  Test-Stand, Page 48 of 53  Not logged in ELOG logo
Entry  Thursday, January 10, 2019, 11:38, Aaron Schmidt, , , , , , , , Power outtage prep 

Thursday, January 10, 2019, 11:32: Power down TS. Lock out.

Thursday, January 10, 2019, 11:36: RGA switched off full.

Thursday, January 10, 2019, 11:38: All ion gauge and turbos off. BV's closed.


Friday, January 11, 2019, 07:30: Vent TS.

Friday, January 11, 2019, 08:10: Purge FS#5 waterlines and close off main supply / return.

Friday, January 11, 2019, 08:12: Closed PV1 & PV2. Shut off the roughing pumps.

Entry  Monday, January 14, 2019, 09:47, Aaron Schmidt, , , , , , , , TS restart after power outage 

Monday, January 14, 2019, 09:00: Epics white out

Ref: Fault report  11993 (11981 & 11817)

Monday, January 14, 2019, 09:35: Vacuum page came back. Restarted Roughing pumps. All other pages still in whiteout state.


Wednesday, January 16, 2019, 14:05: FEBIAD installed. Turbo pumps on for Beamline side. Roughing Chamber. Vacuum contols working. All else still in 'whiteout'


Monday, January 21, 2019, 10:30: Epics whiteout state ended. IOC Power cycled by Rod N. IG6 timing out? Contact vacuum group.

Entry  Monday, January 21, 2019, 10:55, Aaron Schmidt, , , , , , , , 2019 Anode tests FM-1 

Monday, January 21, 2019, 10:50: RGA on.

Monday, January 21, 2019, 10:54: Waterlines opened. No response on RGA. Vacuum ok @ 8.4e-07. IG6 not responding. Ok for this test.

Monday, January 21, 2019, 11:00: Power / Sources on.

Monday, January 21, 2019, 11:03: Anode to 300 V - 0.000 mA.

Monday, January 21, 2019, 11:05: Auto-ramping TGHT to 300 A @ 2 A per min.


Tuesday, January 22, 2019, 08:10: Auto-ramping TGHT to 580 A @ 2 A per min.


FM

Tuesday, January 22, 2019, 09:43 : Lowering the voltage to turn off Anode PS in order to replace the multimeter battery.

Tuesday, January 22, 2019, 09:51: Multimeter battery replaced. Turning on Anode PS and increasing the voltage to 300 V.

Tuesday, January 22, 2019, 10:46 : Auto-ramping TBHT to 200 A @ 2 A per min. Vaccum ok @1.29e-6 T

Tuesday, January 22, 2019, 13:08 :  Auto-ramping TBHT to 270 A @ 2 A per min. Vaccum ok @1.56e-6 T

Tuesday, January 22, 2019, 15:18 : Auto-ramping TBHT to 290 A @ 2 A per min. Vaccum ok @1.67e-6 T

Tuesday, January 22, 2019, 16:00: Manually-ramping  TBHT to 295 A @ 2 A per min. Vaccum ok @1.76e-6 T


FM

Wednesday, January 23, 2019, 09:35 : Manually-ramping  TBHT to 300 A @ 2 A per min. Vaccum ok @1.21e-6 T

Wednesday, January 23, 2019, 10:49 : Auto-ramping TBHT to 310A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 12:07 : Manually-cooling TBHT to 270A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 14:25:   Auto-ramping TBHT to 330A @ 2 A per min. Vaccum ok @1.03e-6 T

Wednesday, January 23, 2019, 16:23: Anode drain current was in runaway situation. When decreasing the TBHT current, the increment was set to 10 instead of 1 so there was a 10 A decrease from 330 to 320 A. This large decrease was unintended

Wednesday, January 23, 2019, 16:25:  Manually-cooling TBHT to 300A @ 2 A per min. Vaccum ok @1.12e-6 T

Wednesday, January 23, 2019, 17:18 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @1.12e-6 T


 FM

Thursday, January 24, 2019, 13:18:  Manually-cooling TBHT to 270A@ 2 A per min. Vaccum ok @9.02e-7 T

Thursday, January 24, 2019, 15:28 :  Manually-cooling TBHT to 250A@ 2 A per min. Vaccum ok @8.67e-7 T


FM

Friday, January 25, 2019, 14:59 : Manually-cooling TBHT to 240A@ 2 A per min. Vaccum ok @7.04e-7 T

Friday, January 25, 2019, 16:26 : Manually-cooling TBHT to 230A@ 2 A per min. Vaccum ok @5.18e-7 T


