382
|
Monday, May 26, 2014, 14:15 |
Aurelia Laxdal | SiC#30 | HP-FEBIAD | ITE | TM3 | | | Done | SiC#30 HV and Heaters Conditioning | HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line |
|
|
384
|
Friday, June 13, 2014, 08:43 |
Anders Mjos | SiC#30 | HP-FEBIAD | ITE | TM3 | 38481-8 | 39956-5 | Done | SiC#30 HV and Heaters Conditioning |
|
|
|
394
|
Friday, July 18, 2014, 11:30 |
Anders Mjos | UC#10 | LP-SIS | ITE | TM4 | 40282-5 | 40316-1 | Done | UC#10 Heat Shield Conditioning | Friday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos |
|
|
397
|
Friday, August 08, 2014, 12:45 |
Anders Mjos | ZrC#6 | LP-SIS | ITW | TM1 | 40282-3 | 39230-5 | Done | Condictioning ZrC#6 | Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting |
|
|
402
|
Friday, August 29, 2014, 14:52 |
Anders Mjos | Ta#44 | HP-SIS | ITE | TM4 | 38817-9 | 40316-11 | Done | Conditioning Ta#44 | Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting
turbos. |
|
|
403
|
Monday, September 08, 2014, 16:23 |
Anders Mjos | UC#11 | | | TM4 | 40282-5 | | Done | UC#11 Heat Shield Conditioning | T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right |
|
|
404
|
Thursday, September 25, 2014, 15:44 |
Anders Mjos | ThO#1 | | ITW | TM1 | 40282-5 | | Done | ThO#1 Heat Shield Conditioning | Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos |
|
|
433
|
Thursday, April 02, 2015, 15:42 |
Anders Mjos | TM2 Test Target | LP-FEBIAD | | TM2 | | 39230-1 | Done | TM2 Test Target Conditioning | Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12:
Turbos started |
|
|
462
|
Friday, September 11, 2015, 11:43 |
Anders Mjos | Ta#46 | HP-SIS | ITE | TM4 | | | Done | Ta#46 conditioning | EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing |
|
|
543
|
Friday, September 30, 2016, 11:11 |
Aaron Schmidt | SiC#35 | HP-FEBIAD | ITW | TM2 | 39530-9 | 41120-8 | Done | Conditioning SiC#35 | Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01:
Roughing stopped. RP1 failure. Breaker tripped. |
6x |
|
564
|
Wednesday, January 25, 2017, 09:48 |
Aaron Schmidt | | | | | 41882-4 | 41751-6 | Done | Out gas Heat Shield for Target cleaning test | No EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in |
7x |
|
565
|
Wednesday, January 25, 2017, 14:54 |
Aaron Schmidt | | | | | 42218-9 | 41751-6 | Done | Target cleaning test HP-SIS CC Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
566
|
Wednesday, January 25, 2017, 14:55 |
Aaron Schmidt | | | | | 42218-6 | 41751-6 | Done | Target cleaning test (Long) HP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
567
|
Wednesday, January 25, 2017, 14:56 |
Aaron Schmidt | | | | | 42218-14 | 41751-6 | Done | Target cleaning test LP-SIS CC Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
568
|
Wednesday, January 25, 2017, 14:57 |
Aaron Schmidt | | | | | 42218-11 | 41751-6 | Done | Target cleaning test LP-SIS Full Clean |
v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}
|
|
|
600
|
Wednesday, July 19, 2017, 09:13 |
Aaron Schmidt | Ta Targets | | | | | | Done | Ion Peaks | Attached is a recent list of Ta targets
with their extracted ions peaks. |
|
|
617
|
Tuesday, December 12, 2017, 08:32 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Pump down w/ possible outgas | Check achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in. |
|
|
618
|
Wednesday, December 20, 2017, 09:11 |
Aaron Schmidt | | LP-SIS | | | (Blank) | 42752-3 | Done | Holiday Shut Down | Power/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07: |
|
|
621
|
Monday, January 22, 2018, 09:04 |
Aaron Schmidt | | | | | | | Done | Power outage & Controller replacement. | Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. |
|
|
622
|
Friday, January 26, 2018, 11:10 |
Aaron Schmidt | | | | | | | Done | Helium tank replacement | Friday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank |
|