Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  Test-Stand, Page 52 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Tuesday, February 06, 2024, 11:48, Aaron Schmidt, SiC# (Stock), HP-SIS, , , 41369-2, 45235-14, In progress, Conditioning (Stock SiC-24C) SiC HP-SIS 

Tuesday, February 06, 2024, 11:45: Roughing.

Tuesday, February 06, 2024, 13:27: TP1B on.

Tuesday, February 06, 2024, 13:33: TP1A on.

Tuesday, February 06, 2024, 13:47: IG1 on.


Wednesday, February 07, 2024, 06:54: Vacuum @ 7.55e-07T.

Wednesday, February 07, 2024, 06:56: PS on. FS#5 open. Vacuum stable.

Wednesday, February 07, 2024, 06:58: Coil jumped from 0A with the breaker off to 200 A w/ 4.2 V.

Wednesday, February 07, 2024, 06:59: Coil PS switched on. Increase coil current to 75 A & back down again. No change. Will need to trouble shoot this once this target is complete.

Wednesday, February 07, 2024, 07:04: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. Good vac / bad vac settings set back to 5.00e-06T / 7.00e-06T. Note: The TS will trip at 1.00e-05T.

Wednesday, February 07, 2024, 07:09: FC0 still acting up. Optics on.

Wednesday, February 07, 2024, 10:28:  Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Wednesday, February 07, 2024, 12:10: IV4 open.

Wednesday, February 07, 2024, 12:14: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Wednesday, February 07, 2024, 12:15 : Opening & Closing FC0 for a measurment does not interfere with IV4.

Wednesday, February 07, 2024, 12:42: One audible spark. Knocked out TMS : Q2/Q5. Reset.

Wednesday, February 07, 2024, 13:34: Mass & Wire scans complete with 2 tunes. Ok.


Thursday, February 08, 2024, 09:02: Auto-cooling @ 2A per min.


Coil PS removed. (See elog 995)

Friday, February 16, 2024, 04:57: IV4 closed

Friday, February 16, 2024, 04:58: IG1 & TP off.

Entry  Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue 

Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid was replaced recently on January 18th. Requires replacement. (ordered)

Reference: https://elog.triumf.ca/TIS/Test-Stand/990

Stores PN: 01-7/01026

Valve, Solenoid, 24 Volt 5 Port

Entry  Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue Coil_PS_Control_Card.png

15-02-2024

The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.

See attached image.


New PS was installed on Friday.

Tuesday, February 20, 2024, 08:01: Check Coil  not responding.

Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.

Coil set to 15 A, did not adjust.

Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.

Fixed*

 

Entry  Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docxHP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docxStock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx

Friday, February 16, 2024, 10:30: Roughing

Friday, February 16, 2024, 17:38: TP1B on. 

Friday, February 16, 2024, 17:47: TP1A on. 

Friday, February 16, 2024, 17:55: IG1 on. New Coil PS was installed.


Tuesday, February 20, 2024, 07:51: Waterline FS#5 open.

Tuesday, February 20, 2024, 07:58: Cage closed. PS on.

Tuesday, February 20, 2024, 08:01: Check. TGHT / TBHT manually to 5 / 5 A. Coil & Anode not responding.

Tuesday, February 20, 2024, 09:40: Pressure gauge reconnected within cage. Gas lines purged, refilled with argon. SV5 closed.

Tuesday, February 20, 2024, 09:48: System check 2: TGHT / TBHT manually to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 50 V.

Coil set to 15 A, did not adjust.

Tuesday, February 20, 2024, 12:04: Coil PS SW1-7 switch in was in an "Off" position & wouldn't allow the voltage signal through to the PS. Switched to "on". Coil tapped to 7 A manually & back to 0 A ok.

Tuesday, February 20, 2024, 12:24: SV4 open. SV5 is closed. Cage is closed.

Tuesday, February 20, 2024, 12:26: All power & sources on.

Tuesday, February 20, 2024, 12:29: Optics on & set w/ updated tune.

Tuesday, February 20, 2024, 12:56: PS off to switch to Cathode BIAS mode.

Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D. Cage closed up. PS on.

Tuesday, February 20, 2024, 14:52: Anode/Cathode short. PS off & remove the cage again.

Tuesday, February 20, 2024, 15:20: IG1 off. Chamber TP off.


Wednesday, February 21, 2024, 07:30: Venting.

Wednesday, February 21, 2024, 08:32: Short found on waterlines (E) to (D)

Wednesday, February 21, 2024, 08:34: IG1 Bypass in effect.

Wednesday, February 21, 2024, 08:37: BIAS / EE / EZL to 1 / -0.5 / 0.5 kV. Note* If voltage is put on the EE before the BIAS, a small amount of voltage also goes to the BIAS. To keep an eye on. Back to 0 V.

Wednesday, February 21, 2024, 08:40: Coil to 5 A, Anode to 50 V. OK. Back to 0 A / V

Wednesday, February 21, 2024, 08:41: TGHT / TBHT both to 5 / 5 A ok. Back to 0 A. All checks ok.

Wednesday, February 21, 2024, 08:42: IG1 Bypass removed.

Wednesday, February 21, 2024, 09:14: TP1B on.

Wednesday, February 21, 2024, 09:22: TP1A on.

Wednesday, February 21, 2024, 09:31: IG1 on.

Wednesday, February 21, 2024, 14:00: HV & Coil checks. OK. IV4 open.


Thursday, February 22, 2024, 08:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, February 22, 2024, 08:23: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, February 22, 2024, 08:26:  BIAS / EE / EZL @ 45 / -2.0 / 19 kV. 2 large sparks on the tap up.

Thursday, February 22, 2024, 08:42: BIAS / EE / EZL @ 47.5 / -2.0 / 22 kV. Small sparks on the tap up

Thursday, February 22, 2024, 09:00: BIAS / EE / EZL @ 50 / -2.0 / 25 kV. Sparks on the tap up.

Thursday, February 22, 2024, 09:10: One spark. Reset steering & optics.

Thursday, February 22, 2024, 09:17: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, February 22, 2024, 09:39: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.13e-07.

Thursday, February 22, 2024, 12:06: Coil @ 0 A

Thursday, February 22, 2024, 12:10: Anode @ 100 V.

Thursday, February 22, 2024, 12:12: Anode @ 200 V.

Thursday, February 22, 2024, 12:16: Anode @ 500 V.

Thursday, February 22, 2024, 12:26: Anode @ 0 V.

