ID Date Author Target/No.# Source Station Module Target Oven W.O# Heat Shield W.O# Status Subjectdown
  793   Tuesday, May 19, 2020, 06:01 Aaron Schmidt     42972-8Problems/SolutionsLeak check / Troubleshoot

 https://elog.triumf.ca/TIS/Test-Stand/791

https://elog.triumf.ca/TIS/Test-Stand/792

Tuesday, May 19, 2020, 06:01: Venting. 

Troubleshoot / Leak Check ISAC TS.

Tuesday, May 19, 2020, 06:35: Quite a bit of condensation was found inside the TS. Most lines had water on them.

Tuesday, May 19, 2020, 07:09: Wiped out the interior. Running a fan inside to aid in the drying.

Tuesday, May 19, 2020, 08:20:

Opened lines FS#2,3,4. No visual leaks detected.

Installed previously used/outgassed HS (Ferran's tests). Replaced all the bolts.

Roughing.

Tuesday, May 19, 2020, 08:32: Multiple attempts made to rough. Doors not sealing?

Tuesday, May 19, 2020, 08:58: IT FINALLY SEALED!!! (Assistance was provided on the doors)

Tuesday, May 19, 2020, 09:02: BV1B Open.

Tuesday, May 19, 2020, 10:54: Vacuum @ 15.339 T.

Tuesday, May 19, 2020, 10:59: FS#2 opened.

Tuesday, May 19, 2020, 11:02: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:03: FS#3 opened.

Tuesday, May 19, 2020, 11:06; Vacuum @ 15.069 T

Tuesday, May 19, 2020, 11:07: FS#4 opened.

Tuesday, May 19, 2020, 11:10: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:11: FS#5 Opened.

Tuesday, May 19, 2020, 11:13: Vacuum @ 15.069 T.

Tuesday, May 19, 2020, 11:30: Close & purge cooling lines. Observe Vacuum.


Left open overnight. Ran the fan on it this morning.

All water lines into the TS closed. FS# 2,3,4,5, & 8.

Wednesday, May 20, 2020, 08:35: Roughing.

Wednesday, May 20, 2020, 08:50: BV1B open. Vacuum at 8 T and dropping.

Wednesday, May 20, 2020, 10:12: Vacuum at 2.635 T.

Wednesday, May 20, 2020, 10:14: FS#2 opened.

Wednesday, May 20, 2020, 10:17: Vacuum @  2.646 T.

Wednesday, May 20, 2020, 10:19: FS#3 opened.

Wednesday, May 20, 2020, 10:24: Vacuum @ 2.764  T

Wednesday, May 20, 2020, 10:25: FS#4 opened.

Gradual increase is noted, but no obvious spike.

Wednesday, May 20, 2020, 10:28: Vacuum @  2.816 T.

Wednesday, May 20, 2020, 10:32: Vacuum @ 3.606 T.

Starting to spike.

Wednesday, May 20, 2020, 10:36: Closed supply / return. Purged. Closed the lines Vacuum @  4.173 T.

Wednesday, May 20, 2020, 10:54: Vacuum @ 3.984 T.

Wednesday, May 20, 2020, 10:58: FS#2 opened.

Wednesday, May 20, 2020, 11:10: Vacuum @ 3.858 T.

Wednesday, May 20, 2020, 11:11: FS#3 opened. Vacuum spiking 4.3T +

Wednesday, May 20, 2020, 11:15: Closed supply / return. Purged. Closed the lines Vacuum @  4.614 T.

Wednesday, May 20, 2020, 11:47: Venting.

Wednesday, May 20, 2020, 13:12: Significant leak discovered on FS#3. Pressurized the lines to full pressure with water and waited 15 minutes. Small drops seen pushing out from the water block.

Removed old O-ring (Appeared to have a warp/bulge, very faint) Replaced with Sn C-Seal "Small Package" MIL-DTL-117H-TII C-E S-I / MIL-PRF-131K C-II.

T= 0.095"

D= 0.424"

Wednesday, May 20, 2020, 14:02: Roughing.

Wednesday, May 20, 2020, 14:08: BV1B open.

