 7x
|
Thermocouples connected. Test HV
Wednesday, June 08, 2022, 09:33: Roughing.
Wednesday, June 08, 2022, 10:07: TP1B on.
Wednesday, June 08, 2022, 10:13: TP1B up to speed. TP1A on.
Wednesday, June 08, 2022, 10:21: TP1A up to speed. IG1 on.
Wednesday, June 08, 2022, 13:06: Waterline FS#5 Open. Vacuum @ 3.32-e06T.
Wednesday, June 08, 2022, 13:22: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Wednesday, June 08, 2022, 13:26: One spark*.
Wednesday, June 08, 2022, 13:32: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Wednesday, June 08, 2022, 13:33: Spark*
Wednesday, June 08, 2022, 13:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Wednesday, June 08, 2022, 13:42: Spark*. Outside the cage (EE) Feedthrough (K) Between a hex edge & one of the resistors on a plastic plate.
Wednesday, June 08, 2022, 13:50: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Wednesday, June 08, 2022, 14:18: We are back. Spark tripped the computer & shut it off while tapping up the HV. BIAS / EE / EZL @ 48.3 / 2.4 / 20 kV.
Wednesday, June 08, 2022, 14:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV.
Wednesday, June 08, 2022, 14:45: Spark* In the cage.
Wednesday, June 08, 2022, 14:57: Spark* In the cage.
Wednesday, June 08, 2022, 15:19: No sparks have occurred off the thermocouples. Begin tapping down the HV.
Wednesday, June 08, 2022, 15:29: HV off. TGHT / TBHT Check @ 5 / 5 A OK.
Wednesday, June 08, 2022, 15:31: IV4 open.
Thursday, June 09, 2022, 05:14: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min.
Thursday, June 09, 2022, 08:21: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. OK.
Thursday, June 09, 2022, 08:22: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min
Thursday, June 09, 2022, 08:29: Optics set. Standard tune.
Thursday, June 09, 2022, 10:22: Beginning wire & mass scans.
Thursday, June 09, 2022, 10:30: Adjust TSG:CB1 (ok)
Thursday, June 09, 2022, 11:40: Mass & wire scans complete. Tune set to standard. HV tests begin. BIAS / EE / EZL @ 35 / -1.8 / 15 kV.
Thursday, June 09, 2022, 11:45: BIAS / EE / EZL @ 40 / -2.0 / 17 kV
Thursday, June 09, 2022, 13:01: BIAS / EE / EZL @ 45 / -2.3 / 19 kV
Thursday, June 09, 2022, 13:13: Small spark* Outside the chamber, but in the cage.
Thursday, June 09, 2022, 13:22: BIAS / EE / EZL @ 50 / -2.5 / 20 kV. (One spark during the tap up. In the cage)
Thursday, June 09, 2022, 14:03: Small spark, barely audible.
Thursday, June 09, 2022, 14:11: Large spark in the cage* Computer was shut off. Got it back around 14:16
Thursday, June 09, 2022, 14:20: Reset steering, optics, IG6.
Thursday, June 09, 2022, 14:28: Begin tapping down HV
Thursday, June 09, 2022, 14:34: HV to 0.
Thursday, June 09, 2022, 14:36: Closed IV4. (Reset w/ screwdriver)
Friday, June 10, 2022, 09:58: Auto-Cooling @ 2 A per min.
Monday, June 13, 2022, 10:16: IG1 off. Turbo pumps off. |
Tuesday, May 31, 2022, 13:35, Aaron Schmidt, UCx HS, , ITW, TM2, , 44378-19, In progress, Conditioning UC#38 assembly
|
Using a broken LP-FEBIAD source. TGHT only.
Tuesday, May 31, 2022, 13:24: Roughing.
Tuesday, May 31, 2022, 13:54: TP1B on.
Tuesday, May 31, 2022, 14:06: TP1A on.
Tuesday, May 31, 2022, 14:13: IG1 on.
Wednesday, June 01, 2022, 07:41: Vacuum @ 2.13e-06T. Waterline FS#5 open.