FM

Monday, January 28, 2019, 10:27:  Auto-ramping TBHT to 290A @ 2 A per min. Vaccum ok @4.91e-7 T

Monday, January 28, 2019, 11:32:   Manually-cooling TGHT to 570A@ 2 A per min. Vaccum ok @5.10e-7 T

Monday, January 28, 2019, 14:43:  Auto-ramping TBHT to 300A @ 2 A per min. Vaccum ok @5.46e-7 T

Monday, January 28, 2019, 15:57 : Manually-cooling TBHT to 290A@ 2 A per min. Vaccum ok @5.54e-7 T


FM

Tuesday, January 29, 2019, 15:42 : Manually-cooling TGHT to 560A@ 2 A per min. Vaccum ok @5.54e-7 T


FM

Wednesday, January 30, 2019, 17:23:  Manually-cooling TGHT to 550A@ 2 A per min. Vaccum ok @4.65e-7 T


FM

Friday, February 01, 2019, 14:45:   Manually-cooling TGHT to 540A@ 2 A per min. Vaccum ok @4.74e-7 T

Friday, February 01, 2019, 16:49: Auto cooling TGHT to 0A@2 A per min. 

Friday, February 01, 2019, 22:22:  Auto cooling TBHT to 0A@2 A per min. 


FM

Saturday, February 02, 2019, 10:07:   Auto-ramping TBHT to10A  and TGHT to 10A@ 2 A per min. Vacuum ok @3.13e-7 T


AS

Monday, February 04, 2019, 09:20: Restarted RGA. TGHT, TBHT, Anode, off. Prep to open gas lines.

Monday, February 04, 2019, 09:24: Open / Close SV4 only. Vacuum spike t0 5.5e-05T. Alternate between SV4 & SV5 to fully open Argon.

Monday, February 04, 2019, 09:48: Vacuum Stable @ 5.3e-07T

Monday, February 04, 2019, 09:49: Anode to 200 V. TBHT & TGHT on.

Monday, February 04, 2019, 09:51: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

FM

Tuesday, February 05, 2019, 12:01 :  Power / Sources on.

Tuesday, February 05, 2019, 12:02 : BIAS / EZL / EE @ 30 / 13.5 / 1.5 kV.

Tuesday, February 05, 2019, 12:10 : Cancelled! I need to remove first the multimeter in order to have high voltage.

Tuesday, February 05, 2019, 12:10 : Auto-cooling.


Wednesday, February 06, 2019, 07:55: Reset IV4. -AS

FERNANDO! CALL ME OR CHECK YOUR EMAIL BEFORE YOU CONTINUE.

Wednesday, February 06, 2019, 09:35: Cage off. Multimeter removed. Cage replaced.

Wednesday, February 06, 2019, 09:48: Power on. Gas lines (Ar) open

Wednesday, February 06, 2019, 10:00: Sources on.

Wednesday, February 06, 2019, 10:10: Anode 200 V. BIAS / EZL / EE @ 30 / 13 / -1.5 kV.

Wednesday, February 06, 2019, 10:11: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Wednesday, February 06, 2019, 10:12: IV4 open. Optics on.

Wednesday, February 06, 2019, 10:16: Optics set.


FM

Thursday, February 07, 2019, 09:59 : Mass scan attempted  and nothing shows. The current needs to be inverted. This was noted also by checking previous runs and the magnetic field on the epics optics window shows a negative magnetic field, while  now is showing a positive value.

Thursday, February 07, 2019, 12:55: MB1 set from Reverse to Normal manually. Auto range 'On'  FC6. Use 'Prepare down" & 'Down' to scan. - AS

Thursday, February 07, 2019, 16:55 : Auto-ramping TBHT to 310 A @ 2A per min.


FM

Friday, February 08, 2019, 09:04: FC0 current stable. Starting measurements of ion curres as a function of coil current, anode voltage, and possibly tbht. I'll be looking argon and CO.


FM

Friday, February 15, 2019, 15:38 Auto cooling TGHT/TBHT to 0A @ 2A/min


Tuesday, February 19, 2019, 08:34: BIAS / EZL/ EE @ 0 kV. Power to HV also turned off. - AS

Tuesday, February 19, 2019, 14:36 : Starting vacuum peak tests: For this I will close the valve and wait untill the vacuum has stabilized, then I will open the valve to see the maximum vacuum peak obtained.