Wednesday, May 20, 2020, 15:28: Vacuum @ 1.242 T

Wednesday, May 20, 2020, 15:29: Open FS#3.

Wednesday, May 20, 2020, 15:31: Close FS#3 supply / return. Purged. Closed the lines Vacuum @  2.462 T.

Wednesday, May 20, 2020, 15:42: Start venting to 200 T. 


Removed Right coil line on FS#3 and blanked it off (G) (H).

Monday, May 25, 2020, 14:00: Roughing.

Monday, May 25, 2020, 14:02: BV1B open.

Monday, May 25, 2020, 15:16: Turbo pumps on.

Monday, May 25, 2020, 15:25: Ion gauge on.


Wednesday, May 27, 2020, 10:28: Ion gauge & turbo pumps off. 

FS#(G)(H) right coil line -  Lower G water block replaced leak checked / cleaned.

Line re-installed.

Wednesday, May 27, 2020, 12:56: Roughing.

Wednesday, May 27, 2020, 13:39: Turbo pumps on.

Wednesday, May 27, 2020, 13:47: Ion gauge on.


Monday, June 01, 2020, 06:47: Vacuum @ 5.12e-06T

Monday, June 01, 2020, 06:50: FS#3 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 06:57: FS#2 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:01: FS#4 opened. Vacuum @ 5.12e-06T.

Monday, June 01, 2020, 07:04: FS#5 opened. Vacuum @ 5.10e-06T.

Monday, June 01, 2020, 07:12: PS on

Monday, June 01, 2020, 07:15: FS#8 opened. Vacuum @ 5.03e-06T.

Monday, June 01, 2020, 07:16: Sources on.

Monday, June 01, 2020, 07:18: Auto-ramping TGHT / TBHT to 300 / 150 A @ 2 A per min. Vacuum limits adjusted:

7.000e-06 Vacuum ok, increment when less than this value.

8.000e-06 Vacuum exceeds, the last increment on TGHT / TBHT is backed off.

Monday, June 01, 2020, 09:17: Halt, adjust. Continue Auto-ramping TGHT / TBHT to 350 / 200 A @ 2 A per min.Vacuum @5.19 e-06T

Monday, June 01, 2020, 10:37: Auto-ramping TGHT / TBHT to 400 / 200 A @ 2 A per min.Vacuum @ 6.29e-06T.

Monday, June 01, 2020, 11:05: Auto-ramping TGHT / TBHT to 450 / 200 A @ 2 A per min.Vacuum @ 6.70e-06T.

Monday, June 01, 2020, 12:18: Tripped* restarted* Auto-ramping TGHT / TBHT to 350 / 150 A @ 4 A per min.Vacuum @ 6.70e-06T.

Tripped as the TGHT / TBHT "good vac" interlock is at 7.30e-06T.

Monday, June 01, 2020, 17:10: Lowered TGHT to 325A to avoid a trip and continue outgassing. Vacuum @ 7.00e-06T.


Tuesday, June 02, 2020, 06:06: Manually tap TGHT up to 350 A.

Tuesday, June 02, 2020, 06:39: Manually tap TGHT up to 375 A.


Wednesday, June 03, 2020, 09:37: Manually tap TGHT up to 400 A. Vacuum, @ 6.68e-06T.

Wednesday, June 03, 2020, 09:44: Manually tap TGHT up to 400 A. Vacuum, @ 6.90e-06T.

Wednesday, June 03, 2020, 10:45: Tripped* restarted* Auto-ramping TGHT / TBHT to 400 / 200 A @ 4 A per min.Vacuum @ 5.53e-06T.


Friday, June 05, 2020, 06:19: Manually tap TGHT up to 425 A. 


Tuesday, June 09, 2020, 19:57: Auto-Cooling from 475 A to 0 A @ 1 A per min. 


Wednesday, June 10, 2020, 06:32: PS off. Ion Gauge off. Turbo pumps off. 