Wednesday, June 01, 2022, 07:43: Power/Sources on.
Wednesday, June 01, 2022, 07:51: Auto-ramping TGHT to 580A @ 2A per min.
Monday, June 06, 2022, 07:09: Auto-cooling @ 2A per min.
Wednesday, June 08, 2022, 07:07: Turbo pumps off.
Wednesday, June 08, 2022, 07:53: Venting. |
Friday, May 27, 2022, 07:19, Fernando Maldonado, , , , , , , Done, FEBIAD parameter scan web-app and brief description (with links)
|
A web-app for systematic FEBIAD parametrizations has been develop and now includes the ISAC Test Stand (ITS) :
https://beta.hla.triumf.ca/degaussing/FEBIAD-scan/
Upon landing in the web-app the ITS will be selected by default as well as the TMS:FC6:SCALECUR faraday cup, which corresponds the last cup of the ITS beamline.
To run a similar scan but on the total source current (FC0) the field has to change from TMS:FC6:SCALECUR to TMS:FC0:SCALECUR.
Each measurement will create a unique id (measurement_id), and the data can be retrieved from
https://beta.hla.triumf.ca/jaya/data/get/measure_id
Plot and analysis routines for the data generated by the FEBIAD-scan can be found in
https://jupyter.triumf.ca/hub/login
for which you need a TRCOMP account. The routines are located in the group folder
/group/ionsrc/fernando |
Wednesday, May 25, 2022, 15:48, Aaron Schmidt, SiC#42, HP-FEBIAD, ITW, TM2, 44692-9, 44378-5, In progress, Conditioning SiC#42
|
Wednesday, May 25, 2022, 15:46: Roughing.
Wednesday, May 25, 2022, 16:21: TP1B on.
Wednesday, May 25, 2022, 16:38: TP1A on.
Wednesday, May 25, 2022, 16:46: IG1 on.
Thursday, May 26, 2022, 09:20: FS#5 Waterline opened. Vacuum ok @ 5.27e-06T.
HV preset: BIAS / EE / EZL @ 30 / -1.0 / 15 kV
Friday, May 27, 2022, 05:11: Coil to 40 A. Anode t0 300 V.
Friday, May 27, 2022, 05:16: TGHT on. Auto-ramping TGHT / TBHT to 580 / 290 @ 2 A per min.
Friday, May 27, 2022, 07:14: Optics set & IV4 opened. TGHT / TBHT @ 242 A (Ramping ongoing)
FM
Friday, May 27, 2022, 17:17 : IG1 @ 5.19e-6 T. TBHT @ 290 A. TGHT @ 540 A since 16:27.
Friday, May 27, 2022, 17:18: The assembly has been outgassing and the good vacuum limit was reached, preventing reaching the operational point.
Friday, May 27, 2022, 17:19: Auto-ramp up aborted. We'll heat up again Monday morning.
Friday, May 27, 2022, 17:20: Auto-cooling to 0 A @ 2A/min
Sunday, May 29, 2022, 21:35: Auto-ramping TGHT/ TBHT to 350 / 150 A @ 2 A per min - AS.
Sunday, May 29, 2022, 21:40: Vacuum @ 1.43e-06T.
Monday, May 30, 2022, 04:53: Vacuum @ 1.49e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min - AS
Monday, May 30, 2022, 08:06: Initial wire & mass scans ok. Increase EE to -1.5 kV.
Monday, May 30, 2022, 08:30: EE back to -1.0 kV.
Monday, May 30, 2022, 10:31: BIAS / EE / EZL / Anode @ 0 kV. Lock over. Open back/top cage.
FM
Monday, May 30, 2022, 11:21: Mass set to 40Ar+. The gas on/off now shows an effect on the signal
Monday, May 30, 2022, 11:24: Running a small scan to test the web-app
Monday, May 30, 2022, 14:00: Spark towards TBHT, TPS:Q1 charged up.
Monday, May 30, 2022, 14:30: Spark to anode.
Monday, May 30, 2022, 16:16: Issue preventing FEBIAD-scan solve.
Monday, May 30, 2022, 16:16 : FEBIAD scan on 40Ar+.
Monday, May 30, 2022, 17:00: TMS :VCB1 died in the middle of the scan. Scan aborted save id 1085. Starting a new scan
Monday, May 30, 2022, 18:24: measured_id = 1086
Moving to H2O
Monday, May 30, 2022, 18:30: Scan started for H2O.
Monday, May 30, 2022, 19:53: Scan finished. measure_id = 1087
Monday, May 30, 2022, 19:58: Gas off. Scan for H2O ready to go.
Monday, May 30, 2022, 19:59: Scan started
Monday, May 30, 2022, 21:21: Scan finished. measured_id = 1089
Monday, May 30, 2022, 21:32: Auto-cooling to 0 A @ 2A/min
AS
Tuesday, May 31, 2022, 05:10: All HV & Sources off.
Tuesday, May 31, 2022, 05:11: IV4 closed. IG1 & turbo pumps off.
Tuesday, May 31, 2022, 07:02: IV4 reset. Venting.
Tuesday, May 31, 2022, 07:08: FS#5 purged. Power locked up. |
Thursday, May 12, 2022, 10:50, Aaron Schmidt, , P2N-SIS, ITE, TM4, 44812-2, 45240-1, In progress, P2N assembly conditioning - 4
|
PE shimmed & extended 1mm due to likely ion source contact.
Thursday, May 12, 2022, 10:41: Roughing.
Thursday, May 12, 2022, 11:26: TP1B on.
Thursday, May 12, 2022, 11:35: TP1A on.
Thursday, May 12, 2022, 11:43: IG1 on.
Thursday, May 12, 2022, 11:48: Vacuum @ 2.65e-05T. FS#5 Opened. No immediate spike.
Thursday, May 12, 2022, 11:50: Vacuum @ 2.47e-05T & dropping.
Friday, May 13, 2022, 07:32: TP/IG off.
Friday, May 13, 2022, 09:51: Venting. |
Wednesday, May 11, 2022, 10:05, Aaron Schmidt, , P2N-SIS, ITE, TM4, 44812-2, 45240-1, , P2N assembly conditioning - 3
|
Target oven #45241-1 swapped out. SS bolts were in use on the legs.
Molybdenum screws in the legs on oven #44812-2. No target to ion source cup interference. 3mm gap - OK.
TGHT - R: 1.215
TGHT - L: 1.206
TBHT - R: 2.014
TBHT - L: 2.013
Cathode cable detached from feed-through (B).
Wednesday, May 11, 2022, 10:04: Roughing.
Wednesday, May 11, 2022, 10:33: TP1B on.
Wednesday, May 11, 2022, 10:43: TP1A on.
Wednesday, May 11, 2022, 10:51: IG1 on.
Wednesday, May 11, 2022, 13:43: Vacuum @ 5.43e-06T. FS#5 Open.
Wednesday, May 11, 2022, 13:45: Vacuum @ 5.36e-06T. OK. |
Tuesday, May 10, 2022, 10:09, Aaron Schmidt, , P2N-SIS, ITE, TM4, 45241-1, 45240-1, In progress, P2N assembly conditioning - 2
|
Ref: https://elog.triumf.ca/TIS/Test-Stand/924. During testing, it was noted one leg was glowing vs the other. P2N assembly was removed & inspected. No contact or defects were found.
Tuesday, May 10, 2022, 10:05: Roughing.
Tuesday, May 10, 2022, 10:42: TP1 on.
Tuesday, May 10, 2022, 10:50: TP1A on.
Tuesday, May 10, 2022, 10:58: IG1 on. Vacuum @ 1.77e-05T & dropping.
Tuesday, May 10, 2022, 13:45: Vacuum @ 5.63e-06T. FS#5 Opened.
Tuesday, May 10, 2022, 13:58: Vacuum @ 5.27e-06T.
|
|