Monday, May 26, 2014, 14:15, Aurelia Laxdal, SiC#30, HP-FEBIAD, ITE, TM3, , , Done, SiC#30 HV and Heaters Conditioning
|
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation. |
Friday, June 13, 2014, 08:43, Anders Mjos, SiC#30, HP-FEBIAD, ITE, TM3, 38481-8, 39956-5, Done, SiC#30 HV and Heaters Conditioning
|
Aurelia Laxdal wrote: |
HV and Heaters Conditioning for SiC#30 was completed Friday, May 23, 2014. The target was cooled down and it's ready for the on-line installation.
|
Friday, June 13, 2014, 08:43: Turbos stopped. Vacuum at 1.2E-7 T
Monday, June 16, 2014, 08:26: Venting. Water purged.
Monday, June 16, 2014, 09:00: Target removed |
Friday, July 18, 2014, 11:30, Anders Mjos, UC#10, LP-SIS, ITE, TM4, 40282-5, 40316-1, Done, UC#10 Heat Shield Conditioning
|
Friday, July 18, 2014, 11:30: Roughing
Friday, July 18, 2014, 11:51: Starting turbos
Friday, July 18, 2014, 11:59: Turbos at speed.
Friday, July 18, 2014, 12:01: Vacuum at 1.4E-5 T
Monday, July 21, 2014, 08:51: Opened water for HS circuit. Small vacuum "bump" recovered to 1.5E-7 T
Monday, July 21, 2014, 09:17: Starget TGHT autoramping to 580A @ 2 A/min
Monday, July 21, 2014, 14:05: TGHT @ 580A 7.47V.
Tuesday, July 22, 2014, 10:41: Data logger installed
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
37.6 |
3.7 |
TBHT |
28.5 |
6.1 |
COIL + EE |
28.7 |
4.8 |
TGHT |
31.0 |
5.4 |
Tuesday, July 22, 2014, 13:41: BIAS / EZL / EE to 30 / 14 /2 kV. EE:RDCUR 695 uA
Tuesday, July 22, 2014, 14:23: Starting cool down of TGHT 2A/min. Vacuum at 2.7E-7 T
Wednesday, July 23, 2014, 09:05: BIAS / EZL / EE off. Turbos off. Vacuum at 1.3E-7 T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.5 |
3.7 |
TBHT |
28.3 |
6.1 |
COIL + EE |
29.2 |
5.2 |
TGHT |
28.4 |
5.7 |
Wednesday, July 23, 2014, 14:05: Purged HS water line.
Wednesday, July 23, 2014, 14:07 : Venting
Wednesday, July 23, 2014, 14:33: Heat Shield removed |
Friday, August 08, 2014, 12:45, Anders Mjos, ZrC#6, LP-SIS, ITW, TM1, 40282-3, 39230-5, Done, Condictioning ZrC#6
|
Friday, August 08, 2014, 12:44: Stopped turbos
Friday, August 08, 2014, 14:42: Venting
Target assembly inserted
Friday, August 08, 2014, 15:08: Roughing
Friday, August 08, 2014, 15:29: Turbos started
Friday, August 08, 2014, 15:37: Turbos at speed
Friday, August 08, 2014, 15:39: Vacuum at 1.4E-5 T
Monday, August 11, 2014, 08:58: Opened HS cooling water. Vacuum stable at 1.6E-7 T
Tuesday, August 12, 2014, 10:31: IV4 Opened
Tuesday, August 12, 2014, 10:35: EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 12, 2014, 10:39: Starting target heat to 300 A / 96 (115) A
Wednesday, August 13, 2014, 08:03 : Continue heating to 580 A / 190 (228) A
Wednesday, August 13, 2014, 08:24: Aborting target heating. Cu-LCW pressure and flow is reduced due to a problem with a pump.
Device |
Flow
[lpm] |
Temp
[C]
|
HS + MSP |
1.9 |
27.7 |
TBHT |
4.1 |
23.9 |
COIL + EE |
3.5 |
25.1 |
TGHT |
3.7 |
25.6 |
SUPPLY |
|
24.4 |
Supply pressure ~ 52 psi
Return pressure ~ 11 psi
Wednesday, August 13, 2014, 08:31: Starting cool down as flow rate on HS + MSP is low. A low flow trip of the TGHT should be avoided.
Wednesday, August 13, 2014, 11:54 : Curtis Ballard contacted me and asked if they could valve off the Cu-LCW circuit to the Test Stand. Heaters had been previously brought down. Bias off and power supplies are switched off. IV4 closed.
Wednesday, August 13, 2014, 12:00: Cooling water syupply valved off to Test Stand.
Flow rates are back to normal since yesterday evening
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.1 |
27.8 |
TBHT |
5.9 |
27.4 |
COIL + EE |
5.0 |
28.3 |
TGHT |
5.4 |
27.6 |
SUPPLY |
|
28.1 |
Thursday, August 14, 2014, 08:00: Conditioning on hold due to FC0 problem
Wednesday, August 20, 2014, 07:50: Conditioning continues. Auto-ramping to 400 / 150 ( 180) A @ 4/2 A/min
Wednesday, August 20, 2014, 09:35 : Continue heating to 580 / 165 (200) A @ 2/1 A/min
Wednesday, August 20, 2014, 09:50
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.6 |
32.9 |
TBHT |
6.5 |
28.5 |
COIL + EE |
5.4 |
29.2 |
TGHT |
5.8 |
29.7 |
SUPPLY |
|
28.8 |
Wednesday, August 20, 2014, 15:15: Power lost to TBHT, TGHT and EE during nominal operation (580/ 183 (220) A). Fault report submitted.
PLC cabinet work finished. Resuming conditioning.
Tuesday, August 26, 2014, 16:35:EZL / EE / BIAS to 14 / -1.5 / 30 kV
Tuesday, August 26, 2014, 16:35: Starting target heat to 50 A / 25 A
Wednesday, August 27, 2014:
Continued conditioning. Heating to 580 /190 (228) A
Thursday, August 28, 2014, 08:34
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.5 |
38.0 |
TBHT |
6.4 |
28.0 |
COIL + EE |
5.5 |
29.8 |
TGHT |
5.8 |
30.3 |
SUPPLY |
|
28.2 |
Friday, August 29, 2014, 10:30: EE conditioned for ~20 min @ 2kV.
Friday, August 29, 2014, 10:32 : Starting cool down at 4/2 A/min
Friday, August 29, 2014, 11:55: Closed IV4
Friday, August 29, 2014, 11:56: BIAS, EE and EZL to 0
Friday, August 29, 2014, 13:10: Stopped turbos.
Friday, August 29, 2014, 14:06: Venting
Friday, August 29, 2014, 14:51: Target removed |
Friday, August 29, 2014, 14:52, Anders Mjos, Ta#44, HP-SIS, ITE, TM4, 38817-9, 40316-11, Done, Conditioning Ta#44
|
Friday, August 29, 2014, 14:51: Roughing
Friday, August 29, 2014, 15:11: Starting turbos.
Friday, August 29, 2014, 15:19: Turbos at speed
Friday, August 29, 2014, 15:21: Vacuum at 1.6E-5 T
Tuesday, September 02, 2014, 08:36: HS cooling water supply opened. Vacuum stable at 1.4E-7 T
Tuesday, September 02, 2014, 08:50 : BIAS/ EZL / EE to 30 / 14 / -1.5 kV. Started auto ramping to 500 / 150 (180) A
Tuesday, September 02, 2014, 09:23
Supply ~97psi, Return ~7psi
Device
|
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.9 |
28.0 |
TBHT |
6.5 |
27.6 |
COIL + EE |
5.4 |
28.6 |
TGHT |
5.8 |
27.8 |
SUPPLY |
|
28.2 |
Thursday, September 04, 2014, 12:38 : Starting cool-down
Thursday, September 04, 2014, 15:20: Closed IV4
Thursday, September 04, 2014, 15:37 : BIAS / EZL / EE to 0
Friday, September 05, 2014
Target cooled down. Power supplies switched off.
Monday, September 08, 2014, 14:07: Turbos stopped.
Monday, September 08, 2014, 15:15: Venting. HS cooling water lines purged.
Monday, September 08, 2014, 16:00: Target removed. |
Monday, September 08, 2014, 16:23, Anders Mjos, UC#11, , , TM4, 40282-5, , Done, UC#11 Heat Shield Conditioning
|
T/C installed
CH 1: Attached to TGHT outside middle
CH 2: Through HS outside TGHT right
CH 3: Through HS inside TGHT right
CH 4: Attached to HS on left gripper. Does not read temp
Monday, September 08, 2014, 16:22: Roughing
Monday, September 08, 2014, 16:43: Started turbos
Monday, September 08, 2014, 16:51: Turbos at speed
Monday, September 08, 2014, 16:53: Vacuum at 2.7E-5 T
Tuesday, September 09, 2014, 08:20 : Opened HS water supply. Vacuum stable at 3.7E-7 T
Tuesday, September 09, 2014, 08:21: Starting auto ramping. TGHT to 580 A at 2A/min
Tuesday, September 09, 2014, 08:50 :
Device |
Flow
[lpm] |
Temp
[C] |
HS + MSP |
3.8 |
26.7 |
TBHT |
6.5 |
26.2 |
COIL + EE |
5.3 |
26.9 |
TGHT |
5.8 |
26.3 |
SUPPLY |
|
27.0 |
Wednesday, September 24, 2014, 11:30: T/C attached to tube does no longer read a correct temperature. Cooling down.
Thursday, September 25, 2014, 08:50: Turbos stopped.
Thursday, September 25, 2014, 11:07: Venting
Thursday, September 25, 2014, 14:00: Heat shield removed |
Thursday, September 25, 2014, 15:44, Anders Mjos, ThO#1, , ITW, TM1, 40282-5, , Done, ThO#1 Heat Shield Conditioning
|
Thursday, September 25, 2014, 15:44: Roughing
Thursday, September 25, 2014, 16:06: Starting turbos
Thursday, September 25, 2014, 16:14: Turbos at speed.
Thursday, September 25, 2014, 16:28: Vacuum at 1.9E-5 T
Vacuum was coming down slowly yesterday. Vented this morning to clean o-ring on door.
Friday, September 26, 2014, 08:40: Roughing
Friday, September 26, 2014, 09:02: Starting turbos
Friday, September 26, 2014, 09:10: Turbos at speed
Friday, September 26, 2014, 09:12: Vacuum at 9.7E-6 T
Monday, September 29, 2014, 08:40: Water opened for HS circuit. Vacuum stable at 1.8E-7 T
Monday, September 29, 2014, 13:51: Opened and closed IV4
Wednesday, October 01, 2014, 13:13 : Target cooled down.
Monday, October 06, 2014, 09:10: Turbos stopped. Vacuum at 1.3E-7 T
Monday, October 06, 2014, 10:49: Venting
Tuesday, October 07, 2014, 09:31: Heat Shield removed |
Thursday, April 02, 2015, 15:42, Anders Mjos, TM2 Test Target, LP-FEBIAD, , TM2, , 39230-1, Done, TM2 Test Target Conditioning
|
Thursday, April 02, 2015, 15:42: Roughing
Thursday, April 02, 2015, 16:12: Turbos started
Thursday, April 02, 2015, 16:22: Turbos at speed. Vacuum at 8.7E-6 T
Tuesday, April 07, 2015, 08:24: Opened water for HS. Vacuum stable at 1.1E-7 T
Tuesday, April 07, 2015, 08:25: Pumping on gas lines.
Tuesday, April 07, 2015, 08:37: Finished pumping.
Tuesday, April 07, 2015, 08:41: Opening gas valve to vacuum chamber
Tuesday, April 07, 2015, 08:42: RGA filament on.
Tuesday, April 07, 2015, 08:55: BIAS/EZL/EE to 30/14/1.5 kV
Tuesday, April 07, 2015, 08:55: COIL to 50 A, ANODE to 200 V
Tuesday, April 07, 2015, 09:01: Started auto-heating to 580/250 A at 2 A/min
Tuesday, April 07, 2015, 13:25 : Opened IV4
Tuesday, April 07, 2015, 15:10: Ramping TBHT to 290A
Wednesday, April 08, 2015, 09:27: Opening for Ne gas
Wednesday, April 08, 2015, 12:05: BIAS/EZL to 40/18.5 kV
Wednesday, April 08, 2015, 13:15 :BIAS/EZL/EE to 50/23.5/2.0 kV
Wednesday, April 08, 2015, 15:15: BIAS/EZL/EE to 30/14/1.5 kV
Thursday, April 09, 2015, 11:19: Starting target cool down
Thursday, April 09, 2015, 16:54: BIAS/EZL/EE to 30/30/1.5 kV
Thursday, April 09, 2015, 17:58: BIAS and source off.
Friday, April 10, 2015, 08:21: Closed gas supply
Friday, April 10, 2015, 08:23: Stopped turbos |
Friday, September 11, 2015, 11:43, Anders Mjos, Ta#46, HP-SIS, ITE, TM4, , , Done, Ta#46 conditioning
|
EE is ST-200 material (AlN)
Friday, September 11, 2015, 11:0: Roughing
Friday, September 11, 2015, 12:12: Turbos started.
Friday, September 11, 2015, 12:22: Turbos at speed. Vacuum at 2.2E-5 T
Friday, September 11, 2015, 14:02: RGA on.
Monday, September 14, 2015, 08:05: Opened water for HS circuit. Vacuum stable at 2.3E-7 T. No response on RGA.
Monday, September 14, 2015, 08:08: Opened IV4
Monday, September 14, 2015, 08:11: Starting Target Heat. TGHT/TBHT 580 / 200 A at 2 / 1 A/min. Good/bad vacuum 4E-6 / 6E-6 T
Monday, September 14, 2015, 08:12: Interlock for BIAS does not clear although EE is on. Interlock cleared when beam line elements were turned on
Monday, September 14, 2015, 08:20: BIAS/EZL/EE at 30 / 15 / 1.5 kV
Monday, September 14, 2015, 08:25: Returned MB1 to remote control
Monday, September 14, 2015, 13:28: Target at temperature
Monday, September 14, 2015, 15:06: Heating TBHT to 230 A
Tuesday, September 15, 2015, 15:03: EE to 2 kV
Tuesday, September 15, 2015, 16:39: EE to 1.5 kV
Tuesday, September 15, 2015, 17:01: Starting target cool down
Wednesday, September 16, 2015, 09:01: HV and source off. Closed IV4. Turbos off
Wednesday, September 16, 2015, 12:52: RGA off. Venting |
Friday, September 30, 2016, 11:11, Aaron Schmidt, SiC#35, HP-FEBIAD, ITW, TM2, 39530-9, 41120-8, Done, Conditioning SiC#35 6x
|
Friday, September 30, 2016, 10:00: Roughing.
Friday, September 30, 2016, 10:01: Roughing stopped. RP1 failure. Breaker tripped.
Friday, September 30, 2016, 11:49: Roughing continued.
Friday, September 30, 2016, 12:37: Turbos started -AM
Monday, October 03, 2016, 09:00: RGA on.
Monday, October 03, 2016, 09:05: Waterline opened. No response on RGA. Vacuum stable @1.70E-7T.
Monday, October 03, 2016, 09:20: Power/Sources on. Gas sources opened/closed.
Monday, October 03, 2016, 09:39: Optics switched on. Monitor TMS:SX2
Monday, October 03, 2016, 09:47: Anode on @ 200 V
Monday, October 03, 2016, 09:49: Coil on @ 50A
Monday, October 03, 2016, 09:50: IV4 opened.
Monday, October 03, 2016, 09:58: BIAS / EZL / EE @ 30 / 13 / 1.5 kV .
Monday, October 03, 2016, 10:08: Auto ramping TGHT / TBHT to 580 / 290 A @ 2A per min.
Monday, October 03, 2016, 10:12
Device
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
27.0 |
3.99 |
TBHT |
27.5 |
3.21 |
COIL + EE |
26.8 |
5.26 |
TGHT |
26.9 |
5.78 |
Monday, October 03, 2016, 11:09: TMS:SX2 Fixed. No optics or sources affected.
Monday, October 03, 2016, 11:38: BIAS @ 30 kV. (Was actually set to 20 kV before). Ramping progress ok.
Monday, October 03, 2016, 15:56: TGHT / TBHT @ 580 / 290 A. RGA restarted.
Wednesday, October 05, 2016, 08:29: Optics found to be tripped : TMS:OCT4 , TMS:Q4 ,TMS:OCT3 ,TMS:SX3 ,TMS:Q3 ,TMS:SX2. Restarted
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.3 |
3.99 |
TBHT |
29.9 |
3.14 |
COIL + EE |
28.8 |
5.07 |
TGHT |
30.8 |
5.72 |
Wednesday, October 05, 2016, 09:20: Wire scanners reset. Emittance rig not reading properly.
Wednesday, October 05, 2016, 09:22: Auto ramping TBHT to 300 A @ 2A per min.
Thursday, October 06, 2016, 15:58: Auto-cooling TGHT / TBHT @ 2A per min.
|
Temp
[C] |
Flow
[lpm] |
HS + MSP |
35.4 |
3.95 |
TBHT |
29.4 |
3.09 |
COIL + EE |
28.8 |
5.05 |
TGHT |
30.8 |
5.70 |
Friday, October 07, 2016, 08:12: Source off - AM
Tuesday, October 11, 2016, 08:28: Turbos off. RGA off -AM
Tuesday, October 11, 2016, 13:38: Venting -AM |
Wednesday, January 25, 2017, 09:48, Aaron Schmidt, , , , , 41882-4, 41751-6, Done, Out gas Heat Shield for Target cleaning test 7x
|
No EE. Insulators, gripper arms, and blank EE plate included
-New grounded 9 pins included in brackets
-TGHT included to out gas Heat shield
Wednesday, January 25, 2017, 09:45: Roughing
Wednesday, January 25, 2017, 10:04: Turbo pumps started.
Wednesday, January 25, 2017, 11:26: Ion gauge & RGA on.
Thursday, January 26, 2017, 08:25: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 08:32: Water lines opened. No response on RGA. Vacuum stable @ 1.44e-07T.
Thursday, January 26, 2017, 08:35: Power/sources on.
Thursday, January 26, 2017, 08:37: Auto-ramping TGHT to 580A @ 2A per min. Vacuum @ 1.44e-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
23.5 |
4.02 |
TBHT |
23.3 |
3.13 |
COIL + EE |
23.3 |
5.18 |
TGHT |
23.4 |
5.78 |
Thursday, January 26, 2017, 13:11: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:20: RGA restarted. (Fatal communication error)
Thursday, January 26, 2017, 15:26: RGA being shut down. (Fatal communication error)
Thursday, January 26, 2017, 15:31: RGA Restarted.
Friday, January 27, 2017, 08:06: RGA running ok.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.2 |
3.14 |
COIL + EE |
21.4 |
5.11 |
TGHT |
23.3 |
5.78 |
Friday, January 27, 2017, 15:23: Auto-cooling started @ 2A per min.
Monday, January 30, 2017, 08:02: RGA off. Ion Gauge off. Turbo pumps off.
Monday, January 30, 2017, 08:05: Power/sources off. Water lines purged.
Monday, January 30, 2017, 09:09: Venting. |
Wednesday, January 25, 2017, 14:54, Aaron Schmidt, , , , , 42218-9, 41751-6, Done, Target cleaning test HP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-9: Crystal Clean only.
Monday, January 30, 2017, 09:44: HS removed from test stand. Exchange target.
Monday, January 30, 2017, 10:01: Target # 42218-9 placed into test stand. Door open for 17 minutes.
Monday, January 30, 2017, 10:10: Roughing.
Monday, January 30, 2017, 10:10: Doors sealed for roughing.
Monday, January 30, 2017, 10:11: BV1B OPEN. Opened @ 350T.
Monday, January 30, 2017, 10:29: Both Turbo pumps started.
Monday, January 30, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, January 30, 2017, 10:37: TP1A @ speed 38 KRPM.
Monday, January 30, 2017, 10:40: RGA on. Vacuum @1.24E-05T.
Monday, January 30, 2017, 15:30: Vacuum @ 4.49E-07T.
Tuesday, January 31, 2017, 08:14: Water lines opened. No response on RGA. Vacuum stable @ 1.44E-07T.
Tuesday, January 31, 2017, 08:19: Power/Sources on.
Tuesday, January 31, 2017, 08:20: DAQPro loose. re-connected.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.9 |
3.95 |
TBHT |
20.7 |
3.08 |
COIL + EE |
20.9 |
5.13 |
TGHT |
21.1 |
5.72 |
Tuesday, January 31, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Tuesday, January 31, 2017, 10:00: Check. Vacuum @ 7.73E-07T.
Tuesday, January 31, 2017, 11:40: Check. Vacuum @ 3.42E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
28.4 |
3.92 |
TBHT |
27.0 |
3.45 |
COIL + EE |
23.0 |
5.02 |
TGHT |
24.9 |
5.61 |
Tuesday, January 31, 2017, 13:30: Check. Vacuum @ 2.34E-07T
Tuesday, January 31, 2017, 15:30: Auto-cooling started @ 2A per min.
Wednesday, February 01, 2017, 08:10: Power/sources off.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.2 |
3.95 |
TBHT |
22.2 |
3.06 |
COIL + EE |
22.0 |
5.02 |
TGHT |
22.2 |
5.67 |
Wednesday, February 01, 2017, 08:14: Waterlines purged.
Wednesday, February 01, 2017, 08:15: RGA, Ion gauge, turbo pumps off.
Wednesday, February 01, 2017, 09:15: Venting. |
Wednesday, January 25, 2017, 14:55, Aaron Schmidt, , , , , 42218-6, 41751-6, Done, Target cleaning test (Long) HP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-6: Full Clean. Crystal Clear, Acetone, & Methanol used.
Wednesday, February 01, 2017, 09:47: HS removed from test stand. Exchange target.
Wednesday, February 01, 2017, 10:04: Target # 42218-6 placed into test stand. Door open for 17 minutes.
Wednesday, February 01, 2017, 10:10: Roughing.
Wednesday, February 01, 2017, 10:10: Doors sealed for roughing.
Wednesday, February 01, 2017, 10:11 BV1B OPEN. Opened @ 431T.
Wednesday, February 01, 2017, 10:29: Both Turbo pumps started.
Wednesday, February 01, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Wednesday, February 01, 2017, 10:37: TP1A @ speed 38 KRPM.
Wednesday, February 01, 2017, 10:40: RGA on. Vacuum @ 6.79E-05T.
Wednesday, February 01, 2017, 15:30: Check. Vacuum @ 3.18E-7T.
Thursday, February 02, 2017, 08:15: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Thursday, February 02, 2017, 08:18: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
22.7 |
3.92 |
TBHT |
22.5 |
3.08 |
COIL + EE |
22.5 |
5.10 |
TGHT |
22.7 |
5.66 |
Thursday, February 02, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Thursday, February 02, 2017, 10:00: Check. Vacuum @ 6.76E-07T.
Thursday, February 02, 2017, 11:41: Check. Vacuum @ 3.26E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
29.1 |
3.99 |
TBHT |
23.9 |
3.16 |
COIL + EE |
23.8 |
5.19 |
TGHT |
25.5 |
5.80 |
Thursday, February 02, 2017, 13:30: Check. Vacuum @ 1.97E-07T.
Thursday, February 02, 2017, 15:30: Check. Vacuum @ 1.88E-07T.
Friday, February 03, 2017, 08:45: Check. Vacuum @ 1.62E-07T
Friday, February 03, 2017, 08:50: RGA restarted.
Friday, February 03, 2017, 10:50: Auto-cooling started @ 2A per min.
Monday, February 06, 2017, 08:18: Multiple attempts made to restart epics. Strip tools are not available. Vacuum data not available (White out screen). (see power outage eLog)
Monday, February 06, 2017, 08:20: RGA confirmed shut down.
Monday, February 06, 2017, 08:23: Sources/power off.
Monday, February 06, 2017, 08:25: Water lines purged.
Monday, February 06, 2017, 10:14: Turbo pumps restarted.
Monday, February 06, 2017, 10:19: Ion gauge on. TP1B @ speed 42 KRPM.
Monday, February 06, 2017, 10:22: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 08:13: Turbos off.