Attachment 1: May_19-20_Leak_check_-_FS#3.docx
Attachment 2: Mess_inside_TS_-_1.jpg
Mess_inside_TS_-_1.jpg
Attachment 3: Mess_inside_TS_-_2.jpg
Mess_inside_TS_-_2.jpg
Attachment 4: Block_water_leak_visible.jpg
Block_water_leak_visible.jpg
  809   Wednesday, August 19, 2020, 08:52 Aaron Schmidt       Leak check / Troubleshoot

Wednesday, August 19, 2020, 08:52: Purging all lines, except FS#5, It was already purged / closed.

Wednesday, August 19, 2020, 11:24: Vacuum @ 1.76e-06T.

Wednesday, August 19, 2020, 11:29: FS#2 opened. Observable vacuum spike noted. vacuum @ 2.2e-06T. Purge & Close.

Wednesday, August 19, 2020, 11:34: Vacuum @  1.76e-06T.

Wednesday, August 19, 2020, 11:36: FS#3 opened. Vacuum  @ 1.74e-06T.

Wednesday, August 19, 2020, 11:44: Vacuum @  1.67e-06T.

Wednesday, August 19, 2020, 11:47: FS#4 opened. Vacuum @ 1.65e-06T

Wednesday, August 19, 2020, 11:51: No spike observed

Wednesday, August 19, 2020, 11:52: Turbo Pumps off. To vent for Leak check w/ LD & He.


Thursday, August 20, 2020, 11:26: Blanked off & connected feed through (C) & (D) individually. Both to 120 PSI individually w/ He. No leak detected. 

Thursday, August 20, 2020, 11:35: Roughing.

Thursday, August 20, 2020, 13:00: TP1B started.

Thursday, August 20, 2020, 13:09: Before opening back valve w/ LD:

LD: 0.0e-09 atm-cc/sec

Thursday, August 20, 2020, 13:10: Opened valve.

LD: 2.2e-07 atm-cc/sec & Dropping. Likely left over from the lines initial tests. Vacuum @ 3.2e-04T & dropping.

Thursday, August 20, 2020, 13:17: 120 PSI of He on line (D) TGHT left side.

 LD: 1.3e-07 atm-cc/sec & Dropping. Vacuum @ 2.09e-04T & dropping.

Thursday, August 20, 2020, 13:27: LD: 1.0e-07 atm-cc/sec & Dropping. Vacuum @ 1.27e-04T & dropping. Disconnect He up top.

Thursday, August 20, 2020, 13:40: LD: 1.2e-07 atm-cc/sec. Vacuum @ 9.95e-05T & dropping. Connected He up top to line (C) TGHT right side.

Thursday, August 20, 2020, 13:43: 120 PSI on line. Spike occurring on TSG CG1A & TSG:CG1 B.

Thursday, August 20, 2020, 13:53: LD: 2.0e-07 atm-cc/sec. Vacuum @ 7.57e-05T & dropping. Gradual increase on leak rate for line (C)


Tuesday, August 25, 2020, 07:07: Beam line side of the TS tripped? Open BV6 & BV2.

Tuesday, August 25, 2020, 07:15: Beam line side TP6 & TP2 on.

Tuesday, August 25, 2020, 07:16: Venting Chamber side

Tuesday, August 25, 2020, 15:39: Aluminum water loop block installed. Roughing.

Tuesday, August 25, 2020, 19:11: Turbo pumps TP1A & TP1B on.

Tuesday, August 25, 2020, 19:13: TP1A off to avoid a trip.

Tuesday, August 25, 2020, 19:50: TP1A on. BV1A Bypass on 

Tuesday, August 25, 2020, 19:58: Ion gauge on. 


Wednesday, August 26, 2020, 06:15: BV1A Bypass off.


Multiple checks done on right TGHT (C) in the cold lab. Inconclusive leak detection

Reconnect He & LD to TS. TGHT (C) with Loop block in place.

Thursday, August 27, 2020, 08:09: Vacuum @ 1.49e-06T

Thursday, August 27, 2020, 08:11: Before opening back valve w/ LD:

LD: 0.0e-09 atm-cc/sec

Thursday, August 27, 2020, 08:13: Opened valve behind TP1B.