Thursday, February 21, 2019, 11:58: Restart RGA - AS

Thursday, February 21, 2019, 14:05: SV5 closed, then SV3 & SV4

Thursday, February 21, 2019, 14:15: Mini pump started. Vacuum ok

Thursday, February 21, 2019, 14:20: Valve from mini pump opened. Vacuum jumped to 8.30e-07T after 2 minutes.

Thursday, February 21, 2019, 14:25: SV4 & SV3 opened. Vacuum @ 9.0e-07T with mini pump running.

Thursday, February 21, 2019, 14:30: Mini pump valve closed. Mini pump off. SV5 opened.  Vacuum to 3.1e-06T

Entry  Thursday, January 24, 2019, 08:42, Aaron Schmidt, , , , , , , , IG6 fix (w/ instruction) 

TMS:IG6 had continued communication errors post power outage & would not switch on. After a power loss, IG6 switches automatically to Filament 1. Filament 1 is burnt out.

Thursday, January 24, 2019, 08:14: TMS:IG6 fixed. Switched from Filament 1 to Filament 2. FIL2 runs ok.

Instructions from Edi:

-Using the + / - keys move the cursor on the control box to select FIL2. The control box is located above the beam line turbo pump control boxes / inside the black cabinets under the TS.

-Press ok to switch FL2 : ON

-Turn IG6 on with the computer (EPICS) before it times out.

-Now IG6 is connected and can be switched on / off from the computer.

Entry  Friday, February 22, 2019, 11:11, Aaron Schmidt, , LP-FEBIAD, , , , , , Gas line backing pump tests 

Backing "mini pump" testing.

-Open gas lines & auto ramp (If using HV, close up the back)

-HV on

-Close SV5, SV4, SV3 when ready. Wait until stable. Take measurement (1/2 hr approx)

-Turn down HV. Interlock, leave heaters on.

-Turn on mini pump.

-Open, SV4, SV3 carefully.

-Open MP valve. Wait 15 min. Close MP valve

-Carefully open SV5. Quick open & shut. Monitor vacuum 7.0e-06T trip limit.

-Monitor / record. Carefully open & close until stable.

-Close up TS w/ interlock

-HV on again & test.

 


Friday, February 22, 2019, 11:06: Auto-ramping TGHT / TBHT to 100 / 75 A. Gas lines open.

Friday, February 22, 2019, 11:31: HV on. BIAS / EZL / EE @ 5 / 1 / 0.1 kV. Anode @ 25 V - Low settings to check for trip and practice.

Friday, February 22, 2019, 11:43: HV unstable. Bump up. BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.

Friday, February 22, 2019, 12:36: SV3 closed (Neon)

Friday, February 22, 2019, 12:46: SV4 (Argon), SV5 closed.

Friday, February 22, 2019, 12:57: HV off.

Friday, February 22, 2019, 13:00: Interlock complete. Mini pump on.

Friday, February 22, 2019, 13:10: MP valve opened manually.

Friday, February 22, 2019, 13:16: SV3 open. SV4 open.

Friday, February 22, 2019, 13:19: MP valve closed. pump off. SV5 opened / closed fast & intermittent.

Friday, February 22, 2019, 13:22: SV5 open fully. Gas lines all open.

Friday, February 22, 2019, 13:24: HV on. Interlock out.

Friday, February 22, 2019, 13:27: BIAS / EZL / EE @ 10 / 5 / 0.2 kV. Anode @ 25 V - Low settings stable.

Friday, February 22, 2019, 13:30: Setting reset, including optics. TGHT / TBHT did not trip.TEST 1 SUCCESS!.


Monday, February 25, 2019, 07:36: Auto-ramping TGHT / TBHT to 580 / 290 A. Gas lines open. 

Monday, February 25, 2019, 11:04: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode @ 200V

Monday, February 25, 2019, 13:38 : SV3 closed.

Monday, February 25, 2019, 14:25: SV5 closed.

Monday, February 25, 2019, 14:45: HV off. 

Monday, February 25, 2019, 14:50: Mini-pump on.

Monday, February 25, 2019, 14:53: Open MP valve

Monday, February 25, 2019, 14:57: Open SV3 & SV4

Monday, February 25, 2019, 14:59: Close MP valve.

Monday, February 25, 2019, 15:00: Open / Close SV5 intermittently until stable.

Monday, February 25, 2019, 15:01: SV5 Open.

Monday, February 25, 2019, 15:04: Locked up. Power back to HV. Optics switched on. FC0 closed. Ready for HV


Wednesday, February 27, 2019, 08:11: Auto-cooling @ 2 A per min 

Wednesday, February 27, 2019, 13:23: gas lines closed.


