Entry  Tuesday, February 06, 2024, 11:48, Aaron Schmidt, SiC# (Stock), HP-SIS, , , 41369-2, 45235-14, In progress, Conditioning (Stock SiC-24C) SiC HP-SIS 
Tuesday, February 06, 2024, 11:45: Roughing.
Tuesday, February 06, 2024, 13:27: TP1B on.
Tuesday, February 06, 2024, 13:33: TP1A on.
Entry  Tuesday, February 06, 2024, 14:09, Aaron Schmidt, , , , , , , Problems/Solutions, FC0 Solenoid issue 
Tuesday, February 06, 2024, 14:06: Attempted to 'Close' FC0. While it succeeded in moving into position, HPA rushed out of the exhaust. This solenoid
was replaced recently on January 18th. Requires replacement. (ordered)
Reference: https://elog.triumf.ca/TIS/Test-Stand/990
Entry  Friday, February 16, 2024, 05:03, Aaron Schmidt, , , , , , , Problems/Solutions, Coil PS issue Coil_PS_Control_Card.png
15-02-2024
The coil PS control card is fried. Roughly since the beginning of December. The PS was removed.
See attached image.
Entry  Friday, February 16, 2024, 10:30, Aaron Schmidt, SiC# (Stock), HP-FEBIAD, , , 45447-4, 45235-21, In progress, Conditioning stock SiC HP FEBIAD Stock_SiC_Elog_996_HP-FEBIAD_Cathode_BM_-_HV_&_Coil.docxHP-FEBIAD_Elog_996_-_Ramp_up_&_mass_scans.docxStock_SiC_Elog_996_HP-FEBIAD_Cathode_BIAS_mode_-_2.docx
Friday, February 16, 2024, 10:30: Roughing
Friday, February 16, 2024, 17:38: TP1B on. 
Friday, February 16, 2024, 17:47: TP1A on. 
Entry  Tuesday, February 20, 2024, 14:22, Aaron Schmidt, , , , , , , , Set to Cathode BIAS Mode 
Tuesday, February 20, 2024, 14:20: TS to wired to Cathode BIAS mode as per ISK4563D.

Monday, March 11, 2024, 13:59: Power supply polarity switched to negative.
Entry  Monday, February 26, 2024, 10:24, Aaron Schmidt, , , , , , , Problems/Solutions, TMS:RP2 purge. TS exhaust clearing. + TMS:TP6 
Monday, February 26, 2024, 10:12:
While attempting to cycle FC0, noticed that the turbo pumps TMS:TP6 & TMS:TP2 were off, with TP2 being tripped off. The vacuum on TMS:CG2A
sat around 0.825T although RP2 was running. The ballast plug has since been removed to allow for a 2 hour purge of the roughing pump.
Entry  Tuesday, April 09, 2024, 15:28, Aaron Schmidt, , , , , , , , Set to Anode BIAS Mode & Old gas leak installed. 
Switched to Anode mode on March 28 including polarity. The old calibrated leak was also re-installed.
Entry  Tuesday, April 09, 2024, 16:01, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use EE_issue_-_Conditioning_LP-FEBIAD_ITW-TM4.docx2024_-_ITW-_TM4_LP_FEBIAD.docx
Tuesday, April 09, 2024, 15:25: Roughing.