Thursday, August 27, 2020, 08:16:

LD: 0.0e-09 atm-cc/sec. Vacuum @ 1.49e-06T.

Thursday, August 27, 2020, 08:18: 120 PSI of He on line (C) TGHT Right side w/ loop block.

Thursday, August 27, 2020, 08:21: LD:  0.0e-09 atm-cc/sec. Vacuum @ 1.49e-06T.

Thursday, August 27, 2020, 08:31: Increase /  bump noted on LD

Thursday, August 27, 2020, 08:34: LD: 1.4e-08 atm-cc/sec. Slowly increasing. Vacuum @ 1.49e-06T.

Thursday, August 27, 2020, 08:39: LD: 4.0e-08 atm-cc/sec. Slowly increasing. Vacuum @ 1.49e-06T.

Thursday, August 27, 2020, 08:42: Closed Valve behind TP1B. Purge He.

Thursday, August 27, 2020, 10:02: Ion gauge off. Turbo pumps off.

Thursday, August 27, 2020, 11:04: Venting:

Removed loop block. Polished/Cleaned seat surface to remove 2 scratches. Applied no o-rings w/ vacuum grease. Pressurized with 120 PSI on the line w/ sniffer. No leak detected.

Thursday, August 27, 2020, 13:44: Roughing.

Thursday, August 27, 2020, 13:46: BV1A opened.

Thursday, August 27, 2020, 17:39: TP1B on.

Thursday, August 27, 2020, 17:52: TP1A on 


 

Tuesday, September 01, 2020, 07:44: Vacuum @ 8.23e-07T

Before opening back valve w/ LD: 0.0e-09 atm-cc/sec

Tuesday, September 01, 2020, 07:46: Opened valve behind TP1B.

Tuesday, September 01, 2020, 07:57: LD: 0.0e-09 atm-cc/sec. Vacuum @ 8.23e-07T.

Tuesday, September 01, 2020, 07:59: 120 PSI of He on line (C) TGHT Right side w/ loop block.

Tuesday, September 01, 2020, 08:20: LD:  0.0e-09 atm-cc/sec. Vacuum @ 8.16e-07T.

Tuesday, September 01, 2020, 08:21: Random Spike? Vacuum remained the same, however the LD jumped from 0.0e-09 atm-cc/sec to the mid-e-08 atm-cc/sec range. Literally for a couple seconds, then back to 0.0e-09 atm-cc/sec.

Odd, couple more random spikes.

Tuesday, September 01, 2020, 08:24: Closed valve behind TP1B to see if the spikes continue.

Tuesday, September 01, 2020, 08:34: Opened the TP1B valve. Immediate spike from 0.0e-09 atm-cc/sec to 2.2e-08 & 7.9e-08 atm-cc/sec noted.

Tuesday, September 01, 2020, 08:36: Close the valve behind TP1B. LD off.

Tuesday, September 01, 2020, 14:00:

New tubing installed.

Blue on FS#4 loop (A)(B)

Yellow on FS#2 Loop (C)(D)

Vacuum @ 8.30e-07T

Tuesday, September 01, 2020, 14:04: Opened FS#4 Vacuum stable @ 8.30e-07T.

Tuesday, September 01, 2020, 14:06: Opened FS#2 Vacuum stable @ 8.30e-07T.

Tuesday, September 01, 2020, 14:36: Closed FS#2 but not purged.. Vacuum stable @ 8.23e-07T.


Wednesday, September 02, 2020, 07:26: Ion gauge & Turbo pumps off. 

Wednesday, September 02, 2020, 08:50: Venting.

Install right TGHT (C)(D) line. Install FEBIAD. Clean out odd buildup / powder beneath optics tray.

Wednesday, September 02, 2020, 10:48: Roughing.

Wednesday, September 02, 2020, 11:19: TP1B on.


Thursday, September 03, 2020, 11:00: Vacuum @ 1.05e-06T. Waterlines are to be opened.

Thursday, September 03, 2020, 11:03: Opened FS#2. Vacuum Stable @ 1.03e-06T.

Thursday, September 03, 2020, 11:05: Opened FS#3. Vacuum Stable @ 1.03e-06T.