Friday, March 01, 2019, 10:35: IV4 reset

Friday, March 01, 2019, 10:42: Ion gauge 1 & the turbo pumps off.

Entry  Friday, March 01, 2019, 14:51, Aaron Schmidt, , LP-FEBIAD, , , , , , Gas lines test & Emissions measurement prep gas-lines-changes.jpgGas_line_backing_pump_test_2019.docxTS-2019-03-05-09-45.rgaTS-2019-03-06-08-00.rga

Friday, March 01, 2019, 14:50:

SV5 replaced with a new valve.

SV1 disconnected from the He line and linked to the mini pump line.


Tuesday, March 05, 2019, 08:05: Roughing.

Tuesday, March 05, 2019, 08:36: Turbo pumps on.

Tuesday, March 05, 2019, 10:03: Vacuum at 1.30e-05T

Open SV3 & SV4. Vacuum remains unchanged. No response on the RGA.

Tuesday, March 05, 2019, 10:05: SV1 opened & closed. Responds well.

Tuesday, March 05, 2019, 10:06: Mini-pump on. MP manual valve closed.

Tuesday, March 05, 2019, 10:17: MP manual valve opened. No response on RGA. Vacuum stable / going down @ 1.13e-05T.

Tuesday, March 05, 2019, 10:25: SV1 open. No response on RGA. Vacuum stable / going down @ 1.02e-05T.

Tuesday, March 05, 2019, 10:35: SV1, SV3, SV4 closed. SV5 opened / closed. Minor response on RGA & Vacuum.

Tuesday, March 05, 2019, 10:40: SV5 opened fully to pump down.

Tuesday, March 05, 2019, 10:42: SV3 & SV4 opened fully to pump down.

Tuesday, March 05, 2019, 12:56: SV5 closed.

Tuesday, March 05, 2019, 12:57: SV3 & SV4 closed.

Tuesday, March 05, 2019, 12:59: SV1 to mini pump opened.

Tuesday, March 05, 2019, 13:06: SV3 & SV4 opened.

Tuesday, March 05, 2019, 13:27: SV1 closed. SV5 opened / closed in 'quick bursts'

Tuesday, March 05, 2019, 13:31: SV5 fully opened.

Tuesday, March 05, 2019, 13:43: Mini pump off.


Wednesday, March 06, 2019, 07:56: Mini-pump on. TS locked up. Power on. Gas lines open.

Wednesday, March 06, 2019, 07:59: RGA reset.

Wednesday, March 06, 2019, 08:00: Sources & optics on.

Wednesday, March 06, 2019, 08:02: Auto-ramping TGHT / TBHT to 100 / 75 A @ 2A per min. 

Wednesday, March 06, 2019, 08:07: BIAS / EZL / EE @ 10 / 5 / 0.5 kV - Low settings stable.

Wednesday, March 06, 2019, 08:19: IV4 opened.

Wednesday, March 06, 2019, 11:05: SV3 closed.

Wednesday, March 06, 2019, 11:10: SV4 & SV5 closed.

Wednesday, March 06, 2019, 11:11: SV5 re-opened.

Wednesday, March 06, 2019, 11:15: SV5 closed.

Wednesday, March 06, 2019, 11:16: SV1 to mini pump (running) opened.

Wednesday, March 06, 2019, 11:22: Sv3 & SV4 opened. No response on vacuum or RGA. SV5 good.

Wednesday, March 06, 2019, 11:30: Closed SV1, SV3, & SV4. open / close SV5 until stable.

Wednesday, March 06, 2019, 11:33: SV3 & SV4 opened.

Wednesday, March 06, 2019, 11:36: SV5 fully opened. No trip.

Wednesday, March 06, 2019, 11:40: Auto-ramping TGHT / TBHT to 350 / 250 A @ 2A per min.


Thursday, March 07, 2019, 07:23: Auto-ramping TGHT / TBHT to 580 / 290 A @ 2A per min.

Thursday, March 07, 2019, 07:28: BIAS / EZL / EE @ 30 / 13 / 1.5 kV. Anode 200 V

Thursday, March 07, 2019, 07:38: Something in the BIAS went horribly wrong. The Test Stand was crackling like a fire cracker. Very loud.

BIAS / EZL / EE / Anode off. Begin auto cooling.

Optics tripped. TMS:TP6 tripped

Entry  Thursday, March 21, 2019, 08:33, Aaron Schmidt, , , , , , , , Pump down TS 

Thursday, March 21, 2019, 08:32: Roughing.