Wednesday, April 10, 2024, 05:41: TP1B on. 
Wednesday, April 10, 2024, 05:47: TP1A on. 
Entry  Monday, April 15, 2024, 14:35, Aaron Schmidt, , , , , , , Problems/Solutions, TSH:EE Issues 
Monday, April 15, 2024, 14:33: On Friday it was noted that the EE was being troublesome. If we put -500 V on the EE the PS would deliver -1000 V. However
it would slowly trickle downward. elog:1002.
Entry  Wednesday, April 17, 2024, 14:16, Aaron Schmidt, Empty (Online), LP-FEBIAD, ITW, TM4, 45447-24, 42972-8, In progress, Conditioning empty FEBIAD for online use - Run 2 2024_-_ITW-_TM4_LP_FEBIAD_-_2.docx
https://elog.triumf.ca/TIS/Test-Stand/1003
EE Issue resolved. TS closed up.
Wednesday, April 17, 2024, 14:08: IV4 opened. Vacuum @ 5.26e-07T.
Entry  Friday, April 26, 2024, 13:49, Aaron Schmidt, TiC#7, HP-FEBIAD, ITW, TM4, 45447-5, 45235-15, In progress, Conditioning TiC#7 
FM-SW calibrated leak installed.
Friday, April 26, 2024, 13:48: Roughing.
Friday, April 26, 2024, 14:20: TP1B started.
Entry  Thursday, May 30, 2024, 16:00, Aaron Schmidt, , LP-FEBIAD, , , 44692-4, 45235-18, In progress, Conditioning spare FEBIAD 
Anode short repaired (Should be :) )
Thursday, May 30, 2024, 15:56: Roughing.
Thursday, May 30, 2024, 16:10: Waterline FS#5 open. Vacuum ok & roughing down.
Entry  Wednesday, July 31, 2024, 18:50, Aaron Schmidt, TiC Spare, HP-FEBIAD, ITW, TM4, 45447-2, 42752-7, In progress, Conditioning Spare for TiC#7 
Wednesday, July 31, 2024, 18:47: Roughing.
Wednesday, July 31, 2024, 19:24: TP1B on.
Wednesday, July 31, 2024, 19:30: TP1B at speed. Backing pressure CG1A @ 0.212T.
Entry  Tuesday, August 06, 2024, 15:50, Aaron Schmidt, , , , , , , Problems/Solutions, TS Troubleshooting - Leak/HV spark issues 
Due to HV sparking & possible water leaks on the previous TiC & Ta targets, checks are to be performed.
Chamber is empty. U-Line installed. All waterlines purged. FS#2, 3, 4, & 5 are closed.
Vacuum Group LD #2 - Connected to TP1B backing line
Entry  Friday, September 20, 2024, 14:22, Aaron Schmidt, Ta#, LP-SIS, ITE, TM2, 45447-18, 45235-13, , Conditioning Ta# 
 https://elog.triumf.ca/TIS/Target+Production/146
Has not run through EVAP2.
Friday, September 20, 2024, 14:04: Roughing.
Entry  Thursday, October 03, 2024, 16:26, Aaron Schmidt, Ta#68, HP-SIS, ITE, TM2, 45447-26, 45235-16 *, , Conditioning Ta#68 
HS note:
Base# 45235-16
Lid# 39956-8
Entry  Monday, October 07, 2024, 09:54, Aaron Schmidt, , , , , , , , Pump down empty chamber / IG6 fix 
 Monday, October 07, 2024, 09:54: Roughing. U-Line installed on HS waterline.
Monday, October 07, 2024, 10:34: Vent Chamber. TP6 & TP2 off.
Entry  Tuesday, October 29, 2024, 18:25, Aaron Schmidt, UC#46 (assembly only), LP-IG-LIS, ITW, TM4, , 42972-6 / 39956-1, In progress, Conditioning UC#46 Assembly 
 42972-6 Base / 39956-1 Lid
Tuesday, October 29, 2024, 18:20: Roughing. 
Tuesday, October 29, 2024, 18:52: TP1B on. 
Entry  Thursday, October 31, 2024, 13:53, Aaron Schmidt, , , , , , , In progress, Chamber empty & Fix IG6 
 Thursday, October 31, 2024, 13:53: Roughing down empty chamber. U-Line installed.

Monday, November 04, 2024, 11:40: Vent beamline. 
Monday, November 04, 2024, 13:40: 1/2 operating filament spare provided & installed. Roughing beamline section.
Entry  Wednesday, November 13, 2024, 14:36, Aaron Schmidt, UC#(47) - Not included, LP-SIS, ITE, TM3, 44691-8, 45235-24, In progress, Conditioning UC#47 (Assembly only) UC#47_empty_conditioning_test_1_-_Failed.docxUC#47_empty_conditioning_test_2.docx
Gas line is attached. 
Wednesday, November 13, 2024, 14:18: Roughing.
Wednesday, November 13, 2024, 18:20: Closed backing valves. Vacuum @ 2.140 T? 