Thursday, September 03, 2020, 11:06: Opened FS#4. Vacuum Stable @ 1.03e-06T.

Thursday, September 03, 2020, 11:08: Opened FS#5. Vacuum Stable @ 1.03e-06T.

Thursday, September 03, 2020, 11:23: Vacuum remains stable @ 1.03e-06T.. PS on. Auto-ramp TGHT / TBHT to 350 / 150 A @ 2 A per min.

 

 

Attachment 1: Aug_19_-_2020_Leak_Check..docx
  818   Monday, November 02, 2020, 08:52 Aaron Schmidt      Problems/SolutionsLeak check / Troubleshoot

Monday, November 02, 2020, 08:46:

Large Vacuum spike noted 5:30 approx. Tripped TS. On tail end of the Nb#9 conditioning run. HV & heating were completed last week

Monday, November 02, 2020, 08:47: Vacuum @ 2.66e-06T.

Monday, November 02, 2020, 08:50: Closed and purged all the TS waterlines. Vacuum dropped to 1.31e-06T and continues to drop.

Monday, November 02, 2020, 08:59: Vacuum @ 1.05-06T.

Monday, November 02, 2020, 09:00: FS#5 opened. No response on vacuum.

Monday, November 02, 2020, 09:05: Vacuum @ 1.05e-06T.

Monday, November 02, 2020, 09:07: FS#2 opened. No response on vacuum.

Monday, November 02, 2020, 09:12: Vacuum @ 9.98e-07T.

Monday, November 02, 2020, 09:13: Opened FS#3. No response on vacuum.

Monday, November 02, 2020, 09:19: Vacuum @ 9.96e-07T.

Monday, November 02, 2020, 09:21: Opened FS#4. Immediate vacuum spike noticed. 1.69e-06T and climbing.

Monday, November 02, 2020, 09:26: Closed & purged all the waterlines. Vacuum dropped back down to 9.97e-07T.

Monday, November 02, 2020, 09:27: IG1 off. Turbo pumps off.


Tuesday, November 03, 2020, 10:10: Indium gasket on FS#4 checked w/ sniffer / LD w/ He. ok.

Tuesday, November 03, 2020, 10:30: 120 PSI on line FS#4 feed through (A) Center - TBHT. 0.0E-07 atm-cc/sec.

Tuesday, November 03, 2020, 10:45: LD @ 0.0E-07 atm-cc/sec. Purge the line.

Tuesday, November 03, 2020, 10:51: 120 PSI on line FS#4 feed through (B) Sides - TBHT. 0.0E-07 atm-cc/sec.

Tuesday, November 03, 2020, 11:08: LD @ 0.0E-07 atm-cc/sec. Purge the line.

Tuesday, November 03, 2020, 11:12: 120 PSI on line FS#4 feed through (A) Center - TBHT. 0.0E-07 atm-cc/sec.

Tuesday, November 03, 2020, 11:20: Purge lines. Leak not found w/ LD-Sniffer.

Tuesday, November 03, 2020, 11:30: Roughing.

Tuesday, November 03, 2020, 12:24: TP1B on. 

Tuesday, November 03, 2020, 13:04: TP1A & IG1 on. 

Tuesday, November 03, 2020, 14:26: LD: 0.0E-09 atm-cc/sec. Vacuum @ 1.75e-05T

Tuesday, November 03, 2020, 14:26: Open to the chamber. LD: 2.6E-07 atm-cc/sec. Vacuum @ 1.66e-05T.

Tuesday, November 03, 2020, 14:29: Purged FS#4 w/ HPA.

Tuesday, November 03, 2020, 14:33: LD: 2.5E-07 atm-cc/sec. Vacuum @ 1.59e-05T.

Tuesday, November 03, 2020, 14:38: Connect 120 PSI on line FS#4 feed through (A) Center - TBHT. LD: 2.3E-07 atm-cc/sec. Vacuum @ 1.59e-05T.

Tuesday, November 03, 2020, 14:58: LD: 2.1E-07 atm-cc/sec. Vacuum @ 1.40e-05T. Purge line.