Thursday, February 22, 2024, 12:38: BIAS / EE / EL @ 0 kV.

Thursday, February 22, 2024, 12:58: Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min. 

Thursday, February 22, 2024, 16:25: Vacuum @ 1.16e-06T. Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Thursday, February 22, 2024, 18:35: TGHT / TBHT @ 580 / 290 A. 

Thursday, February 22, 2024, 18:45: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. FC0 @ 100nA = 7.71e-09 

Thursday, February 22, 2024, 18:48: Anode @ 100 V. Coil to 10 A. FC0 @ 100nA = 6.82e-09 

Thursday, February 22, 2024, 19:00: FC0 is stuck!!!. However it is not releasing HPA? Confirmed by the MCR over MS teams video chat. IV4 Closed. (Angry tech noises)

Thursday, February 22, 2024, 19:02: BIAS/ EE / EZL @ 0 KV. Anode & Coil to 0. 

Thursday, February 22, 2024, 19:07: Auto-cooling @ 2 A per minute. 

Thursday, February 22, 2024, 19:08: Closed SV4 & SV5. 


Friday, March 08, 2024, 06:59: Issues with FC0 & RP2 resolved. Soft start on TP6 initiated.

Friday, March 08, 2024, 07:06: Gas lines filled with Argon.

Friday, March 08, 2024, 07:08: Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A

Friday, March 08, 2024, 07:32: TBHT @ 41 A. TGHT @ 0 A?

Friday, March 08, 2024, 07:35: TGHT PS was physically off (Why???). Turned on. Manually tapped up to 25 A. Ok. Auto-ramping TGHT / TBHT @ 2 A per min to 350 / 200 A.

Friday, March 08, 2024, 08:05: TP6 tripped. Half way spun up. Soft start restarted.

Friday, March 08, 2024, 08:47: TP6 at speed. TP2 on.

Friday, March 08, 2024, 08:52: IG6 on.

Friday, March 08, 2024, 09:05: Optics on. Quick checks on BIAS / EE / EZL, Cathode (Anode), & Coil OK. 

Friday, March 08, 2024, 09:33: IV4 open. 

Friday, March 08, 2024, 10:18: Vacuum @ 2.43e-07T. Halted auto-ramping. Increase. Auto-ramping TGHT / TBHT @ 2 A per min to 580 / 290 A.

Friday, March 08, 2024, 13:35: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. 

Friday, March 08, 2024, 15:59: Mass & wire scans complete. Appear the anode PS is likely positive. Auto-cooling @ 2 A per min.  

Friday, March 08, 2024, 16:04: HV off. Gases closed. 


Monday, March 11, 2024, 23:09: Auto-ramping TGHT / TBHT to 580 / 290 A @ 1 A per min. 


Tuesday, March 12, 2024, 09:45: Gas on.

Tuesday, March 12, 2024, 09:51: BIAS / EE / EZL @ 30 / -1.5 / 13

Tuesday, March 12, 2024, 10:36: Anode @ 100 V. Coil @ 20 A.

Tuesday, March 12, 2024, 11:19: Mass & Wire scans complete.

Tuesday, March 12, 2024, 13:51: EE at -2.5. mass scan

 Tuesday, March 12, 2024, 13:55: EE at -1.5. Coil at 0A. mass scan

Tuesday, March 12, 2024, 14:11: Coil at 20A, TSH:ANODE at  0V. mass scan 

Tuesday, March 12, 2024, 14:30: coil and anode on. gas turned off. 

Tuesday, March 12, 2024, 16:59: decreasing bias 

Tuesday, March 12, 2024, 17:07 decreasing TBHT TGHT to 0, 1A/s 

Entry  Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode 

Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.


Monday, March 11, 2024, 13:59: Power supply polarity switched to negative.

Entry  Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 

Monday, February 26, 2024, 10:12:

While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.


Thursday, February 29, 2024, 13:10: Backing pressure still had not stabilized. RP2 removed & taken to Vacuum Group.


Wednesday, March 06, 2024, 10:28:

Tip seals were replaced by Vacuum Group. Roughing.

Wednesday, March 06, 2024, 10:31: TMS:TP6 & TMS:TP2 on.

Wednesday, March 06, 2024, 10:49: TP6 has tripped twice. TP2 ok.

Wednesday, March 06, 2024, 12:25: Venting. TP6 is not operating above 3 krpm.

Vacuum Group acquired TP6. It was nearly seized.

Wednesday, March 06, 2024, 14:57: Varian 551 pump installed from the furnace behind the TS. Roughing.


Friday, March 08, 2024, 06:58: Soft start initiated.

Friday, March 08, 2024, 08:47: TP6 at speed.

Entry  Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed. 

Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed.

Entry  Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx

Tuesday, April 09, 2024, 15:25: Roughing.


Wednesday, April 10, 2024, 05:41: TP1B on. 

Wednesday, April 10, 2024, 05:47: TP1A on. 

Wednesday, April 10, 2024, 06:01: IG1 on. 

Wednesday, April 10, 2024, 12:21: Waterline FS#5 open. Vacuum stable @ 1.23e-06T.

Wednesday, April 10, 2024, 12:25: Power / sources on.

Wednesday, April 10, 2024, 12:32: TGHT / TBHT @ 5/5A tapped up & back down manually. Ok.

Wednesday, April 10, 2024, 12:33: Anode @ 25 V, Coil @ 10 A. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:35: BIAS / EE / EZL @ 1 / -0.5 / 1 kV. Tapped up & down manually. Ok.

Wednesday, April 10, 2024, 12:37: Vacuum @ 1.19e-06T. Ok, but will allow to drop further.


Thursday, April 11, 2024, 10:21: Gas lines open.

Thursday, April 11, 2024, 10:34: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 10:38: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, April 11, 2024, 10:41: Significant sparking for about 5 seconds. BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:42: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Thursday, April 11, 2024, 10:46: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV. Sparking again. On the spark gap.

Thursday, April 11, 2024, 10:56: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Thursday, April 11, 2024, 11:26: 30 minutes @ 50 kV. 2 sparks in that time. The second spark tripped the optics & IG6. They were reset.

Thursday, April 11, 2024, 11:31: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 11, 2024, 11:38: HV tapped to 0 kV.

Thursday, April 11, 2024, 11:39: Vacuum @ 8.27e-07T.

Thursday, April 11, 2024, 13:03: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 8.16e-07T.

Thursday, April 11, 2024, 13:26: Coil @ 80 A. Tapped up manually at 4 A per min approx.

