  Test-Stand, Page 35 of 53  Not logged in ELOG logo
  ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Statusdown Subject Text Attachments
  382   Monday, May 26, 2014, 14:15 Aurelia LaxdalSiC#30HP-FEBIADITETM3  DoneSiC#30 HV and Heaters Conditioning HV and Heaters Conditioning for SiC#30
was completed Friday, May 23, 2014. The target
was cooled down and it's ready for the on-line
 SiC#30_Conditioning_2nd_time.docx 
  384   Friday, June 13, 2014, 08:43 Anders MjosSiC#30HP-FEBIADITETM338481-839956-5DoneSiC#30 HV and Heaters Conditioning

    

       
            
  
  394   Friday, July 18, 2014, 11:30 Anders MjosUC#10LP-SISITETM440282-540316-1DoneUC#10 Heat Shield ConditioningFriday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting
turbos
  
  397   Friday, August 08, 2014, 12:45 Anders MjosZrC#6LP-SISITWTM140282-339230-5DoneCondictioning ZrC#6Friday, August 08, 2014, 12:44: Stopped
turbos
Friday, August 08, 2014, 14:42: Venting 
  
  402   Friday, August 29, 2014, 14:52 Anders MjosTa#44HP-SISITETM438817-940316-11DoneConditioning Ta#44Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting
turbos.
  
  403   Monday, September 08, 2014, 16:23 Anders MjosUC#11  TM440282-5 DoneUC#11 Heat Shield ConditioningT/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
 Thermocouples.xlsx 
  404   Thursday, September 25, 2014, 15:44 Anders MjosThO#1 ITWTM140282-5 DoneThO#1 Heat Shield ConditioningThursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06:
Starting turbos
  
  433   Thursday, April 02, 2015, 15:42 Anders MjosTM2 Test TargetLP-FEBIAD TM2 39230-1DoneTM2 Test Target ConditioningThursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12:
Turbos started
 TM2_FEBIAD_Test_Target.docxER_Scans.zip 
  462   Friday, September 11, 2015, 11:43 Anders MjosTa#46HP-SISITETM4  DoneTa#46 conditioningEE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0:
Roughing
 Ta#46.docx 
  543   Friday, September 30, 2016, 11:11 Aaron SchmidtSiC#35HP-FEBIADITWTM239530-941120-8DoneConditioning SiC#35Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01:
Roughing stopped. RP1 failure. Breaker tripped.
 6x 
  564   Wednesday, January 25, 2017, 09:48 Aaron Schmidt    41882-441751-6DoneOut gas Heat Shield for Target cleaning testNo EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in
 7x 
  565   Wednesday, January 25, 2017, 14:54 Aaron Schmidt    42218-941751-6DoneTarget cleaning test HP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}


 HP-SIS_CC_Clean.docxTS-2017-01-30-11-00.rgaOMEGA_OM-DAQPRO-5300_01-Feb-17_15.36.02.dlp 
  566   Wednesday, January 25, 2017, 14:55 Aaron Schmidt    42218-641751-6DoneTarget cleaning test (Long) HP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 HP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_07-Feb-17_09.17.23.dlpTS-2017-02-01-10-40.rgaTS-2017-02-03-08-50.rga 
  567   Wednesday, January 25, 2017, 14:56 Aaron Schmidt    42218-1441751-6DoneTarget cleaning test LP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp 
  568   Wednesday, January 25, 2017, 14:57 Aaron Schmidt    42218-1141751-6DoneTarget cleaning test LP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga 
  600   Wednesday, July 19, 2017, 09:13 Aaron SchmidtTa Targets     DoneIon PeaksAttached is a recent list of Ta targets
with their extracted ions peaks.
 Magnet_peaks.xlsx 
  617   Tuesday, December 12, 2017, 08:32 Aaron Schmidt LP-SIS  (Blank)42752-3DonePump down w/ possible outgasCheck achievable vacuum. Watch for spikes
on RGA. Silver bolts removed from the chamber.
Vented steel screws in.
 Empty_Chamber_-_Silver_bolts_removed.docxTS-2017-12-12-09-00.rgaTS-2017-12-13-06-50.rga 
  618   Wednesday, December 20, 2017, 09:11 Aaron Schmidt LP-SIS  (Blank)42752-3DoneHoliday Shut DownPower/sources already off. The water cooling
is currently left on.
Wednesday, December 20, 2017, 09:07:
  
  621   Monday, January 22, 2018, 09:04 Aaron Schmidt      DonePower outage & Controller replacement.Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00:
ISAC PLC TLCIOC Restarted. 
  
  622   Friday, January 26, 2018, 11:10 Aaron Schmidt      DoneHelium tank replacementFriday, January 26, 2018, 11:08: New Helium
tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank
  