Entry  Wednesday, May 22, 2019, 13:47, Aaron Schmidt, , , , , , , , Calibrated Masscorr 

Wednesday, May 22, 2019, 13:44: Calibration Confirmed.

New Masscorr setup:

http://isacwserv.triumf.ca/onlylocal/isactdata/save_restore/masscorr/2019-05-22-13-42%20ZrC%238

Entry  Friday, June 07, 2019, 16:56, Carla Babcock, , , , , , , , TM4 source tray state 

TM4 source tray left in test stand over weekend, just the rouging pumps on. Ready to be removed Monday morning.


Monday, June 10, 2019, 06:35: Venting - Aaron S.

Entry  Friday, June 21, 2019, 15:12, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2019 

Friday, June 21, 2019, 14:48: Roughing.

Friday, June 21, 2019, 15:18: Turbo pumps on.

Friday, June 21, 2019, 15:31: IG1 on.

Friday, June 21, 2019, 15:42: Vacuum@9.31e-5 T

Friday, June 21, 2019, 15:51: RGA switched on.

Friday, June 21, 2019, 16:30: Luca wants to put heat shields on his target. Aborting pumping. 

Friday, June 21, 2019, 16:57: IG1 off 

Friday, June 21, 2019, 16:57:  Turbo pumps off.

 Friday, June 21, 2019, 16:57: RGA switched off


AS

Monday, June 24, 2019, 07:18: Restart TP1A (Timeout) Global Reset. Restart again.

Monday, June 24, 2019, 07:29: TP1A to speed. Monitor. Vacuum @ 4.31e-06T

Monday, June 24, 2019, 07:31: Restart RGA.

Monday, June 24, 2019, 08:57: Waterlines opened. No response on RGA. Vacuum @ 3.23e-06T.

Monday, June 24, 2019, 09:03: Power / sources on. (No HV)

Monday, June 24, 2019, 09:04: TGHT / TBHT / Coil PS ready.  Vacuum @ 3.23e-06T.

Monday, June 24, 2019, 10:09: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. 

Monday, June 24, 2019, 10:57: Auto-ramping was halted @ 35 A. Coil increased. TGHT, TBHT, Coil brought back to 0 A

Monday, June 24, 2019, 10:58:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.27 5.47
 TBHT 26.11

8.20

 COIL + EE 26.03 2.36
 TGHT  26.12 6.33

 Monday, June 24, 2019, 11:01: Auto-ramping TGHT / TBHT to 150 / 75 A @ 2 A per min. Manually ramp coil to 150 A @ approx the same rate.

Monday, June 24, 2019, 12:20: Halt at 140A TGHT / Coil. Vacuum limit?

Monday, June 24, 2019, 13:23: Increasing good vac limit. From 3e-6 to 4.5e-6 T

Monday, June 24, 2019, 13:29: Auto-ramping TGHT / TBHT to 300 / 120 A @ 2 A per min. Manually ramp coil from 140 to 150 A @ approx the same rate.

Monday, June 24, 2019, 13:37

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 26.97 5.95
 TBHT 26.82

8.62

 COIL + EE 26.70 2.60
 TGHT 26.80 6.54

 Monday, June 24, 2019, 14:4: TGHT @ 270 A. Vacuum limits reached 3.05e-06T. Gradual out-gassing w/ cont'd auto ramp.


Tuesday, June 25, 2019, 07:53: Auto-ramping TGHT / TBHT to 550 / 120 A @ 2 A per min.

Tuesday, June 25, 2019, 08:34:

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 25.30 5.75
 TBHT 25.08

8.40

 COIL + EE 24.96 2.47
 TGHT 25.08 6.55

Tuesday, June 25, 2019, 10:09: At approx 9:45am a vacuum spike tripped the test stand. All heaters at 0 A. Power supplies checked.

Tuesday, June 25, 2019, 10:11: TGHT / TBHT / Coil @ 6 A. Bumped up manually.

Tuesday, June 25, 2019, 10:12: Auto-ramping TGHT / TBHT to 300 / 100 A @ 2 A per min. Manually ramp coil to 150 A.

Tuesday, June 25, 2019, 11:01: One sheet on the target leg is shining red.

Tuesday, June 25, 2019, 11:01: Aborting the ramping.

Tuesday, June 25, 2019, 11:08 :

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 27.50 6.29
 TBHT 27.28

8.88

 COIL + EE 27.20 2.74
 TGHT 27.30 6.73

Tuesday, June 25, 2019, 11:18: Continue auto ramping

Tuesday, June 25, 2019, 11:37: Auto-cooling @ 12 A per min. Coil tapped down manually.