Thursday, April 11, 2024, 13:28: Vacuum @ 1.01e-06T

Thursday, April 11, 2024, 13:57: Vacuum @ 2.96e-06T

Thursday, April 11, 2024, 14:19: Coil @ 0 A.

Thursday, April 11, 2024, 14:21: Anode @ 100 V.

Thursday, April 11, 2024, 14:22: Anode @ 200 V.

Thursday, April 11, 2024, 14:24: Anode @ 500 V.

Thursday, April 11, 2024, 14:28: Anode @ 0 V.

Thursday, April 11, 2024, 14:32: HV to 0 kV.


Friday, April 12, 2024, 06:30: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Friday, April 12, 2024, 13:23: Auto-ramping aborted. TGHT @ 556 A, Vacuum @  4.94e-06T. Allow 20 min for stabilization.

Friday, April 12, 2024, 13:44: Auto-ramping TGHT to 580 A @ 2 A per min. Vacuum @ 4.57e-06T. 

Friday, April 12, 2024, 14:15: Aborted auto-ramp. Vacuum @ 5.20e-06T. Will manually tap up. 

Friday, April 12, 2024, 14:32: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 5.31e-06T. The extraction electrode is acting up. Doubling the voltage on what is input. Add 50 V on the slider, 100 V will go to the readback. 

Friday, April 12, 2024, 14:49: HV back to 0 kV. 

Friday, April 12, 2024, 15:12: EE Troubleshooting. Cage open & multiple tests to adjust the voltage.

Friday, April 12, 2024, 15:19: Auto-cooling @ -2 A per min 

Entry  Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues 

Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However it would slowly trickle downward. elog:1002.

Tom H. had a look at it this afternoon & determined the PS is operating, however the signal going to it is peculiar. Controls group as been notified as well. Awaiting further response.


Tuesday, April 16, 2024, 16:09: Full epics & PLC restart needed. All TP & RP shut down.

Tuesday, April 16, 2024, 17:45: Restart RP. TP1B on. TP6 & TP2 on.

Tuesday, April 16, 2024, 17:49: TP1A on.

Tuesday, April 16, 2024, 17:55: Restarted TP6.

Tuesday, April 16, 2024, 18:05: Long sigh* TP6 was in soft start mode. Controller put back to regular start. TP6 started.

Tuesday, April 16, 2024, 18:08: IG1 & IG6 on.


Wednesday, April 17, 2024, 10:25: IG, TP, & RP, off.

Wednesday, April 17, 2024, 13:03: RP on.

Wednesday, April 17, 2024, 13:14: TP1A on.

Wednesday, April 17, 2024, 13:07: TP6, TP2, & TP1B on.

Wednesday, April 17, 2024, 13:23: IG6 & IG1 on.

Wednesday, April 17, 2024, 13:25: EE to -500V. Read back on Epics -500V. PS direct @ -500V

Wednesday, April 17, 2024, 13:26: EE to -1500V. Read back on Epics -1500V. PS direct @ -1500V

Wednesday, April 17, 2024, 14:07: EE was brought back to 0V. ISAC TS closed up & ready for operation.

 

Entry  Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx

https://elog.triumf.ca/TIS/Test-Stand/1003

EE Issue resolved. TS closed up.

Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.

Wednesday, April 17, 2024, 14:12: TGHT / TBHT manually tapped up to 5 / 5 A.

Wednesday, April 17, 2024, 14:13: BIAS / EE / EZL @ 2.5 / -1.0 / 1.0 kV. Ok.

Wednesday, April 17, 2024, 14:15: Anode to 100 V. Ok. Coil PS is still.

Wednesday, April 17, 2024, 14:19: Rear cage reopened. Coil PS on. Coil @ 5 A. Ok. Gas on in the morning.

Wednesday, April 17, 2024, 14:21: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. Coil back to 0 A.


Thursday, April 18, 2024, 05:57: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. 

Thursday, April 18, 2024, 08:26: Gas lines purged & reopened full of Ar.

Thursday, April 18, 2024, 08:39: Optics set with common tune.

Thursday, April 18, 2024, 08:48: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, April 18, 2024, 08:50: Begin mass & wire scans w/o Anode & Coil

Thursday, April 18, 2024, 08:55: MB1 appears to be tripped & out of sync.

Thursday, April 18, 2024, 08:57: Switched MB1 PS off, controller off. Restart them. PS on, then controller. Reset on epics & Can Diagnostics TMS:HallMB1 (cfg)

Thursday, April 18, 2024, 08:59: MB1 ready. Continue testing / mass scan.

Thursday, April 18, 2024, 09:37: Anode to 100 V. Coil to 20 A.

Thursday, April 18, 2024, 10:15: Set optics to Dave's previous tune.

Thursday, April 18, 2024, 10:49: Primary mass & wire scans set complete.

Thursday, April 18, 2024, 11:01: Anode & Coil to 0. Scanning w/ Dave's previous tune.

Thursday, April 18, 2024, 11:52: BIAS / EE / EZL to 0 kV. Gas lines closed. IV4 closed.

Thursday, April 18, 2024, 11:53: Begin auto-cooling @ 2 A per min.


Friday, April 19, 2024, 06:56: Power off. IG1 off. TP1B & TP1A off.  

Friday, April 19, 2024, 09:03:   VV1 open -  venting 

Entry  Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7 

FM-SW calibrated leak installed.

Friday, April 26, 2024, 13:48: Roughing.

Friday, April 26, 2024, 14:20: TP1B started.

Friday, April 26, 2024, 14:26: TP1B Green. OK.

Friday, April 26, 2024, 14:30: TP1A on.


Monday, April 29, 2024, 08:44: Vacuum @ 4.58e-07T. Waterline FS#5 open. Vacuum ok.

Monday, April 29, 2024, 08:50: Power / sources on. Tap up check. TGHT / TBHT to 5 / 5 A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. Anode to 100 V. Coil to 4 A. Ok. Tap back down.

Monday, April 29, 2024, 10:44: IV4 open.

-BB:

Monday, April 29, 2024, 11:07: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, April 29, 2024, 11:12: BIAS / EE / EZL @ 40 / -1.8 -2.0 / 17 kV.

Monday, April 29, 2024, 11:19: BIAS / EE / EZL @ 43 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:23: BIAS / EE / EZL @ 45 / -2.0 / 19 kV.

Monday, April 29, 2024, 11:27: BIAS / EE / EZL @ 47.5 / -2.2 / 22 kV.