Tuesday, November 03, 2020, 15:02: Connect 120 PSI on line FS#4 feed through (B) Sides - TBHT. 2.2E-07 atm-cc/sec. Vacuum @ 1.31e-05T.

Tuesday, November 03, 2020, 15:22: LD: 2.7E-07 atm-cc/sec. Vacuum @ 1.24e-05T. Purge line.

Tuesday, November 03, 2020, 15:27: Disconnected LD. Disconnected HE. Purged FS#4 w/ HPA. Test again in the morning. FS#4 - B appears to be the source of the leak.


Wednesday, November 04, 2020, 08:35: LD: 0.0E-09 atm-cc/sec. Vacuum @ 2.40e-06T

Wednesday, November 04, 2020, 08:37: Open to the chamber. LD: 1.8E-08 atm-cc/sec. Vacuum @ 2.40e-06T.

Wednesday, November 04, 2020, 08:41: Connect 120 PSI on line FS#4 feed through (A) Center - TBHT. LD: 1.4E-08 atm-cc/sec. Vacuum @ 2.40e-06T.

Wednesday, November 04, 2020, 08:46: LD: 1.4E-08 atm-cc/sec. Vacuum @ 2.40e-06T.

Wednesday, November 04, 2020, 08:51: Connect 120 PSI on line FS#4 feed through (B) Sides - TBHT. 1.5E-08 atm-cc/sec. Vacuum @ 2.40e-06T.

Wednesday, November 04, 2020, 09:01: LD: 3.0E-08 atm-cc/sec. Vacuum @ 2.31e-06T.

Wednesday, November 04, 2020, 09:07: Disconnected LD. Flushed lines w/ HPA. Vacuum @ 2.31e-06T.

Wednesday, November 04, 2020, 09:10: Open FS#2 & FS#3. Vacuum @ 2.33e-06T. Ok.

Wednesday, November 04, 2020, 09:11: Opened FS#4. Vacuum @ 2.42e-06T.

Wednesday, November 04, 2020, 09:18: Vacuum @ 2.42e-06T.

Wednesday, November 04, 2020, 09:19: IG1 & turbo pumps off. Purge waterlines.

Wednesday, November 04, 2020, 10:28: Venting.

Opened / inspected water block (B) and the line. ok. Swap out O-rings w/ new ones w/ vacuum grease.

Wednesday, November 04, 2020, 12:06: Roughing.

Wednesday, November 04, 2020, 12:57: TP1B on. 

Wednesday, November 04, 2020, 13:06: TP1A on. 

Wednesday, November 04, 2020, 13:16: IG1 on. 

Wednesday, November 04, 2020, 15:54: Vacuum @ 4.37e-06T.

Wednesday, November 04, 2020, 15:56: Opened FS#2 & FS#3. Vacuum @ 4.29e-06T. OK.

Wednesday, November 04, 2020, 15:59: Opened FS#4. Vacuum @ 4.29e-06T.

Wednesday, November 04, 2020, 16:12:  Vacuum @ 4.02e-06T & dropping.


Friday, November 06, 2020, 06:02: Vacuum @ 1.34e-06T ok. IG1 off. Turbo pumps off. 

 

 

 

Attachment 1: Nov-2-2020_Leak.docx
  739   Wednesday, June 26, 2019, 14:41 Carla Babcocknone     Problems/SolutionsIssues with test stand wiring in service cap area

The wiring on the top of the test stand was burned, see entry 737.

Probable cause of this is as follows:

Coil lines are connected by a wire to HV common, the 9-pin feedthrough etc to maintain same voltage on all the insulator tops. This is also directly connected to the extraction electrode spark gap. When this sparks, it momentarily changes the potential in that line (normally HV common) which then can make this path the best route for current from the coil to return to ground.

See attached diagram.

 

Best solution to this problem is to disconnect the high current section from the low current section, and attach each separately to HV common.

Other possible improvements to wiring:

1. Remove jumpers between positive coil lines (and neg. coil lines) since these feethroughs are physically connected by the copper pipe.

2. Add a resistor to the jumper between coil - and TBHT - since this will eliminate all possibility of current flowing between the two.