Tuesday, June 25, 2019, 11:58: Sources off. RGA off. Power off.

Tuesday, June 25, 2019, 11:59: IG1 off. Turbos off.

Entry  Thursday, July 04, 2019, 15:15, Aaron Schmidt, P2N - 1, , , , , , , P2N - 1 - 2 - 2019 

Screws instead of rivets on target leg. Insulator changed.

Thursday, July 04, 2019, 15:14: Roughing

Thursday, July 04, 2019, 16:00: Turbos on.

Thursday, July 04, 2019, 16:12: IG1 on. RGA on


Friday, July 05, 2019, 08:12: Waterlines opened. No response on RGA. Vacuum ok @ 4.57e-06T.

Friday, July 05, 2019, 08:14: Power / sources on.

LE,FM

Friday, July 05, 2019, 10:00: Autoramping TGHT/TBHT to 250/100 A @ 3 A/min. Vacuum limits change to 5e-6 T and 5.5e-6 T. Vacuum ok @ 4.2e-6 T.

Friday, July 05, 2019, 11:42 :

 

 Device Temp
[C]
 Flow
[lpm]
 HS + MSP 28.06 6.46
 TBHT 27.91 9.01
 COIL + EE 27.82 2.80
 TGHT 27.93 6.82

Friday, July 05, 2019, 11:45 : Auto ramping TGHT/TBHT to 300/150A @ 3 A/min.

Friday, July 05, 2019, 17:32:

Friday, July 05, 2019, 13:56: Source/Optics on

Friday, July 05, 2019, 14:38: BIAS / EE / EZL @ 30 / -1.5 / 13 kV. One spark while bring the BIAS to 30 kv around 27.5 kV. IV4 opened.

Friday, July 05, 2019, 17:32: BIAS / EE / EZL @ 0 for the weekend. Heater will be left on.


FM

Monday, July 08, 2019, 15:12:  BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Monday, July 08, 2019, 18:59: BIAS / EE / EZL @ 0.00 kV


Tuesday, July 09, 2019, 13:42: TBHT/TGHT @ 590/230A.

Tuesday, July 09, 2019, 13:49 BIAS / EE / EZL @ 30 / -1.5 / 13 kV.

Tuesday, July 09, 2019, 14:04: Dipole magnet not responding. Cycling the PS on EPICS didn't work. Cycling the PS directly worked.

Tuesday, July 09, 2019, 17:28: BIAS / EE / EZL @ 0.00 kV

 

Entry  Tuesday, July 16, 2019, 10:28, Fernando Maldonado, P2N, , , , , , , P2N 1200 A test 

Tuesday, July 16, 2019, 10:27: The idea of this run is to have the full 600 A from TGHT and the full 600 A from TBHT.

This will done based on the rewiring done previously (see entry 745)

Tuesday, July 16, 2019, 12:16: Jumper cable F-H burning while target was at 600 A total. Ramp up aborted and auto-cooling started to remove the jumper.

Jumper removed.

TBHT cables on both positive coil FT.

Jumper E-G removed.

High current cable connecting F-H.

Tuesday, July 16, 2019, 16:49

Current ramped up to 300A + 300A on TGHT and TBHT in parallel, for an equivalent of 600A on the target. No burn to anything noticed, PS ramping nicely together. Stopped ramping up and started ramp down for the night.

Entry  Friday, September 27, 2019, 11:54, Aaron Schmidt, , LP-SIS, , , 41790-9, 43515-6, , Conditioning UC#(29) HS 

Using broken LP-FEBIAD oven. TBHT off.

Friday, September 27, 2019, 11:53: Roughing.

Friday, September 27, 2019, 13:14: Turbo pumps on.

Friday, September 27, 2019, 13:20: Ion gauge on.

Friday, September 27, 2019, 13:24: RGA on.


Monday, September 30, 2019, 07:30: Waterlines Opened. No response on RGA. Vacuum ok @ 5.39e-07T.

Monday, September 30, 2019, 07:34: Power / Sources on.

Monday, September 30, 2019, 07:35: Auto-ramping TGHT to 580 A @ 2 A per min.


Tuesday, October 01, 2019, 14:29: Auto-Cooling TGHT @ 2A per min.


Wednesday, October 02, 2019, 08:24: Power / sources off.

Wednesday, October 02, 2019, 08:25: RGA off.