Monday, April 29, 2024, 11:33: BIAS / EE / EZL @ 50 / -2.5 / 25 kV.

Monday, April 29, 2024, 12:05: 30 minutes @ 50 kV. 3 sparks at the very end. 2 inside and 1 outside.

Monday, April 29, 2024, 12:09: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. Vacuum @ 4.67e-07T. Start tapping up coil.

Monday, April 29, 2024, 12:32: Coil @ 80 A. Tapped up manually at 4 A per min approx. Vacuum @ 5.2e-07T

Monday, April 29, 2024, 14:00: Vacuum @ 7.20e-07T (30-60 min depending on whether the out gassing levels or begins to decrease)

Monday, April 29, 2024, 14:02: Coil @ 0 A.

Monday, April 29, 2024, 14:05: Anode @ 100 V.

Monday, April 29, 2024, 14:07: Anode @ 200 V.

Monday, April 29, 2024, 14:09: Anode @ 500 V.

Monday, April 29, 2024, 14:11: Anode @ 0 V.

Monday, April 29, 2024, 14:33: HV @ 0 V.

Monday, April 29, 2024, 14:34: Auto-ramping TGHT / TBHT to 350 / 150 @ 2A per minute.


Tuesday, April 30, 2024, 07:18: Auto-ramping TGHT / TBHT to 580 / 290 @ 2A per minute. 

Tuesday, April 30, 2024, 13:44: Gas lines purged & refilled with Ar.

Tuesday, April 30, 2024, 13:48: optics set.

Tuesday, April 30, 2024, 13:51: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, April 30, 2024, 13:56: Anode @ 100 V. Coil @ 20 A

Tuesday, April 30, 2024, 13:59: Reset / Cfg MB1

Tuesday, April 30, 2024, 14:40: Initial mass & wire scans complete.

Tuesday, April 30, 2024, 15:07:  Argon gas lines purged. 

Tuesday, April 30, 2024, 15:07:  Mass scan repeated.

Tuesday, April 30, 2024, 15:42:   Gas on. Magnet set to 40.1 mass/charge. Anode & coil vs fc6 output optimization scan started. 0-90A coil and 0-400V anode.

Tuesday, April 30, 2024, 15:55:   Vacuum is noticeably rising. If it reaches 5e-6T, will terminate the scan.

Tuesday, April 30, 2024, 15:59:  rate of increase appears to be slowing and reaching a plateau.

Tuesday, April 30, 2024, 16:01:    optimization data at measure_id=6058.  image at bottom.

Tuesday, April 30, 2024, 16:03: COIL and anode set to 0. decreasing BIAS/EZL/EE to 0V

Tuesday, April 30, 2024, 16:12: decreasing TGHT TBHT at 1A/30s to 0

 Wednesday, May 01, 2024, 09:38:   TP1B and TP1A turned off, winding down

 Wednesday, May 01, 2024, 10:1: VV1 open, venting.  Water cooling off. purged lines

 

 

 

Entry  Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD 

Anode short repaired (Should be :) )

Thursday, May 30, 2024, 15:56: Roughing.

Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.

Bypassed IG1. TGHT / TBHT @ 5 A. Ok.

Anode to 100 V. Ok.

Thursday, May 30, 2024, 16:12: TGHT / TBHT / Anode to 0. Bypass removed.

Thursday, May 30, 2024, 16:26: TP1B on.

Thursday, May 30, 2024, 16:33: TP1A on.

Thursday, May 30, 2024, 16:41: IG1 on.


Friday, May 31, 2024, 08:50: Anode to 400 V. OK. Tapped back down. Vacuum @ 5.07e-07T 

Friday, May 31, 2024, 09:12   increasing TGHT TBHT to 440 230A at 1A/30s- dn

 Friday, May 31, 2024, 10:20  at ~130A, increased heating rate to 1.4A/10s - dn

 Friday, May 31, 2024, 11:22  anode increased to 200V, TGHT TBHT at 440 230A.  increasing TBHT to 290A

Friday, May 31, 2024, 11:38  ANODE shorted to hvc at TBHT=286A

Friday, May 31, 2024, 11:39  decreased TBHT to 285A. waiting to reestablish ANODE voltage.

Friday, May 31, 2024, 11:48 decreased TBHT to 280A, waiting to reestablish ANODE voltage. 

 Friday, May 31, 2024, 12:59 decreased TBHT to 275A, waiting to reestablish ANODE voltage.  

Friday, May 31, 2024, 12:09 decreased TBHT to 270A, waiting to reestablish ANODE voltage.  ---> recovered after 2 min at 270

Friday, May 31, 2024, 14:09 decreased TGHT TBHT to 0 for target removal monday.

Monday, June 03, 2024, 09:04 TP1A TP1B off. Waiting 30min for turbo pumps to slow, prior to venting to atmosphere.

 Monday, June 03, 2024, 10:07 venting. VV1 open. - target subsequently removed for testing possible shorting fix

Friday, June 14, 2024, 16:37:  Ceramic spacer placed between the anode and plasma electrode.

Target returned to test stand. Rough vacuum on.

Monday, June 17, 2024, 09:34:  TP1A on, TP1B on.

 Monday, June 17, 2024, 16:54  increasing tght tbht to 440 230 A at 1A/30s

 Tuesday, June 18, 2024, 14:14 Increasing ANODE to 100V .    Voltage holding.  Increasing TBHT to 290A, watching anode voltage for possible temperature induced short.

 Tuesday, June 18, 2024, 14:54   ANODE shorted at TBHT = 290A.   cooling TBHT to reestablish ANODE OL.

Tuesday, June 18, 2024, 15:04 ANODE OL reestablished at TBHT = 283A

Tuesday, June 18, 2024, 15:05  Increasing TBHT again. 1A/2min

Tuesday, June 18, 2024, 15:32 ANODE shorted again when TBHT reached 290A

Tuesday, June 18, 2024, 15:32   cooling tght tbht. ANODE OL reestablished at TBHT 275A

Tuesday, June 18, 2024, 15:42 reheating to 440A 290A with ANODE at zero, to see if there is a difference compared to heating with ANODE ON/OFF

 Tuesday, June 18, 2024, 15:55  confirmed shorted when hot. cooling to zero. 1A/30s

 

 

Entry  Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7 

Wednesday, July 31, 2024, 18:47: Roughing.

Wednesday, July 31, 2024, 19:24: TP1B on.

Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.