3. Add a resistor in line where the high current section is connected to HV common to avoid possibility of current going through jumpers.

Attachment 1: isk4523d_ITSrewiring_June2019.png
isk4523d_ITSrewiring_June2019.png
  600   Wednesday, July 19, 2017, 09:13 Aaron SchmidtTa Targets     DoneIon Peaks

Attached is a recent list of Ta targets with their extracted ions peaks.

Attachment 1: Magnet_peaks.xlsx
  82   Thursday, May 10, 2012, 09:48 Anders Mjos      Problems/SolutionsIon Gauge filament replaced

Anders Mjos wrote:

Anders Mjos wrote:

Anders Mjos wrote:

 TSGIG1 has timed out. As seen on the attached screen shot, the IG has been out since 17h May 1st.

 Wednesday, May 09, 2012, 09:15: ISAC Fault Report submitted

 Thursday, May 10, 2012, 08:12: Venting vacuum chamber for Edi - to repair the Ion Gauge.

Thursday, May 10, 2012, 08:45: Vented.

 Thursday, May 10, 2012, 09:38: Ion Gauge filament replaced by Edi.

Thursday, May 10, 2012, 09:48 : Pumping down.

Thursday, May 10, 2012, 10:17: Ion Gauge reading vacuum at 1.3 E-5 torr.

  77   Friday, April 20, 2012, 08:56 Anders MjosNb#6LP-SISITWTM1  Problems/SolutionsInsulator stand-off failure

 When the target was removed from the test stand it was discovered that the custom designed insulator stand-off (ITD0400 made from Mycroy 1100) had swollen and become discoloured in the area exposed to "heat shine" from the target oven. See attached pdf for photos of the insulators.

The heat shield lid was opened up and the target temporarily removed to replace the two insulators that had failed. These were replaced with the commercially available glazed steatite stand-offs. The target had some marks from the insulators which was cleaned with acetone and methanol.

After replacing the insulators, the target assembly was assembled, leak checked and a new electrical check was performed.

 

Additional photos are available on DocuShare

Attachment 1: ITW-TM1-Nb#6-LP-SIS_-_TestStand.pdf
ITW-TM1-Nb#6-LP-SIS_-_TestStand.pdf
  197   Friday, September 07, 2012, 14:34 Anders MjosNb#7LP-SISITWTM1  Problems/SolutionsInsulator ITD0342 overheated - swelling

 See attached photo

Attachment 1: Nb#7_swelling_insulator.pdf
Nb#7_swelling_insulator.pdf
  430   Thursday, February 26, 2015, 10:11 Anders Mjos      In progressInstalling FEBIAD test target for emittance rig tests

Thursday, February 26, 2015, 10:11: Stopped turbos

Thursday, February 26, 2015, 11:23: Venting

Thursday, February 26, 2015, 11:39: Stopped venting at 550 T. To be continued later

Thursday, February 26, 2015, 15:46: Started roughing. Doors needed a push.

Thursday, February 26, 2015, 16:23: Started turbos

Thursday, February 26, 2015, 16:39: Turbos at speed. Vacuum at 5.2E-6 T


Friday, February 27, 2015, 09:22: Water on. Vacuum stable at 1.6E-7 T

Friday, February 27, 2015, 09:30: RGA on

Friday, February 27, 2015, 10:32: HV on. Ramping to TBHT 250 A at 4A/min

Friday, February 27, 2015, 16:38: Source off


Monday, March 02, 2015, 14:00: Gas lines purged. Opening.

Fixed a air leak on one of the Swagelok joints.

Monday, March 02, 2015, 14:47: RGA with Ne Open

Total 3.5E0-7T, IG1 9.7E-8 T
20Ne 6.3E-10 T
22Ne 1.7E-10 T

Mass 18 1.6E-7 T


Tuesday, March 03, 2015, 09:58: Started heating

Tuesday, March 03, 2015, 16:33: Finished ER testing. First ER scans made on mass 4.


Wednesday, March 04, 2015, 14:32: TSG:CB1 found off. Switched back on.