Wednesday, October 02, 2019, 08:26: Ion gauge & Turbo pumps off.

Wednesday, October 02, 2019, 12:50: Venting & Waterlines purged.

Entry  Friday, November 15, 2019, 10:35, Aaron Schmidt, , , , , , , , Pump down empty Chamber 

Friday, November 15, 2019, 09:35: Roughing.

Friday, November 15, 2019, 10:34: Turbo pumps on.


Wednesday, November 20, 2019, 09:19: Turbo pumps off. Ion gauge off.

Wednesday, November 20, 2019, 11:20: Roughing. U-Line removed from HS waterline. Blanks installed. Do not open HS waterline.

 

Entry  Friday, November 22, 2019, 19:06, Fernando Maldonado, Ferran Boix Pamies, , , , , , , , PEEK seal tests 

 Friday, November 22, 2019, 19:02: The new design for the PEEK irradiation will be tested.

Blinds were removed and a new LP-SIS assembly with a modify heatshield was installed. Three termocuples installed.

Friday, November 22, 2019, 19:04: Roughing 

Friday, November 22, 2019, 19:38: Turbos on

Friday, November 22, 2019, 19:46: TSGIG1 on

Monday, November 25, 2019, 15:43: Vacuum stable@ 5.73E-7T

Monday, November 25, 2019, 15:47: Waterlines open. No response on Vacuum

Monday, November 25, 2019, 15:51: RGA on.

Tuesday, November 26, 2019, 08:41: Vacuum stablet@ 5.2E-7T

 Tuesday, November 26, 2019, 15:04: Power on

Tuesday, November 26, 2019, 17:17: Auto-ramping  to 300A/150A on the TGHT/TBHT @ 6 A/min

Tuesday November 26, 2019 20:00: Thermocouple 3 gives signs to have a bad contact with the HS. "Luckily" it is the one attached to the HS itself. TH 1 and 2 show similar temperatures below 40degC at 500A. Ramping to 600A

 Tuesday November 26, 2019 20:46: 600A TH1 and 2 around 40degC slightly going down. Tomorrow it will be known the final steady-state temperature. The test shows tho that the temperature evolves similarly between the copper piece and the Peek assembly. Showing good contact.


FM

Wednesday, November 27, 2019, 13:47: Th1=35, Th2=34.8, Th3=19.6 C.

Wednesday, November 27, 2019, 13:49: Closing Farady cage to proceed with HV tests.

Wednesday, November 27, 2019, 13:56: HV on. Optics set.

Wednesday, November 27, 2019, 14:01: RGA off to protect it from potential sparks.

Wednesday, November 27, 2019, 14:18: Bias/EE/EZL to 30/1.5/13 kV.\

Wednesday, November 27, 2019, 14:25: Bias/EE/EZL to 40/2.0/17 kV.

Wednesday, November 27, 2019, 14:28: Audible spark on top @ 48kV

Wednesday, November 27, 2019, 14:29: Bias/EE/EZL to 50/2.5/22 kV.

Wednesday, November 27, 2019, 14:35: Spark noticed on striptool, not audible.

Wednesday, November 27, 2019, 14:36: Audible spark on top. not as loud as previous one.

Wednesday, November 27, 2019, 14:39: Spark noticed on striptool, not audible.

Wednesday, November 27, 2019, 14:39: Moving to 55kV to condition for 10 minutes then coming down to 50kV

Wednesday, November 27, 2019, 14:42: Audible spark at 59kV. TP6 and CB knocked out.

Wednesday, November 27, 2019, 14:46: Bias/EE/EZL to 55/2.8/24 kV.

Wednesday, November 27, 2019, 14:50: Audible spark. TP6 , CB, optics knocked out..

Wednesday, November 27, 2019, 14:51: Audible spark. TP6 , CB, optics knocked out.

Wednesday, November 27, 2019, 15:01: Thermal incident (see elog 773)

Wednesday, November 27, 2019, 15:03: All HV to 0 V

Wednesday, November 27, 2019, 16:01: Resuming HV test. Max HV=50kV.

Wednesday, November 27, 2019, 16:10: Bias/EE/EZL to 30/1.5/13 kV.

Wednesday, November 27, 2019, 16:38: Bias/EE/EZL to 40/2.0/17 kV.

Wednesday, November 27, 2019, 16:50: Spark

Wednesday, November 27, 2019, 17:01: Spark

Wednesday, November 27, 2019, 17:09: Spark to EZL. Instabilitiesafter this, TBHT insulator glowing blue

Wednesday, November 27, 2019, 18:11:  Bias/EE/EZL to 0 kV.

