783
|
Tuesday, February 11, 2020, 14:27 |
Aaron Schmidt | | | | | | | | Pump down empty Chamber | Tuesday, February 11, 2020, 14:27: UC#32
HS removed.
Tuesday, February 11, 2020, 14:27: |
|
|
786
|
Thursday, February 27, 2020, 07:20 |
Aaron Schmidt | | | | | | | | FS#3 - Fitting change out | Thursday, February 27, 2020, 07:10: Swapped
out an old brass fitting on the supply line
going into FS#3 - Line K. |
|
|
788
|
Wednesday, March 04, 2020, 17:15 |
Fernando Maldonado | | | | | | | Problems/Solutions | Emittance rig communication | Wednesday, March 04, 2020, 17:13: EPICS
page indicated a sucesful scan but data was
empty. |
|
|
791
|
Friday, March 27, 2020, 11:30 |
Aaron Schmidt | | | | | | | | Vacuum loss / spike / Shutdown | The ISAC was left with the turbo pumps
and water supplies running. Just the power
supplies off. Monday, March, 23, 2020. |
|
|
792
|
Tuesday, April 07, 2020, 10:53 |
Anders Mjos | | | | | | | | Vacuum loss / spike / Shutdown |
|
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
803
|
Tuesday, July 28, 2020, 13:27 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak on magnet PS | Fault: 13334
|
|
|
805
|
Wednesday, August 05, 2020, 10:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Roughing pump swap out. | Wednesday, August 05, 2020, 10:00: TP6
& TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: |
|
|
807
|
Tuesday, August 18, 2020, 10:00 |
Aaron Schmidt | | | | | | | | IDP15 Scroll pump installed - RP1 replaced | PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std. |
|
|
809
|
Wednesday, August 19, 2020, 08:52 |
Aaron Schmidt | | | | | | | | Leak check / Troubleshoot | Wednesday, August 19, 2020, 08:52: Purging
all lines, except FS#5, It was already purged
/ closed. |
|
|
810
|
Tuesday, August 25, 2020, 07:23 |
Aaron Schmidt | | | | | | | Problems/Solutions | Beam line side vacuum trip | Tuesday, August 25, 2020, 07:07: Beam line
side of the TS appears to have tripped? Open
BV6 & BV2. |
|
|
811
|
Tuesday, September 01, 2020, 14:01 |
Aaron Schmidt | | | | | | | Done | New tubing installed on loops | Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B) |
|
|
813
|
Tuesday, September 29, 2020, 11:56 |
Aaron Schmidt | | LP-SIS | | | | | Problems/Solutions | Leak check 3.0 | Installed Indium gasket on FS#2 - (C) water
block / R- TGHT.
Tuesday, September 29, 2020, 11:23: |
|
|
818
|
Monday, November 02, 2020, 08:52 |
Aaron Schmidt | | | | | | | Problems/Solutions | Leak check / Troubleshoot | Monday, November 02, 2020, 08:46:
Large Vacuum spike noted 5:30 approx.
Tripped TS. On tail end of the Nb#9 conditioning |
|
|
821
|
Monday, November 23, 2020, 10:03 |
Aaron Schmidt | | | | | | | Problems/Solutions | RP2 Check / pump down issue | TMSRP2 has been struggling since the power
bump occurred Nov 18, 2020
Monday, November 23, 2020, 09:48: |
|
|
822
|
Tuesday, December 01, 2020, 11:56 |
Carla Babcock | | | | | | | In progress | Modifications to test stand for TM3 tests | Tuesday, December 01, 2020, 11:56 :
TSG:BIAS unplugged and controls pigtail
(made by Ray) added in order to connect controls |
|
|
823
|
Tuesday, December 01, 2020, 17:04 |
Carla Babcock | | | | | | | Problems/Solutions | Found another burned jumper cable | Between feedthroughs F (magnet coil) and
B (tube heater negative), I found a jumper
with two resistors that has been burned up. |
|
|
824
|
Wednesday, December 02, 2020, 08:32 |
Carla Babcock | | | | | | | | Modifications to test stand for TM3 tests | Wednesday, December 02, 2020, 08:31 :
Added copper wire connection to multipin
screw terminals in HV cage to make sure they |
|
|
825
|
Wednesday, December 02, 2020, 16:18 |
Fernando Maldonado | | | | | | | Done | Gas delivery system upgrade | Yesterday, December 1st, I successfully
installed and tested the gas system inside
the faraday cage. |
|
|
826
|
Thursday, December 03, 2020, 15:55 |
Carla Babcock, Alexander Shkuratoff | | | | | | | | Modifications to ISAC test stand for TM3 tests | Thursday, December 03, 2020, 15:54 :
Got sign off from John Chow to run
the system, though the nylon insulator was |
|