Wednesday, July 31, 2024, 19:33: TP1A Started. CG1A @ 0.164T.

Wednesday, July 31, 2024, 19:41: TP1A at speed. Whining a bit, but it's alive.

Wednesday, July 31, 2024, 19:42: IG1 on.


Thursday, August 01, 2024, 08:00: Vacuum @ 3.14e-0T. Waterline FS#5 open. Vacuum ok. CG1A @ 0.028T.

Thursday, August 01, 2024, 08:04: IV4 open.

Thursday, August 01, 2024, 08:09: Cage closed up. PS / Sources on. Note* TGHT/TBHT breakers were on. Anode was off. All "On" now.

Thursday, August 01, 2024, 08:13: Manual tap up checks. TGHT / TBHT @ 5 / 5 A. Anode @ 100 V / 15.873 mA. Coil PS acting up. Set to 7 A, displays 9.87A & fluctuates.

Thursday, August 01, 2024, 08:19: Anode to 0 V. Coil reduced to 0 A, however still reads back 4.15 A on epics. PS @ 0A.

Thursday, August 01, 2024, 08:24: Cage open. HV sources off. Coil back to 7A. Epics shows 9.82-10.11A (Blue). Fluctuates, PS direct reading @ 7A - Steady.

Thursday, August 01, 2024, 08:39: Cage closed up. HV sources back on.

Thursday, August 01, 2024, 08:40: BIAS / EE / EZL set to 1 / -0.5 / 1 kV. Anode to 100 V / 15.873 mA. Coil remains @ 7A. Epics 10.35A (Blue) Fluctuates still. PS direct reading @ 7A.

Thursday, August 01, 2024, 08:49: BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Thursday, August 01, 2024, 08:54: BIAS / EE / EZL @ 35 / -1.8 / 15 kV.

Thursday, August 01, 2024, 08:56: BIAS / EE / EZL @ 40 / -2.0 / 17 kV.

Thursday, August 01, 2024, 08:57: 1 Spark. External - Audible.

Thursday, August 01, 2024, 09:01: Anode @ 200 V / 17.094 mA. Vacuum @ 2.75e-06T.

Thursday, August 01, 2024, 09:04: Anode @ 300 V / 18.315 mA.

Thursday, August 01, 2024, 09:05: Anode @ 400 V / 19.536 mA.

Thursday, August 01, 2024, 09:05: Anode @ 500 V / 20.757 mA. Interesting, the coil epics read back (Blue) moved to 6.98 (7) A.The coil read back stability appears to have occurred in conjunction with the 8:57am spark*.

Thursday, August 01, 2024, 09:17: 20 min stable. Can assume the spark was the coil instability discharging. Coil remain stable reading @ 7A. BIAS / EE / EZL @ 40 / -2.0 / 17 kV (20 min). Anode @ 500 V / 19.536 mA. (10 min+).

Thursday, August 01, 2024, 09:29: BIAS / EE / EZL to 0 kV. Anode to 0.

Thursday, August 01, 2024, 09:36: Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 @ per min.

Thursday, August 01, 2024, 09:37: Tap up coil to 10 A. Stable. Read back on all ends match up.

Thursday, August 01, 2024, 09:39: Coil @ 20 A. Stable. Hold. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:05: Coil @ 30 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:13: Coil @ 40 A. Vacuum @ 2.68e-06T.

Thursday, August 01, 2024, 10:18: Coil @ 50 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:24: Coil @ 60 A. Vacuum @ 2.66e-06T.

Thursday, August 01, 2024, 10:27: Coil @ 70 A. Vacuum @ 2.77e-06T.

Thursday, August 01, 2024, 10:32: Coil @ 80 A. Vacuum @ 3.03e-06T. Note* Coil was cleaned prior to installation & acrylic within dissolved. Successful run on coil.

Thursday, August 01, 2024, 10:43: Coil to 0 A. However in the last 20 A, the read back & epics did not match again. Slowly discharging on epics, although the PS read back was accurate.

Thursday, August 01, 2024, 13:29 FBP:  Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min . IG1:3.56e-6.

Thursday, August 01, 2024, 16:00: AS - Aborted target ramping. TGHT / TBHT @ 448 / 248 A. Vacuum limited at 5.0e-06T. Allow to out gas. Continue tomorrow am.


Friday, August 02, 2024, 06:01: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2 A per min. Vacuum: 1.60e-06T.

Friday, August 02, 2024, 08:28 turning on HV

Friday, August 02, 2024, 08:35 BIAS / EE / EZL @ 30 / -1.5 / 13 kV. No issues.

Friday, August 02, 2024, 08:40 Same kind of sparks as the previous thin foil Ta observed

Friday, August 02, 2024, 08:49 Bias lowered to 20kV

Friday, August 02, 2024, 10:39 HV issues could not be identified, we recorded some sparks from within the target near the multipin and TBHT. Outgassing coil and running mass scan. Source tray to be thoroughly checked after retrieving the target. 

Friday, August 02, 2024, 15:04  gradually increased COIL current to 100A over time while monitoring vacuum to ensure no heater trips. Vacuum now at 2.4e-6 T

Friday, August 02, 2024, 15:05 increasing BIAS / EE / EZL to 30 / -1.5 / 13 kV 

Friday, August 02, 2024, 15:26   now at  BIAS / EE / EZL to 30 / -1.5 / 13 kV  --- first spark at 30kV. 

Friday, August 02, 2024, 15:37   sparking occurring at 4-5min intervals. set anode to 120V, coil to 40A. finding Ar peak via scan.   Argon operated at 0.5 bar.

Friday, August 02, 2024, 15:57   Ar peak located at 95.5332A. on magnet. tested gas on / off to confirm - current at FC6 = 1.37 nA

Friday, August 02, 2024, 16:02  ran febiad coil/anode scan. 

Friday, August 02, 2024, 16:33  data at test number = 7462 can be further visualized using the shared jupyter notebook code.  data taken at anode voltage 260V was disrupted due to a spark derailing a number of optics elements in the beamline. they were soon corrected, but this data was missed.

 Friday, August 02, 2024, 16:34   -   mass scan with  180V 70A      (Argon ON) ---- doesn't seem to be recording background noise well. ie the common background recording artifact is present. records constant numbers instead of numbers in range (1e-13,5e-12). often appears in mass scan image at slants 

Friday, August 02, 2024, 17:07    -   mass scan rerun after switching off argon and pumping down the lines. however, only run from mass 49 down, as the signal above was completely blank

Friday, August 02, 2024, 17:25  ramping down bias ee and ezl

 Friday, August 02, 2024, 17:45  decreasing TGHT and TBHT to 0a at 1A/30s

 

 

 

 

Entry  Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues 

Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.

Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.

Vacuum Group LD #2 - Connected to TP1B backing line

Tuesday, August 06, 2024, 15:50: Vacuum @ 3.38e-06T.

Tuesday, August 06, 2024, 15:52: No He connected. 7.0 E-09 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:20: No He connected. 1.1 E-08 atm-cc. LD TP pressure 1.0e-03T.

Tuesday, August 06, 2024, 16:23: Open to chamber. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:26: 20 PSI. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.97e-06T.

Tuesday, August 06, 2024, 16:32: FS#5 Charged with 20 PSI He. 1.6 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:34: Close FS#5

Tuesday, August 06, 2024, 16:35: FS#4 Charged with 20 PSI He. Increase to 2.5 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:42: While purging FS#4 with HPA, an increase of 8.3 E-08 atm-cc was observed. Vacuum @ 2.75e-06T.

Tuesday, August 06, 2024, 16:50: Re-connected He. FS#3 Charged with 20 PSI He. Increase to from 3.6 to 9.0 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Tuesday, August 06, 2024, 16:52: 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:53: Release pressure on FS#3. 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.57e-06T. Line still @ 20 PSI.

Tuesday, August 06, 2024, 16:55: FS#2 Charged with 20 PSI He. Steady @ 5.1 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.59e-06T.

Observed increases on FS#3 & FS4.

Tuesday, August 06, 2024, 17:02: All lines purged with HPA. Allow vacuum to continue down.

Tuesday, August 06, 2024, 17:03: Close off LD to TP1B valve. Dropped to 1.7 E-08 atm-cc. LD TP pressure 1.0e-03T. Vacuum @ 2.48e-06T. Safe to vent LD.

Tuesday, August 06, 2024, 17:06: LD vented & disconnected.


Wednesday, August 07, 2024, 09:15: Vacuum @ 6.43e-07T. Gradually refill the waterlines. 

Wednesday, August 07, 2024, 09:20: FS#5 open. Vacuum remains steady.

Wednesday, August 07, 2024, 09:28: FS#2 open. Vacuum @ 6.38e-07T.

Wednesday, August 07, 2024, 09:30: FS#4 open. Vacuum @ 6.38e-07T. Wait 5 min.

Wednesday, August 07, 2024, 09:35: Vacuum steady @ 6.36e-07T. Occasional dip to 6.27e-07T.

Wednesday, August 07, 2024, 09:36: FS#3 open. Vacuum steady. Wait 5 min.

Wednesday, August 07, 2024, 09:41: No change to vacuum.

While the helium did get through on yesterdays tests as a minor molecular leak, the water does not appear to have an affect. Moving to an empty HV test.

Wednesday, August 07, 2024, 09:53: Vacuum 6.20e-07T.

Wednesday, August 07, 2024, 10:43: Vacuum 6.20e-07T. IG1 & TP off.   -   venting test stand for target installation

 

Wednesday, August 07, 2024, end of day.  mass marker target installed in test stand with side foil removed so the target is visible through the view port. vacuum roughed, then turbo pumps turned on at end of day for overnight pumping

Thursday, August 08, 2024, 09:19 - vacuum at 6.27e-7T. water cooling was switched on. no effect on vacuum. TGHT and TBHT began ramping at 1A/30s. will test high voltage at low heat and at high heat.

 Thursday, August 08, 2024, 10:04   HV at 35kV. No sparks.  TGHT TBHT at <80A throughout HV ramp and plateau

Thursday, August 08, 2024, 10:14    BIAS down.  TGHT TBHT at 100A. increasing ramp rate to 1.7A/10s. heating up to 480/230

 Thursday, August 08, 2024, 13:59  BIAS has slowly been brought to 28kV . no sparks at all, despite being over 24kV for ~50min. 

Thursday, August 08, 2024, 14:00 increasing TGHT to 580A to attempt to induce sparks. 

Thursday, August 08, 2024, 14:42   at TGHT TBHT 580 230, HV bias at 28kV (with EZL and EE at 0 and 0), no sparks at all over the ramp and over 10 minutes at this condition. 

Thursday, August 08, 2024, 14:43 ramping HV to 30kV

Thursday, August 08, 2024, 15:01  - -  no sparks at 30kV.   bringing up EZL to 13kV  (EE=0)

Thursday, August 08, 2024, 15:11   -  no sparks with EZL at 13kV.  bringing up EE to -2500V

Thursday, August 08, 2024, 15:13  - no sparks with EE at -2500kV

 Thursday, August 08, 2024, 15:22   turned on beam optics to observe beam out, but no beam currently detected on FC0, nor on the wire scanners, nor on FC6. This target commonly has a normal beam output of primarily Na and K

Thursday, August 08, 2024, 15:50  have not been able to deduce reason for lack of beam. increasing BIAS to 50kV.

Thursday, August 08, 2024, 15:51  during ramp up, at 38kV, many optics elements tripped and switched off. however, no spark was registered at the strip tool. not sure of the cause for this.

Thursday, August 08, 2024, 15:54  at 38.8kV, a small spark, only registered on BIAS:RDCUR  (no voltage drop), tripped off beam elements prior to FC0 again.

Thursday, August 08, 2024, 16:00 BIAS at 40kV. no sparks apart from those mentioned immediately above. still have not registered any beam on FC0.

 Thursday, August 08, 2024, 16:02 Vacuum pressure has raised from 6.5e-7 to 1.3e-6 T.

Thursday, August 08, 2024, 16:03  just now, there was a spike drop in pressure and optics elements have shut down again. nothing registered on BIAS, EZL, or EE.

 

 

Thursday, August 08, 2024, 16:11   a spark occurred at 43.3 kV

 

 Thursday, August 08, 2024, 16:23  this spark was audible at the test stand --- ie, not inside

 

 

 Thursday, August 08, 2024, 16:51  Saw no indication overall of the same HV sparking issues that we saw with the previous two targets. However, we were unable to generate beam  register any beam output on FC0, FC6, or wire scanners.  And we don't mean 'low signal'. Actually nothing at all.

 

Thursday, August 08, 2024, 16:54   Ramping down TGHT TBHT now

Friday, August 09, 2024, 08:05   turbo pumps off and spinning down in preparation to vent. will remove the inner foil from the target to observe if a change in shine from the target induces sparking as before. 