Wednesday, November 27, 2019, 18:11: Auto-cooling at 10 A/min (2.5A/15s).

Wednesday, November 27, 2019, 19:13: IG1 off. Turbos off.

Wednesday, November 27, 2019, 20:35: Venting. Tighten the 4 bolts from the heatshields as they were not done before the tests. Removing thermocouples as they might be causing some sparks.

Wednesday, November 27, 2019, 20:42: Roughing


Thursday, November 28, 2019, 07:00: Turbo pumps on.

Thursday, November 28, 2019, 07:06: Ion gauge on.

 

Entry  Friday, December 20, 2019, 07:59, Aaron Schmidt, , , , , , , , Holiday TS shut down 

Friday, December 20, 2019, 07:58: Turn off ion gauges. Shut off turbo pumps TP6, TP2, TP1A, & TP1B. Close backing valves.

Friday, December 20, 2019, 08:06: PV1 & PV2 off. RP1 & RP2 off.


Monday, January 06, 2020, 09:35: Restarting TS. RP1 & RP2 on. (BIAS PS upgraded / Note: https://elog.triumf.ca/TIS/Test-Stand/776 ). No HV as yet.

Monday, January 06, 2020, 09:37: Turbo pumps (TP6, TP2, TP1A, & TP1B) on.

Monday, January 06, 2020, 09:42: Ion gauges on (IG1 & IG6).


Monday, January 20, 2020, 08:17: Ion gauge. Turbos pumps off.

Monday, January 20, 2020, 10:26: Venting.

Entry  Tuesday, February 11, 2020, 14:27, Aaron Schmidt, , , , , , , , Pump down empty Chamber 

Tuesday, February 11, 2020, 14:27: UC#32 HS removed.

Tuesday, February 11, 2020, 14:27: Roughing.


Wednesday, February 12, 2020, 09:05: Venting.

Entry  Thursday, February 27, 2020, 07:20, Aaron Schmidt, , , , , , , , FS#3 - Fitting change out 

Thursday, February 27, 2020, 07:10: Swapped out an old brass fitting on the supply line going into FS#3 - Line K.

Replaced w/ SS fitting for interchangeability w/ other lines in case a bypass is needed.

Entry  Friday, March 27, 2020, 11:30, Aaron Schmidt, , , , , , , , Vacuum loss / spike / Shutdown Mar_27_-_2020_-_Vacuum_Trip.docx

The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.

Check daily


Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.


Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip. 

Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)

Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.

Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.


Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.


Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T. 


Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.


Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.


Friday, April 03, 2020, 05:05: Vacuum @ 9.213T. 


Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T. 


Tuesday, April 28, 2020, 11:11: Venting. 

    Reply  Tuesday, April 07, 2020, 10:53, Anders Mjos, , , , , , , , Vacuum loss / spike / Shutdown 

Aaron Schmidt wrote:

The ISAC was left with the turbo pumps and water supplies running. Just the power supplies off. Monday, March, 23, 2020.

Check daily


Thursday, March 26, 2020, 13:25: Vacuum ok at 3.2e-07T. All status ok.


Friday, March 27, 2020, 09:00: Checked via epics. There appears to have been a trip. 

Vacuum at 7.953T . The trip looks to have occurred around midnight. (See attached*)

Friday, March 27, 2020, 11:15: MCR shut down supply / return on DI water supply to be on the safe side.

Friday, March 27, 2020, 11:20: Monitor. Control room has my cell number now as well as it's on my TRIUMF profile. Beam line side ok.


Monday, March 30, 2020, 06:26: Vacuum @ 8.583T.


Tuesday, March 31, 2020, 10:03: Vacuum @ 8.016T. 


Wednesday, April 01, 2020, 11:51: Vacuum @ 8.205T.


Thursday, April 02, 2020, 11:41: Vacuum @ 8.709T.


Friday, April 03, 2020, 05:05: Vacuum @ 9.213T. 


Tuesday, April 07, 2020, 10:46: Vacuum @ 11.922T. 

Tuesday, April 07, 2020, 10:53:

Tried pumping down chamber with roughing pump. Looks like there is water in the system. Will leave it as is for now.


Tuesday, April 28, 2020, 12:30

Removed SiC#40 target and pumped down with HS lines blanked off. Used recycled SST gaskets.

Tuesday, April 28, 2020, 13:00

Still problem with water in the system. CG1 at about 25 Torr. Purging all water lines and pumping down again.