  793   Tuesday, May 19, 2020, 06:01 Aaron Schmidt     42972-8Problems/SolutionsLeak check / Troubleshoot https://elog.triumf.ca/TIS/Test-Stand/791
 May_19-20_Leak_check_-_FS#3.docxMess_inside_TS_-_1.jpgMess_inside_TS_-_2.jpgBlock_water_leak_visible.jpg 
  809   Wednesday, August 19, 2020, 08:52 Aaron Schmidt       Leak check / TroubleshootWednesday, August 19, 2020, 08:52: Purging
all lines, except FS#5, It was already purged
/ closed.
 Aug_19_-_2020_Leak_Check..docx 
  818   Monday, November 02, 2020, 08:52 Aaron Schmidt      Problems/SolutionsLeak check / TroubleshootMonday, November 02, 2020, 08:46:
Large Vacuum spike noted 5:30 approx.
Tripped TS. On tail end of the Nb#9 conditioning
 Nov-2-2020_Leak.docx 
  739   Wednesday, June 26, 2019, 14:41 Carla Babcocknone     Problems/SolutionsIssues with test stand wiring in service cap areaThe wiring on the top of the test stand
was burned, see entry 737.
Probable cause of this is as follows:
 isk4523d_ITSrewiring_June2019.png 
  600   Wednesday, July 19, 2017, 09:13 Aaron SchmidtTa Targets     DoneIon PeaksAttached is a recent list of Ta targets
with their extracted ions peaks.
 Magnet_peaks.xlsx 
  82   Thursday, May 10, 2012, 09:48 Anders Mjos      Problems/SolutionsIon Gauge filament replaced

    

       
            
  
  77   Friday, April 20, 2012, 08:56 Anders MjosNb#6LP-SISITWTM1  Problems/SolutionsInsulator stand-off failure When the target was removed from
the test stand it was discovered that the
custom designed insulator stand-off (ITD0400
 ITW-TM1-Nb#6-LP-SIS_-_TestStand.pdf 
  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling See attached photo  Nb#7_swelling_insulator.pdf 
  430   Thursday, February 26, 2015, 10:11 Anders Mjos      In progressInstalling FEBIAD test target for emittance rig testsThursday, February 26, 2015, 10:11: Stopped
turbos
Thursday, February 26, 2015, 11:23:
 ER_Test_w_FEBIAD.docxFebiadTS.xls 
  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator trainingThursday, September 20, 2012, 15:50: Roughing
Thursday, September 20, 2012, 15:54:
Aborting. VCR for gas line not connected.
  
  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

    

       
            
  
  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed throughNo wires connected yet.
Monday, June 22, 2015, 15:48: Roughing

Tuesday, June 23, 2015, 09:05:
 9-pin_feed_through.jpg 
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate A gauge and a valve was installed
on the roughing line to the large turbo pump
  
  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source TraySilver bolts on TGHT & Coil Lines.
Oxide steel bolts on TBHT. Filed target to
suit / fit (Previously heated). Rubber O-rings
 TM4_Source_Tray_-_2019_-_Leak_Check.docxTM4_Source_Tray_-_2019.docxTS-2019-05-27-07-08.rga 
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2IDP15 Scroll Pump, Std w/ inlet.
TMS:RP2
PN: X3815-64010
  
  283   Tuesday, March 19, 2013, 12:34 Anders MjosSiC#28 ITETM4  DoneInstallation of SiC#28 LP-RFQTuesday, March 19, 2013, 12:32 : Turbos
off (vaccum at 2E-7 Torr)
Tuesday, March 19, 2013, 13:35: Venting
 grab.n5HwXJ.png20130321_heating_and_signal.PNG 
  879   Wednesday, June 09, 2021, 14:31 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressInstall MB1 window & 9 pin for V test.Installed a new window on MB1 as per Aurelia.
Connect modified 9 pin connector & voltage
meters for Ta#62 testing.
 Ta#62_voltage_tests.docx 
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test StandISAC Test Stand FEBIAD Ion Source and ISACT
optics screen grabs before practicing tuning. 
Tune saved as: data/febiaddata/tune/120228-1620_0.snap
 grab.V13332.pnggrab.m13336.png 
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3Changed the gaskets from C-seals on FS#3
water blocks E, F,& H. G was already
done.
  
  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed outContacted Graham W. (controls) to have
a look. It turned out to be a limit switch
problem. Removed and reinstalled limit switch
  