Friday, August 09, 2024, 08:58   turbo pumps no longer spinning. venting now.

Friday, August 09, 2024, 10:26    foil stripped off the target. there was a hole in the source for gas (febiad/mass marker). This hole is now plugged. reinstalled, roughing.

Friday, August 09, 2024, 11:59   vacuum at 1.2e-5T.  turning on water cooling lines.  no effect on vacuum.

Friday, August 09, 2024, 12:50 heating TGHT TBHT at 1A/30s

Friday, August 09, 2024, 13:47 increasing heating rate to 1.7A/10s, up to 580/230A

Friday, August 09, 2024, 14:42  TGHT TBHT at 550 230,  increasing BIAS to 30kV 

Friday, August 09, 2024, 15:03   BIAS at 30kV.  no sparks other than a single small one at 25kV. No beam detected at FC0, FC6, or wire scanners.

 Friday, August 09, 2024, 15:18 increased BIAS again. there was one spark at 35kV, then it was stable for 8 minutes with no sparks. still no signal on FC0.  This lack of signal is highly irregular, and should not be the case despite being an empty target. Will have to compare to the next target in the test stand. To attempt to correct, we have:

- manually adjusted gain

- reset bias

- flipped polarity back and forth

- confirmed FC in position

- confirmed no flagged power supply issue

- confirmed clear beam line to FC0

- confirmed upsteam optics are tuned appropriately

 

Friday, August 09, 2024, 15:23  cooling target and ramping down HV

 Friday, August 09, 2024, 16:06 TGHT TBHT at 0. turbo pumps off and spinning down.

 

 

Entry  Friday, September 20, 2024, 14:22, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, , Conditioning Ta# 

 https://elog.triumf.ca/TIS/Target+Production/146

Has not run through EVAP2.

Friday, September 20, 2024, 14:04: Roughing.

Friday, September 20, 2024, 14:39: TP1B on

Friday, September 20, 2024, 14:45: TP1A on. 

Friday, September 20, 2024, 14:54: TP1A at speed. IG1 on. 

Monday, September 23, 2024, 16:38   Water cooling on. no effect on vacuum pressure. Pressure at 6.0e-7T

Monday, September 23, 2024, 17:00  Ramping TGHT and TBHT to 580/230A at 1A/30s 

Tuesday, September 24, 2024, 08:58 TGHT at 502A. Ramping program preventing further ramp up do to 'good vacuum' restriction at 1e-6T as outgassing is pushing up the chamber pressure. Increased good vacuum parameter to 5e-6T, resuming ramp up to 580A at 1A/30s.

 Tuesday, September 24, 2024, 11:12:   TGHT TBHT at 580/230A. Increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.

Tuesday, September 24, 2024, 14:16:   mass scan at high voltage completed - 2024-09-24--14-11 LP-Ta-24C - scan 1

Tuesday, September 24, 2024, 14:17     background signal recording problem persists, despite channel change conducted with controls team and Keiko - will continue to investigate switching to current integrators

Tuesday, September 24, 2024, 14:17  ramping up HV BIAS to 50kV for conditioning, alongside increased EZL voltage

Tuesday, September 24, 2024, 17:00  BIAS was stable at 50kV for 30min. no noticeable sparking.   

also noted that the mass scan data was saved incorrectly. however, there are multiple screen captures of the mass scan which clearly detail which peaks are present.

HV elements decreased to zero and target was left hot overnight for outgassing and so beam content can be re-evaluated

Wednesday, September 25, 2024, 10:24    increasing BIAS/EZL/EE to 30/13/2.5 kV slowly.

Wednesday, September 25, 2024, 13:25    two mass scans conducted:  2024-09-25--12-39 LP-Ta-24C - scan 2,   2024-09-25--13-22 LP-Ta-24C - scan 3

Wednesday, September 25, 2024, 13:26   ramping down high voltages. 

Entry  Thursday, October 03, 2024, 16:26, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16 *, , Conditioning Ta#68 

HS note:

Base# 45235-16

Lid# 39956-8

Thursday, October 03, 2024, 16:04: Roughing. IG6? Error?

Thursday, October 03, 2024, 16:24: BV1A open. 

Thursday, October 03, 2024, 16:32: TP1B on

Thursday, October 03, 2024, 16:43: TP1A on.

Thursday, October 03, 2024, 16:51: IG1 on. 

Thursday, October 03, 2024, 20:01: Water cooling on. No effect to vacuum. TGHT TBHT ramping at 1A/30s to 580A/230A


Friday, October 04, 2024, 09:13 : Slowly increasing BIAS/EE/EZL to 30/2.5/13 kV.

Friday, October 04, 2024, 09:30:   problem with TMSIG6 (low pressure sensor in beam line).  Forced on for interlocks temporarily.  

Friday, October 04, 2024, 11:14   mass scanned - FC6 background working.  filename = 2024-10-04--11-11 HP-Ta-24D - scan 3.txt 

Friday, October 04, 2024, 11:14 repeating mass scan.   filename = 2024-10-04--11-40 HP-Ta-24D - scan 4.txt

Friday, October 04, 2024, 11:53 increasing to bias 50kV / ezl 33kV. 

Friday, October 04, 2024, 12:34:  BIAS/EZL at 50/33 kV.  Leaving for HV conditioning.

Friday, October 04, 2024, 12:43   one spark from HV BIAS to ground caused TGHT to trip. Current was restored within 10s. 

Friday, October 04, 2024, 15:31:  decreasing BIAS/EZL to 30/13kV.  Throughout time at high voltage, there were 3 sparks. Two were within 5 minutes of each other, and the last 2 hours proceeded without incident (no sparks)

Friday, October 04, 2024, 15:47  BIAS EZL at 30/13 kV.  running final mass scan. background FC6 appears not to be working again. but then restored.  scan file name = 2024-10-04--16-30 HP-Ta-24D - scan 5.txt

Friday, October 04, 2024, 16:22 decreasing biases to 0V

Friday, October 04, 2024, 16:23  ramping TGHT TBHT to 0/0A at -1A/30s


 Monday, October 07, 2024, 07:58: IV4 closed. IG1 off. TP off.

Monday, October 07, 2024, 08:43: PS off. Waterlines purged. Venting. 

 

 

Entry  Monday, October 07, 2024, 09:54, Aaron Schmidt, , , , , , , , Pump down empty chamber / IG6 fix 

 Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.

Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off.

Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 

 42972-6 Base / 39956-1 Lid

Tuesday, October 29, 2024, 18:20: Roughing. 

Tuesday, October 29, 2024, 18:52: TP1B on. 

Tuesday, October 29, 2024, 18:58: TP1A on.

Tuesday, October 29, 2024, 19:06: IG1 on.


Wednesday, October 30, 2024, 07:23: Vacuum @ 8.25e-07T. Waterline FS#5 open.

Wednesday, October 30, 2024, 07:25: Power on.

Wednesday, October 30, 2024, 07:32: PS for TGHT keeps timing out? Goes red. Won't start. 

Tapped up TBHT to 10 A. TGHT?

Wednesday, October 30, 2024, 08:20: Manually cycled the PS. No longer trips.

Tapped up TGHT to 5 A. OK

Wednesday, October 30, 2024, 08:26: Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min.

Wednesday, October 30, 2024, 14:32: Auto-cooling @ 2 A per min.

 


Thursday, October 31, 2024, 08:30: TP/ IG1 off. 

Thursday, October 31, 2024, 12:52: Venting. 

Entry  Thursday, October 31, 2024, 13:53, Aaron Schmidt, , , , , , , In progress, Chamber empty & Fix IG6 

 Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.


Monday, November 04, 2024, 11:40: Vent beamline. 

Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.

Monday, November 04, 2024, 13:51: TMS:TP2 on. 

Monday, November 04, 2024, 13:57: TMS:TP6 on. TMS:IG6 on.


Tuesday, November 05, 2024, 15:00: Venting Chamber

Tuesday, November 05, 2024, 15:19: IG6 still displaying issues. Contacted Edi, 

Tuesday, November 05, 2024, 15:35: Controller replaced. Switch to Filament 2. IG6 on. Reading 3.73e-07T. 


Wednesday, November 13, 2024, 09:16: IG6 is tripped again. 

Wednesday, November 13, 2024, 09:17: Reset & switched back to Filament 2. There is no filament 1. Reading 3.91e-07T.

Entry  Wednesday, November 13, 2024, 14:36, Aaron Schmidt, UC#(47) - Not included, LP-SIS, ITE, TM3, 44691-8, 45235-24, In progress, Conditioning UC#47 (Assembly only) UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx

Gas line is attached. 

Wednesday, November 13, 2024, 14:18: Roughing.

Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T? 


Thursday, November 14, 2024, 06:23: Venting manually.  

Thursday, November 14, 2024, 06:50: Left line slightly un-seated. Swapped out waterline gaskets. Close. Roughing.

Thursday, November 14, 2024, 07:22: TP1B on. 

Thursday, November 14, 2024, 07:33: Backing pressure below 0.100T. TP1A on. 

Thursday, November 14, 2024, 07:43: TP1A Tripped. Backing pressure @ 0.067T.

Thursday, November 14, 2024, 07:47: TP1B off to bring backing pressure below 0.050T. 

Thursday, November 14, 2024, 07:56: Re-opened & Restarted TP1B

Thursday, November 14, 2024, 08:38: Re-closed. Will have to allow TP to spin down before opening the vent valve to give the interlock a reset. (We should remove that or have a bypass in the future)

Thursday, November 14, 2024, 08:46: Coordinated opening BV1A & BV1B simultaneously from 2 computers to bypass the interlock. Success. TP1B. On & green. TP1A started.  

Thursday, November 14, 2024, 08:52: TP1A at speed (Green) Teamwork makes the dream work!!! IG1 on.

Thursday, November 14, 2024, 13:41: Vacuum @ 1.10e-06T. Waterline FS#5 open. Vacuum ok.

Thursday, November 14, 2024, 13:43: Power / Sources on. 

Thursday, November 14, 2024, 13:46: Checks. TGHT / TBHT to 5/5A. BIAS / EE / EZL to 1 / -0.5 / 1 kV. OK. Tap back down. Allow vacuum to drop further. Ready for operation. 

Thursday, November 14, 2024, 13:48: Open IV4. Timed out. Tighten sensor. Reset. Open IV4. 


Friday, November 15, 2024, 05:25: Vacuum @ 4.23e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 2 A per min. 

Friday, November 15, 2024, 09:01: Vacuum @ 6.01e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Friday, November 15, 2024, 11:46: Optics on. 

Friday, November 15, 2024, 11:54: TGHT tripped completely off & was unable to restart while turning up the HV. Was at 580 A. BIAS / EE / EZL was tapped up to near 27.5 / -1.5 / 13 kV.

Friday, November 15, 2024, 12:05: Verified nothing appears to have burnt up or similar. Unable to begin auto-cooling on TBHT as it requires both heater PS to operate. Will tap down TBHT manually. TGHT is set @ 0A.

Friday, November 15, 2024, 12:11: TBHT tapped down to 0A. 

Friday, November 15, 2024, 12:14: Once at 0 A, the TGHT PS status turned from red to black??? Was able to reset & turn it back on. Brought it up to 5 A. That's different. 

Friday, November 15, 2024, 12:23: Sources PS off. Will re-ramp on Monday.


Monday, November 18, 2024, 07:24: Vacuum @ 2.43e-07T. Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min. 

Monday, November 18, 2024, 09:17: Vacuum @ 2.69e-07T. Auto-ramping TGHT / TBHT to 580 / 230 A @ 2 A per min. 

Monday, November 18, 2024, 13:02: Sources / Optics On.

Monday, November 18, 2024, 13:08: BIAS / EE / EZL to 20 / -1.5 / 13 kV.

Monday, November 18, 2024, 13:10: BIAS / EE / EZL to 27 / -1.5 / 13 kV. 

Monday, November 18, 2024, 13:20: TGHT Shut off again during a mass scan!

Monday, November 18, 2024, 13:22: Restarted TGHT. This is problematic. TGHT @ 580A. 

Monday, November 18, 2024, 13:25: Redo mass scan. 

Monday, November 18, 2024, 13:59: Mass / wire scans complete. HV to 0 kV. 

Monday, November 18, 2024, 14:00: Auto-cooling @ 2 A per min.


Tuesday, November 19, 2024, 10:04: IV4 closed

Tuesday, November 19, 2024, 10:06: Sources off.

Tuesday, November 19, 2024, 10:07: IG1 & TP off. 

Tuesday, November 19, 2024, 11:16: Power off / lockout. FS#5 purged. Venting. 

ELOG V2.9.2-2455