ID Date Author Target/No.# Sourcedown Station Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  390   Thursday, June 26, 2014, 16:32 Anders MjosTa#43LP-SISITWTM140282-239230-6In progressConditioning Ta#43Thursday, June 26, 2014, 16:31: Roughing.
Thursday, June 26, 2014, 16:51: Starting
turbos. 
 Ta#43_Conditioning.docx 
  394   Friday, July 18, 2014, 11:30 Anders MjosUC#10LP-SISITETM440282-540316-1DoneUC#10 Heat Shield ConditioningFriday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos
  
  397   Friday, August 08, 2014, 12:45 Anders MjosZrC#6LP-SISITWTM140282-339230-5DoneCondictioning ZrC#6Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting 
  
  425   Tuesday, February 03, 2015, 14:33 Anders MjosEmptyLP-SIS    In progressTarget with new center block and new EE insulatorAlso with newly installed RGA
Tuesday, February 03, 2015, 14:33:
Roughing
 2015-02-04-1530trace.pngLP-SIS-newCenterBlock_Feb_05_2015.zip 
  450   Monday, June 15, 2015, 14:09 Anders MjosZrC#7LP-SIS TM241177-1 In progressZrC#7 ConditioningMonday, June 15, 2015, 14:05 Roughing
Monday, June 15, 2015, 14:39: Turbos
started.
 ZrC#7.docxER580-220-30kV-m39-off30.txt 
  454   Tuesday, June 30, 2015, 14:51 Anders MjosZrC#7LP-SIS TM241177-2 In progressZrC#7 Conditioning 2Tuesday, June 30, 2015, 14:51: Roughing
Tuesday, June 30, 2015, 16:14: Started
turbos. CG1 at 0.075 T
 ZrC#7_Second_Time.docxTGT2-ER580-200-30kV-m39-off60-3.txt 
  457   Monday, July 13, 2015, 17:19 Anders Mjos LP-SIS    In progressSIS Cup insulator clamping testMonday, July 13, 2015, 17:09: Roughing
Monday, July 13, 2015, 17:51: Turbos
started
  
  459   Monday, August 10, 2015, 18:01 Anders Mjos LP-SIS    In progressTesting new center block targetInstalled thermocouples:
T1: TGHT tube left side, inside
T2: TBHT restraint
  
  464   Thursday, September 17, 2015, 14:05 Anders MjosTest TargetLP-SIS    In progressNew centre block test 

    
        
  
  466   Wednesday, September 30, 2015, 16:28 Anders MjosTest Target wrapped with heat shieldsLP-SIS    In progressNew centre block test 

    
        
  
  482   Wednesday, December 02, 2015, 15:30 Anders Mjos LP-SIS     New centre block testNew 2x 9-pin connector grounding tool with
gripper installed.
Wednesday, December 02, 2015, 15:30:
  
  494   Friday, January 22, 2016, 15:34 Anders MjosSiCLP-SIS  41077-3 In progressEE coating testFriday, January 22, 2016, 15:30: Turbos
started
Friday, January 22, 2016, 16:14:
 2016-02-14_EE_V_limit.png 
  495   Tuesday, February 23, 2016, 10:43 Anders MjosSiCLP-SIS  41077-3  EE coating test - no Plasma ElectrodeCleaned up EE and around target tube. Removed
PE
Tuesday, February 23, 2016, 10:40:
  
  497   Friday, March 04, 2016, 14:23 Anders MjosTarget tube onlyLP-SISITWTM239459-241120-10In progressConditiong Heat Shield for UC#15Friday, March 04, 2016, 14:20: Roughing
Friday, March 04, 2016, 15:05: Turbos
started
  
  501   Wednesday, March 30, 2016, 16:32 Aaron SchmidtTa#47LP-SISITETM441790-141120-05In progressConditioning Ta#47Wednesday, March 30, 2016, 16:31: Roughing.
Wednesday, March 30, 2016, 17:34
: Turbos started -AM
 TS-2016-03-30_Ta#47.rgaER-580-230-30kV-m23.txtER-580-230-30kV-m27.txtITE-TM4-Ta#47-LP-SIS_Test_Stand.docxTa#47.docx 
  502   Monday, April 04, 2016, 11:33 Aaron Schmidt LP-SIS  41790-239956-8In progressTesting restraint insulator prototypeMonday, April 04, 2016, 11:31: Begin roughing.
(No plasma electrode)
Monday, April 04, 2016, 12:47: Started
 Anode_Voltage_VS_Current.xlsxTS-2016-04-05_Restraint_Test.rgaTS-2016-04-13_Restraint_Test.rgaRP#1.docx 
  503   Wednesday, April 13, 2016, 13:03 Aaron Schmidt LP-SIS  41790-239956-8 Testing restraint insulator prototype (2)Wednesday, April 13, 2016, 13:03: Begin
roughing. (Plasma electrode in. Salts in)
Wednesday, April 13, 2016, 13:34:
 Anode_Voltage_and_EE_(neg_bias).xlsxAnode_Voltage_and_EE_(pos_bias).xlsxRP#1_(2).docx 
  507   Monday, May 02, 2016, 16:03 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator TestMonday, May 02, 2016, 16:01: Roughing.
Monday, May 02, 2016, 16:35: Turbos
started -AM
 TS-2016-05-02_EE_insulator_test.rga 
  508   Friday, May 06, 2016, 10:18 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test (2) No PEFriday, May 06, 2016, 10:18: Begin roughing
Venting: VCR on HS not closed
Friday, May 06, 2016, 12:58: Roughing
  
  509   Thursday, May 12, 2016, 13:32 Aaron SchmidtSiCLP-SIS  41077-3  EE new insulator Test, No PE , Dirty EE.Thursday, May 12, 2016, 13:00: Begin Roughing.
Thursday, May 12, 2016, 13:40: Turbo
Pumps started
  