  563   Tuesday, January 24, 2017, 14:14 Aaron Schmidt       Calibrated leak tanks removedTuesday, January 24, 2017, 13:30: Calibrated
leak tanks of Argon & Neon removed. Both
old Neon tanks were re-installed in their
  
  564   Wednesday, January 25, 2017, 09:48 Aaron Schmidt    41882-441751-6DoneOut gas Heat Shield for Target cleaning testNo EE. Insulators, gripper arms, and blank
EE plate included
-New grounded 9 pins included in
 7x 
  565   Wednesday, January 25, 2017, 14:54 Aaron Schmidt    42218-941751-6DoneTarget cleaning test HP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}


 HP-SIS_CC_Clean.docxTS-2017-01-30-11-00.rgaOMEGA_OM-DAQPRO-5300_01-Feb-17_15.36.02.dlp 
  566   Wednesday, January 25, 2017, 14:55 Aaron Schmidt    42218-641751-6DoneTarget cleaning test (Long) HP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 HP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_07-Feb-17_09.17.23.dlpTS-2017-02-01-10-40.rgaTS-2017-02-03-08-50.rga 
  567   Wednesday, January 25, 2017, 14:56 Aaron Schmidt    42218-1441751-6DoneTarget cleaning test LP-SIS CC Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_CC_Clean.docxTS-2017-02-07-10-40.rgaOMEGA_OM-DAQPRO-5300_09-Feb-17_10.49.31.dlp 
  568   Wednesday, January 25, 2017, 14:57 Aaron Schmidt    42218-1141751-6DoneTarget cleaning test LP-SIS Full Clean

v\:* {behavior:url(#default#VML);}
o\:*
{behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape
{behavior:url(#default#VML);}

 LP-SIS_Full_Clean.docxOMEGA_OM-DAQPRO-5300_15-Feb-17_13.30.42.dlpTS-2017-02-09-10-40.rga 
  569   Monday, February 06, 2017, 09:14 Aaron Schmidt      Problems/SolutionsPower outage.Weekend power outage. All turbos were tripped.
Epics white out. Control group notified.
Monday, February 06, 2017, 09:07:
  
  570   Wednesday, February 15, 2017, 13:42 Aaron Schmidt    42218-1141751-6Problems/SolutionsVacuum Check (Water leak)*Vacuum from previous test still active,
minus turbo pumps. Same target, & heat
shield as well.*
  
  571   Tuesday, February 21, 2017, 10:35 Aaron Schmidt    42218-1141751-6Problems/SolutionsWater leak (E)(G)Water leak found on water block lines (E)
& (G) on FS #3.
Both lines were removed at the water
  
  573   Wednesday, March 22, 2017, 09:37 Anders Mjos       Pump down empty chamberWednesday, March 22, 2017, 09:3: Roughing
Wednesday, March 22, 2017, 10:05:
Turbos started
  
  575   Tuesday, April 04, 2017, 14:33 Aaron Schmidt       Power supply failure to E-rigWednesday, March 29, 2017, 15:15: DAC power
supply appears to have failed. Pop sound
and electrical smoke/smell noticed.
 20170330_094009.jpg20170330_094019.jpg20170407_115355.jpg20170407_115223.jpg20170407_115414.jpg 
  576   Thursday, April 06, 2017, 12:06 Aaron Schmidt HP-FEBIAD-CTL    In progressTri-Coil CTL-FEBIAD testThursday, April 06, 2017, 12:06: Roughing.
Thursday, April 06, 2017, 13:07:
Turbo pumps on.
  
  577   Monday, April 10, 2017, 15:12 Anders Mjos      Problems/SolutionsVacuum leak on front doorThe vacuum behaved erratic over night with
excursion up into the mid 10^-6 Torr range.
To investigate the chamber was vented. With
  
  578   Wednesday, April 12, 2017, 16:04 Anders Mjos      Problems/SolutionsLeak on FS#3 COIL and EEA water to vacuum leak has been found on
FS#3. The leak is not detected on the leak
detector, but can be seen as an increase
 2017-04-12_COIL_Leak_IG1.png2017-04-12_COIL_Leak_RGA.png4-18-2017_TP1B_&_water_leak.docx 
  579   Tuesday, April 18, 2017, 07:46 Aaron Schmidt      Problems/SolutionsTSG:TP1B & TSG:BV1B trippedTuesday, April 18, 2017, 07:30: TSG : TP1B
Tripped on Saturday.
Tuesday, April 18, 2017, 07:40: TSG
 Cooling_&_Turbo_Replacement.docx 
  580   Tuesday, May 02, 2017, 14:03 Aaron Schmidt       Pump down empty chamber. (FS#3 out)Check to fit lines FS#3
Tuesday, May 02, 2017, 14:00: Rouging. 

Wednesday, May 03, 2017,
 20170504_133718.jpg20170504_133723.jpg20170504_133728.jpg20170504_133735.jpg 
  583   Wednesday, May 10, 2017, 15:07 Aaron Schmidt       Pump down empty chamber. (FS#3 out)FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos
 05-11-2017_Water_leak.docx 
  584   Tuesday, May 16, 2017, 14:25 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IIICoil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
 8x 
  585   Wednesday, May 17, 2017, 10:17 Anders Mjos HP-FEBIAD-CTL    Problems/SolutionsSparking between new coil line and ground electrodeWednesday, May 17, 2017, 10:17: Sparking
around 20 kV. Will need to vent to increase
gap between water lines.
  
  586   Monday, May 22, 2017, 09:43 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IVMonday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo
pumps started.
 CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga 