  Test-Stand, Page 34 of 53  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
  ID Date Author Target/No.# Source Stationdown Module Target Oven W.O# Heat Shield W.O# Status Subject Text Attachments
  582   Friday, May 05, 2017, 14:28 Aaron SchmidtUC#20LP-IG-LIS     Conditioning Heat shield for UC#20 (2) New O-rings installed on FS#3.
Friday, May 05, 2017, 14:24: Roughing.
Friday, May 05, 2017, 14:34: Waterlines
 UC#20_Heat_shield_conditioning-2.docxTS-2017-05-05-17-11.rgaTS-2017-05-11-07-50.rga 
  583   Wednesday, May 10, 2017, 15:07 Aaron Schmidt       Pump down empty chamber. (FS#3 out)FS#3 lines blanked off.
Wednesday, May 10, 2017, 14:40: Roughing
Wednesday, May 10, 2017, 15:05: Turbos
 05-11-2017_Water_leak.docx 
  584   Tuesday, May 16, 2017, 14:25 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IIICoil loose (Remove lid, Tighten and place
lid again)
Tuesday, May 16, 2017, 14:24: Roughing.
 8x 
  585   Wednesday, May 17, 2017, 10:17 Anders Mjos HP-FEBIAD-CTL    Problems/SolutionsSparking between new coil line and ground electrodeWednesday, May 17, 2017, 10:17: Sparking
around 20 kV. Will need to vent to increase
gap between water lines.
  
  586   Monday, May 22, 2017, 09:43 Aaron Schmidt HP-FEBIAD-CTL     Tri-Coil CTL-FEBIAD test IVMonday, May 22, 2017, 09:41: Roughing.
Monday, May 22, 2017, 10:00: Turbo
pumps started.
 CTL_FEBIAD_Test_IV.docxTS-2017-05-22-10-07.rgaTS-2017-05-25-15-42.rga 
  587   Wednesday, May 24, 2017, 11:12 Anders Mjos      Problems/SolutionsFEBIAD Anode bias configuration The Test Stand has been configured
for Anode bias. John Chow changed the power
supply and the electrical connections have
 20170524-ST-currentvscoil-CHT300A.PNG 
  589   Saturday, June 03, 2017, 09:34 Anders Mjos      Problems/SolutionsFEBIAD Cathode bias configuration


   
        
            
  
  590   Tuesday, June 06, 2017, 09:22 Aaron Schmidt       Pump down empty chamberTuesday, June 06, 2017, 09:21: roughing.

Friday, June 09, 2017, 08:50:
Ion gauge off. Turbo pumps off.
  
  591   Wednesday, June 07, 2017, 12:49 Aaron Schmidt       Gas bottles Gas bottles for FEBIAD testing were
exchanged yesterday around 1:30. One Neon
& one Argon bottle were removed.
  
  593   Friday, June 16, 2017, 11:23 Aaron Schmidt       Pump down empty chamber.Friday, June 16, 2017, 11:22: roughing.
Friday, June 16, 2017, 14:28: Turbo
pumps on
  
  595   Thursday, July 06, 2017, 13:16 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressConditioning Ta spare for Ta#52Thursday, July 06, 2017, 13:56: Roughing.
Thursday, July 06, 2017, 14:25: Turbo 
pumps started.
 10x 
  597   Monday, July 17, 2017, 09:55 Aaron Schmidt    41882-442738-1In progressOut Gas HS for Target Cleaning Test-No EE. Insulators, gripper arms,
and blank EE plate included
 OMEGA_OM-DAQPRO-5300_24-Jul-17_10.23.02.dlpTarget_Cleaning_Test_HS_Outgassing.docxTS-2017-07-17-11-17.rga 
  598   Monday, July 17, 2017, 09:58 Aaron Schmidt HP-SIS  42218-842738-1 Target cleaning test (Long) HP-SIS CC Clean    HP-SIS_CC_Clean_(Long).docxOMEGA_OM-DAQPRO-5300_27-Jul-17_10.25.04.dlpTS-2017-07-24-10-40.rga 
  599   Monday, July 17, 2017, 10:04 Aaron Schmidt HP-SIS  42218-1042738-1 Target cleaning test HP-SIS Full Clean    HP-SIS_Full_Clean_(Short).docxTS-2017-07-27-10-40.rga 
  600   Wednesday, July 19, 2017, 09:13 Aaron SchmidtTa Targets     DoneIon PeaksAttached is a recent list of Ta targets
with their extracted ions peaks.
 Magnet_peaks.xlsx 
  601   Thursday, August 03, 2017, 17:00 Anders Mjos      Problems/SolutionsVacuum system tripped on power interruption Thursday, August 03, 2017, 17:00:
Restarted TPs
  
  602   Tuesday, August 15, 2017, 08:41 Aaron SchmidtTa#55LP-SIS  42218-1142738-2In progressTBHT sight in testHeat TGHT to 580 A & TGHT to 
200 A for view port test.
Tuesday, August 15, 2017, 08:40:
  
  603   Thursday, August 17, 2017, 12:45 Anders Mjos      Problems/SolutionsTBHT power supply removed  The Xantrex 10V 600 A power supply
for the TBHT has been moved to ITE to replace
the failed TGHT power supply
  
  604   Monday, August 21, 2017, 16:20 Anders Mjos      Problems/SolutionsTBHT power supply removed


   
        
            
  
  606   Monday, September 25, 2017, 14:10 Aaron Schmidt       Pump down empty chamberMonday, September 25, 2017, 14:10: Roughing.

Wednesday, September 27,
2017, 08:23: Turbo pumps on
  