Tuesday, February 07, 2017, 09:10: Venting. |
Wednesday, January 25, 2017, 14:56, Aaron Schmidt, , , , , 42218-14, 41751-6, Done, Target cleaning test LP-SIS CC Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
LP-SIS Target # 42218-14: Crystal Clean only.
Tuesday, February 07, 2017, 09:48: HS removed from test stand. Exchange target.
Tuesday, February 07, 2017, 10:07: Target # 42218-14 placed into test stand. Door open for 19 minutes.
Tuesday, February 07, 2017, 10:10: Roughing.
Tuesday, February 07, 2017, 10:10: Doors sealed for roughing.
Tuesday, February 07, 2017, 10:11: BV1B OPEN. Opened @ 430T.
Tuesday, February 07, 2017, 10:29: Both Turbo pumps started.
Tuesday, February 07, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Tuesday, February 07, 2017, 10:37: TP1A @ speed 38 KRPM.
Tuesday, February 07, 2017, 10:39: RGA on. Vacuum @ 1.49E-05T.
Tuesday, February 07, 2017, 15:30: Check. Vacuum @ 3.26E-07T.
Wednesday, February 08, 2017, 08:12: Water lines opened. No response on RGA. Vacuum stable @ 1.29E-07T.
Wednesday, February 08, 2017, 08:14 : Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
20.8 |
4.06 |
TBHT |
20.5 |
3.17 |
COIL + EE |
20.6 |
5.27 |
TGHT |
20.7 |
5.88 |
Wednesday, February 08, 2017, 08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Wednesday, February 08, 2017, 10:00: Check. Vacuum @ 3.33E-07T.
Wednesday, February 08, 2017, 11:40: Check. Vacuum @ 1.70E-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
30.2 |
4.06 |
TBHT |
21.0 |
3.17 |
COIL + EE |
21.1 |
5.22 |
TGHT |
21.3
|
5.82 |
Wednesday, February 08, 2017, 13:30: Check. Vacuum @ 3.53E-07T.
Wednesday, February 08, 2017, 15:30: Auto-cooling started @ 2A per min. Vacuum @ 3.88E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum continues***
Thursday, February 09, 2017, 08:08: Sources/power off.
Thursday, February 09, 2017, 08:10: Water lines purged.
Thursday, February 09, 2017, 08:11: RGA off.
Thursday, February 09, 2017, 09:00: Venting |
Wednesday, January 25, 2017, 14:57, Aaron Schmidt, , , , , 42218-11, 41751-6, Done, Target cleaning test LP-SIS Full Clean
|
Target Test (Fully Cleaned vs Crystal Clean only).
For all tests:
-Start Turbo pumps & Ion gauge as soon as available on ISAC TEST STAND VACUUM Screen.
- Ensure previous test turbos are off by 8:15 and started venting by 9:15am to meet timeline.
-Start Roughing by 10:10am +/- 1 minute.
-TGHT / TBHT ramping starts @ 8:30am. 2A per min to 580A / 200A
ALL START TIMES MUST BE CONSISTENT.
***Pre-outgassed*** Heat Shield W.O# 41751-6: Includes insulators, new Al grounded 9-pin, bracket, & gripper arms. Blank/Plate. No source cup/EE.
HP-SIS Target # 42218-11: Full Clean. Crystal Clear, Acetone, & Methanol used.
Thursday, February 09, 2017, 09:44: HS removed from test stand. Exchange target.
Thursday, February 09, 2017, 10:04: Target # 42218-11 placed into test stand. Door open for 20 minutes.
Thursday, February 09, 2017, 10:10: Roughing.
Thursday, February 09, 2017, 10:10: Doors sealed for roughing.
Thursday, February 09, 2017, 10:11: BV1B OPEN. Opened @ 428T.
Thursday, February 09, 2017, 10:29: Both Turbo pumps started.
Thursday, February 09, 2017, 10:34: Ion gauge on. TP1B @ speed 42 KRPM.
Thursday, February 09, 2017, 10:37: TP1A @ speed 38 KRPM.
Thursday, February 09, 2017, 10:40: RGA on. Vacuum @ 1.45E-05T.
Thursday, February 09, 2017, 10:47: Strip tool Vacuum.Current restarted.
Thursday, February 09, 2017, 15:34: Check. Vacuum @ 3.97E-07T.
