  993   Tuesday, February 06, 2024, 11:48 Aaron SchmidtSiC# (Stock)HP-SIS  41369-245235-14In progressConditioning (Stock SiC-24C) SiC HP-SISTuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27:
TP1B on.
  
  994   Tuesday, February 06, 2024, 14:09 Aaron Schmidt      Problems/SolutionsFC0 Solenoid issueTuesday, February 06, 2024, 14:06: Attempted
to 'Close' FC0. While it succeeded in moving
into position, HPA rushed out of the exhaust.
  
  995   Friday, February 16, 2024, 05:03 Aaron Schmidt      Problems/SolutionsCoil PS issue15-02-2024
The coil PS control card is fried.
Roughly since the beginning of December.
 Coil_PS_Control_Card.png 
  996   Friday, February 16, 2024, 10:30 Aaron SchmidtSiC# (Stock)HP-FEBIAD  45447-445235-21In progressConditioning stock SiC HP FEBIADFriday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38:
TP1B on. 
 Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docxHP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docxStock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx 
  997   Tuesday, February 20, 2024, 14:22 Aaron Schmidt       Set to Cathode BIAS ModeTuesday, February 20, 2024, 14:20: TS to
wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59:
  
  998   Monday, February 26, 2024, 10:24 Aaron Schmidt      Problems/SolutionsTMS:RP2 purge. TS exhaust clearing. + TMS:TP6Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed
that the turbo pumps TMS:TP6 & TMS:TP2
  
  1001   Tuesday, April 09, 2024, 15:28 Aaron Schmidt       Set to Anode BIAS Mode & Old gas leak installed.Switched to Anode mode on March 28 including
polarity. The old calibrated leak was also
re-installed.
  
  1002   Tuesday, April 09, 2024, 16:01 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online useTuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024,
05:41: TP1B on. 
 EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx 
  1003   Monday, April 15, 2024, 14:35 Aaron Schmidt      Problems/SolutionsTSH:EE IssuesMonday, April 15, 2024, 14:33: On Friday
it was noted that the EE was being troublesome.
If we put -500 V on the EE the PS would deliver
  
  1004   Wednesday, April 17, 2024, 14:16 Aaron SchmidtEmpty (Online)LP-FEBIADITWTM445447-2442972-8In progressConditioning empty FEBIAD for online use - Run 2https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08:
 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx 
  1007   Friday, April 26, 2024, 13:49 Aaron SchmidtTiC#7HP-FEBIADITWTM445447-545235-15In progressConditioning TiC#7FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B
  
  1010   Thursday, May 30, 2024, 16:00 Aaron Schmidt LP-FEBIAD  44692-445235-18In progressConditioning spare FEBIADAnode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline
  
  1016   Wednesday, July 31, 2024, 18:50 Aaron SchmidtTiC SpareHP-FEBIADITWTM445447-242752-7In progressConditioning Spare for TiC#7Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24:
TP1B on.
  
  1017   Tuesday, August 06, 2024, 15:50 Aaron Schmidt      Problems/SolutionsTS Troubleshooting - Leak/HV spark issuesDue to HV sparking & possible water
leaks on the previous TiC & Ta targets,
checks are to be performed.
  
  1022   Friday, September 20, 2024, 14:22 Aaron SchmidtTa#LP-SISITETM245447-1845235-13 Conditioning Ta# https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04:
  
  1023   Thursday, October 03, 2024, 16:26 Aaron SchmidtTa#68HP-SISITETM245447-2645235-16 * Conditioning Ta#68HS note:
Base# 45235-16
Lid# 39956-8
  
  1024   Monday, October 07, 2024, 09:54 Aaron Schmidt       Pump down empty chamber / IG6 fix Monday, October 07, 2024, 09:54:
Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34:
  
  1026   Tuesday, October 29, 2024, 18:25 Aaron SchmidtUC#46 (assembly only)LP-IG-LISITWTM4 42972-6 / 39956-1In progressConditioning UC#46 Assembly 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20:
Roughing. 
  
  1027   Thursday, October 31, 2024, 13:53 Aaron Schmidt      In progressChamber empty & Fix IG6 Thursday, October 31, 2024, 13:53:
Roughing down empty chamber. U-Line installed.

Monday, November 04, 2024,
  
  1029   Wednesday, November 13, 2024, 14:36 Aaron SchmidtUC#(47) - Not includedLP-SISITETM344691-845235-24In progressConditioning UC#47 (Assembly only)Gas line is attached. 
Wednesday, November 13, 2024, 14:18:
Roughing.
 UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx 