773
|
Wednesday, November 27, 2019, 16:01 |
Fernando Maldonado | | | | | | | Problems/Solutions | New Controller for TP6 | Wednesday, November 27, 2019, 15:31: During
HV tests, bias was around 55kV when a spark
occur and almost immediately the controller |
|
|
774
|
Monday, December 02, 2019, 16:01 |
Fernando Maldonado | | | | | | | In progress | Ferran irradiation copper end plate tests (aka MIST) | Friday: Test to validate Ferran's assembly.
The plan is to ramp up to operating current,
apply high voltage, and possibly extract |
|
|
775
|
Friday, December 20, 2019, 07:59 |
Aaron Schmidt | | | | | | | | Holiday TS shut down | Friday, December 20, 2019, 07:58: Turn
off ion gauges. Shut off turbo pumps TP6,
TP2, TP1A, & TP1B. Close backing valves. |
|
|
776
|
Friday, January 03, 2020, 11:56 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply | A new power supply was installed today
by John Chow. Due to differences in pin configuration
of the controls, a change to the cabling |
|
|
778
|
Tuesday, January 21, 2020, 13:45 |
Aaron Schmidt | | | | | | | Problems/Solutions | RGA Communications error | Tuesday, January 21, 2020, 13:42: The RGA
was unable to connect. Typically connects
on COM4, however it did not register. RGA |
|
|
779
|
Thursday, January 23, 2020, 16:05 |
Anders Mjos | | | | | | | Problems/Solutions | Vacuum tripped due to PLC/EPICS for for the new BIAS | Thursday, January 23, 2020, 16:05: Restarting
vacuum and TPs |
|
|
780
|
Friday, January 24, 2020, 16:01 |
Anders Mjos | | | | | | | Problems/Solutions | Upgrading BIAS Power Supply |
|
|
|
783
|
Tuesday, February 11, 2020, 14:27 |
Aaron Schmidt | | | | | | | | Pump down empty Chamber | Tuesday, February 11, 2020, 14:27: UC#32
HS removed.
Tuesday, February 11, 2020, 14:27: |
|
|
786
|
Thursday, February 27, 2020, 07:20 |
Aaron Schmidt | | | | | | | | FS#3 - Fitting change out | Thursday, February 27, 2020, 07:10: Swapped
out an old brass fitting on the supply line
going into FS#3 - Line K. |
|
|
788
|
Wednesday, March 04, 2020, 17:15 |
Fernando Maldonado | | | | | | | Problems/Solutions | Emittance rig communication | Wednesday, March 04, 2020, 17:13: EPICS
page indicated a sucesful scan but data was
empty. |
|
|
791
|
Friday, March 27, 2020, 11:30 |
Aaron Schmidt | | | | | | | | Vacuum loss / spike / Shutdown | The ISAC was left with the turbo pumps
and water supplies running. Just the power
supplies off. Monday, March, 23, 2020. |
|
|
792
|
Tuesday, April 07, 2020, 10:53 |
Anders Mjos | | | | | | | | Vacuum loss / spike / Shutdown |
|
|
|
793
|
Tuesday, May 19, 2020, 06:01 |
Aaron Schmidt | | | | | | 42972-8 | Problems/Solutions | Leak check / Troubleshoot | https://elog.triumf.ca/TIS/Test-Stand/791
|
|
|
802
|
Wednesday, July 22, 2020, 08:56 |
Luca Egoriti | P2N test | HP-SIS | ITE | TM4 | | | In progress | p2n heating test - electrical feedthrough configuration | The electrical feedthroughs at the
top of the test stand module were reconfigured
to deliver up to 1200A to the p2n target. |
|
|
803
|
Tuesday, July 28, 2020, 13:27 |
Aaron Schmidt | | | | | | | Problems/Solutions | Water leak on magnet PS | Fault: 13334
|
|
|
805
|
Wednesday, August 05, 2020, 10:01 |
Aaron Schmidt | | | | | | | Problems/Solutions | Roughing pump swap out. | Wednesday, August 05, 2020, 10:00: TP6
& TP2 off. IG6 off.
Wednesday, August 05, 2020, 12:20: |
|
|
807
|
Tuesday, August 18, 2020, 10:00 |
Aaron Schmidt | | | | | | | | IDP15 Scroll pump installed - RP1 replaced | PN: X3815-64000
SN: MY2005SA02
Description: IDP15 Scroll pump, Std. |
|
|
809
|
Wednesday, August 19, 2020, 08:52 |
Aaron Schmidt | | | | | | | | Leak check / Troubleshoot | Wednesday, August 19, 2020, 08:52: Purging
all lines, except FS#5, It was already purged
/ closed. |
|
|
810
|
Tuesday, August 25, 2020, 07:23 |
Aaron Schmidt | | | | | | | Problems/Solutions | Beam line side vacuum trip | Tuesday, August 25, 2020, 07:07: Beam line
side of the TS appears to have tripped? Open
BV6 & BV2. |
|
|
811
|
Tuesday, September 01, 2020, 14:01 |
Aaron Schmidt | | | | | | | Done | New tubing installed on loops | Tuesday, September 01, 2020, 14:00:
New tubing installed.
Blue on FS#4 loop (A)(B) |
|