***NOTE: Small water anomaly on RGA affecting Vacuum***
***NOTE: Small water anomaly on RGA affecting Vacuum*** Continues. Monitor through heating.
Friday, February 10, 2017, 08:06: Water lines opened. No response on RGA. Vacuum stable @ 3.24E-07T.
Friday, February 10, 2017, 08:08: Power/Sources on.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
24.4 |
4.02 |
TBHT |
24.2 |
3.22 |
COIL + EE |
24.2 |
5.26 |
TGHT |
24.4 |
5.90 |
08:30: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
10:00: Check. Vacuum @ 3.68-4.87E-07T. (Anomaly variant)
11:40: Check. Vacuum @ XE-07T.
Device |
Temp
[C] |
Flow
[lpm] |
HS + MSP |
34.6 |
4.12 |
TBHT |
25.5 |
3.21 |
COIL + EE |
25.5 |
5.29 |
TGHT |
27.3
|
5.88 |
Check. Vacuum @ 4.41E-07T.
Auto-cooling started @ 2A per min. Vacuum @ 4.25E-07T.
Tuesday, February 14, 2017, 08:22: Power/sources off.
Tuesday, February 14, 2017, 08:23: Water lines purged.
Tuesday, February 14, 2017, 08:26: RGA off. Ion Gauge off. Turbo pumps off. |
Wednesday, July 19, 2017, 09:13, Aaron Schmidt, Ta Targets, , , , , , Done, Ion Peaks
|
Attached is a recent list of Ta targets with their extracted ions peaks. |
Tuesday, December 12, 2017, 08:32, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Pump down w/ possible outgas
|
Check achievable vacuum. Watch for spikes on RGA. Silver bolts removed from the chamber. Vented steel screws in.
Tuesday, December 12, 2017, 08:23: Doors open from previous test. (Open for 7 minutes)
Tuesday, December 12, 2017, 08:30: Doors closed. Roughing.
Tuesday, December 12, 2017, 08:50: Turbo pumps on.
Tuesday, December 12, 2017, 08:56: Ion gauge on.
Wednesday, December 13, 2017, 06:46: Check. Vacuum @ 5.44e-07T. RGA Error.
Wednesday, December 13, 2017, 06:49: RGA restarted.
Wednesday, December 13, 2017, 06:52: Water lines opened. Vacuum @ 5.44e-07T
Wednesday, December 13, 2017, 06:54: Power on.
Wednesday, December 13, 2017, 06:56: Auto ramping TGHT / TBHT to 580 / 200 A @ 2A per min.
Friday, December 15, 2017, 13:37: Auto-cooling @ 2A per min
Monday, December 18, 2017, 08:15: Power/source off.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off. |
Wednesday, December 20, 2017, 09:11, Aaron Schmidt, , LP-SIS, , , (Blank), 42752-3, Done, Holiday Shut Down
|
Power/sources already off. The water cooling is currently left on.
Wednesday, December 20, 2017, 09:07: RGA off.
Wednesday, December 20, 2017, 09:08: Both Ion gauges and all 4 turbo pumps off.
Wednesday, December 20, 2017, 11:21: Valves closed. Roughing pumps off.
Wednesday, December 20, 2017, 11:22: RGA shut off completely. |
Monday, January 22, 2018, 09:04, Aaron Schmidt, , , , , , , Done, Power outage & Controller replacement.
|
Computer, TS, epics, restarted. Power checks
Monday, January 22, 2018, 09:00: ISAC PLC TLCIOC Restarted.
Turbo pumps restarted.
Monday, January 22, 2018, 09:26: New controller for TSG:TP1B brought in.
(Connect) Global reset. Resart Turbo pumps.
Monday, January 22, 2018, 09:40: Both turbo pumps @ speed.
Vacuum controls ok
Sources ok
Optics - Issues. Some restart, others do not.
|
Friday, January 26, 2018, 11:10, Aaron Schmidt, , , , , , , Done, Helium tank replacement
|
Friday, January 26, 2018, 11:08: New Helium tank installed inside the Test Stand.
-The 'Full' tag remains. The He tank was not opened.
-The old tank was placed beside the Test Stand beneath/beside the power switch. |
|