Entry  Monday, August 22, 2016, 08:20, Aaron Schmidt, , , , , 41882-4, 41751-3, , HS Test Full Clean HS_41751-3_TEST.docxTS-2016-08-22-11-50.rga20160824_143544.jpg
Heat Shield Test (Fully Cleaned).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Wednesday, August 24, 2016, 09:16, Aaron Schmidt, , , , , 41882-4, 41751-6, , HS Test OR Clean 7x
Heat Shield Test (OR only).
For all 6 tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
Entry  Monday, August 29, 2016, 10:08, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Monday, August 29, 2016, 10:07: Roughing.

Friday, September 02, 2016, 14:33: Venting
Entry  Friday, September 02, 2016, 15:47, Aaron Schmidt, SiC#34, LP-IG-LIS, ITE, TM4, 39814-V2-1, 41751-9, , Conditioning SiC# 34 ER-580-270-m40.txtITE-TM4-SiC#34-LP-IG-LIS_Test_Stand.docxSiC#34.docxTS-2016-09-06-08-12.rga
Friday, September 02, 2016, 15:47: Roughing.
Friday, September 02, 2016, 16:18: Turbos started -AM
Friday, September 02, 2016, 16:28: Turbos at speed. Vacuum at 2.0E-5 T.
Entry  Wednesday, September 07, 2016, 15:51, Aaron Schmidt, , , , , , , , Flexible waterlines test. Flexible_Line_Test.docxTS-2016-09-08-08-47.rga
Wednesday, September 07, 2016, 15:35: Roughing

Thursday, September 08, 2016, 08:33: Turbo pumps started.
Thursday, September 08, 2016, 08:38: Ion gauge on. TP1B @ speed 42 KRPM.
Entry  Wednesday, November 16, 2016, 10:50, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Wednesday, November 16, 2016, 10:50: Begin roughing.
Wednesday, November 16, 2016, 11:52: Turbo pumps on.
*Note* Unusual sound noticed right at the start up of TSG : TP1B. It was first noticed prior to venting UC#18. The sound only lasts 10-15 seconds
Entry  Thursday, November 24, 2016, 10:36, Aaron Schmidt, , , , , , , , Camera Container test 1. Camera_Case_Test_1.docxTS-2016-11-24-12-50.rgaTS-2016-11-25-10-10.rga
Thursday, November 24, 2016, 10:15: Discuss w/ Aurelia. Camera container filled with Argon. Place under Vacuum, monitor w/ RGA.
Thursday, November 24, 2016, 11:43:Pump down started. Camera and case placed near RGA.
Thursday, November 24, 2016, 12:42: Turbo pumps started
Entry  Friday, November 25, 2016, 14:28, Anders Mjos, , , , , , , , Camera Container test 2 Camera_Case_Test_2.docxTS-2016-11-25-14-50_Test_2.rgaTS-2016-11-28-08-40_Test_2.rga
Friday, November 25, 2016, 14:28: Roughing
Friday, November 25, 2016, 14:47: Turbos started
Friday, November 25, 2016, 14:56: Turbos at speed. Vacuum at 6.4E-6 T. RGA on
Entry  Wednesday, November 30, 2016, 07:25, Aaron Schmidt, , , , , , , , Camera Container test 3. Camera_Case_Test_3.docxTS-2016-11-30-09-00_Test_3.rga
Wednesday, November 30, 2016, 07:23: Venting
Wednesday, November 30, 2016, 08:35: Roughing.
Wednesday, November 30, 2016, 09:01: RGA on. Turbos @ speed. Ion gauge on.
Entry  Wednesday, November 30, 2016, 10:16, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Close off for holidays) 
Wednesday, November 30, 2016, 10:16: Roughing
Wednesday, November 30, 2016, 11:05: Turbo pumps on.
Wednesday, November 30, 2016, 11:13: Ion gauge on.
Entry  Tuesday, January 03, 2017, 08:27, Aaron Schmidt, , , , , , , , Pump down empty chamber. (Restart. Post holidays) 
Tuesday, January 03, 2017, 08:26: TSG : RP1 & TMS : RP2 restarted.

Wednesday, January 04, 2017, 11:18: TSG : PV1 & TMS : PV2 opened.
Wednesday, January 04, 2017, 11:19: TSG : BV1A & TSG : BV1B opened. TMS : BV2 & TMS : BV6 open.
Entry  Monday, January 23, 2017, 15:30, Aaron Schmidt, , , , , , , , Pump down empty chamber. 
Monday, January 23, 2017, 15:30: Roughing

Wednesday, January 25, 2017, 09:05: Venting
Entry  Tuesday, January 24, 2017, 14:14, Aaron Schmidt, , , , , , , , Calibrated leak tanks removed 
Tuesday, January 24, 2017, 13:30: Calibrated leak tanks of Argon & Neon removed. Both old Neon tanks were re-installed in their place. 
Entry  Wednesday, March 22, 2017, 09:37, Anders Mjos, , , , , , , , Pump down empty chamber 
Wednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05: Turbos started

Friday, March 24, 2017, 11:01: Turbos off. Ion gauge off.
Entry  Tuesday, April 04, 2017, 14:33, Aaron Schmidt, , , , , , , , Power supply failure to E-rig 20170330_094009.jpg20170330_094019.jpg20170407_115355.jpg20170407_115223.jpg20170407_115414.jpg
Wednesday, March 29, 2017, 15:15: DAC power supply appears to have failed. Pop sound and electrical smoke/smell noticed.

Tuesday, April 04, 2017, 14:15: Kepco BOP 500M power supply replaced with back up Kepco BOP 500M.
Tuesday, April 04, 2017, 14:32: No response from new power supply. All connections in OK. Further inquiry required.
Entry  Tuesday, May 02, 2017, 14:03, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out) 20170504_133718.jpg20170504_133723.jpg20170504_133728.jpg20170504_133735.jpg
Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging. 

Wednesday, May 03, 2017, 07:07: Venting.
Entry  Thursday, May 04, 2017, 13:49, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (1) UC#20_Heat_shield_conditioning-1.docxTS-2017-05-05-07-35.rga
Thursday, May 04, 2017, 13:48: Roughing.
Thursday, May 04, 2017, 14:09: Turbos on.

Friday, May 05, 2017, 07:35: RGA on. Vacuum @ 1.56e-06T
Entry  Friday, May 05, 2017, 14:28, Aaron Schmidt, UC#20, LP-IG-LIS, , , , , , Conditioning Heat shield for UC#20 (2)  UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga
New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines reconnected to air lines. He likely still in lines. May show in RGA if there's an issue prior to opening
Entry  Wednesday, May 10, 2017, 15:07, Aaron Schmidt, , , , , , , , Pump down empty chamber. (FS#3 out) 05-11-2017_Water_leak.docx
FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos on.
Entry  Tuesday, May 16, 2017, 14:25, Aaron Schmidt, , HP-FEBIAD-CTL, , , , , , Tri-Coil CTL-FEBIAD test III 8x
Coil loose (Remove lid, Tighten and place lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
Tuesday, May 16, 2017, 14:45: Turbo pumps on.