Emittance vs EE voltage studied


Thursday, March 05, 2015, 09:02 : Ramping source back up to 285 A (TBHT)

Thursday, March 05, 2015, 15:12: The following devices were found off

TMS:Q6
TMSQ1
TPS:CBC


Friday, March 06, 2015, 08:51: Found TPS:Q3 off. Switched back on.

Friday, March 06, 2015, 10:51 : Ramping down source

Friday, March 06, 2015, 12:08 : Source and HV off. Closed IV.

Graham will be doing some controls work


Monday, March 09, 2015, 09:16: Ramping up the source. IV opened

Monday, March 09, 2015, 09:23: Source biased and optics tune recovered.

Monday, March 09, 2015, 16:51: Opened Ne leak


Wednesday, March 11, 2015, 09:06: Found TMS:Q6/Q1 and TPS:Q4 off. Switched back on.


Thursday, March 12, 2015, 16:57: Finished more ER data taking. See attached spreadsheet


Friday, March 13, 2015, 08:41 : TMS:CBC1, TMS:CB5, TMS:Q2, TPS:Q3, TPS:CB2 found off. Switched back on.


Monday, March 16, 2015, 09:13: TMS:CBC1, TMS:Q3, Q2, TMS:VCB1,CB1 found off.

Monday, March 16, 2015, 09:14: Bias off. Stopping turbos

Monday, March 16, 2015, 15:26: Venting

Attachment 1: ER_Test_w_FEBIAD.docx
Attachment 2: FebiadTS.xls
  207   Thursday, September 20, 2012, 15:52 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

  208   Friday, September 21, 2012, 08:20 Anders MjosTEST SiCHP-FEBIAD    In progressInstallilng SiC-HP-FEBIAD target for operator training

Anders Mjos wrote:

Thursday, September 20, 2012, 15:50: Roughing

Thursday, September 20, 2012, 15:54: Aborting. VCR for gas line not connected.

Thursday, September 20, 2012, 16:09: Roughing

Thursday, September 20, 2012, 16:29: Starting turbos

Thursday, September 20, 2012, 16:38 : Turbos at speed

Thursday, September 20, 2012, 16:39 : Vacuum at 1.3E-5 torr

 

 Friday, September 21, 2012, 08:19: Cooling water on. Vacuum stable at 2.3E-7 torr.

  451   Monday, June 22, 2015, 15:49 Anders Mjos      In progressInstalled new 9-pin feed through

No wires connected yet.

Monday, June 22, 2015, 15:48: Roughing


Tuesday, June 23, 2015, 09:05: Roughing vacuum does not go below 0.9 T. Venting to investigate.

Tuesday, June 23, 2015, 10:16: Turbos started at 0.9 T

Tuesday, June 23, 2015, 10:276: Turbos at speed. Vacuum at 7.5E-4 T

Tuesday, June 23, 2015, 10:32: Stopped turbos

Tuesday, June 23, 2015, 11:01: Venting

Tuesday, June 23, 2015, 11:22: Roughing

Tuesday, June 23, 2015, 13:37: Venting

Tuesday, June 23, 2015, 16:48: Leak found on the newly installed f/t.


Wednesday, June 24, 2015, 09:29: Venting

Replaced f/t with a blank off.Installed TM2 FEBIAD test target

Wednesday, June 24, 2015, 10:31: Roughing

Wednesday, June 24, 2015, 11:07: Started turbos.

Wednesday, June 24, 2015, 11:17: Turbos at speed. Vacuum at 3.3E-5 T


Thursday, July 09, 2015

Installed the fixed f/t.

Attachment 1: 9-pin_feed_through.jpg
9-pin_feed_through.jpg
  445   Thursday, May 21, 2015, 17:38 Anders Mjos      Problems/SolutionsInstalled equipment for measuring outgassing rate

 A gauge and a valve was installed on the roughing line to the large turbo pump

  724   Saturday, May 25, 2019, 12:43 Aaron SchmidtTest FEBIAD / TM4LP-FEBIAD TM4395530-342752-5In progressInstalled TM4 Source Tray

Silver bolts on TGHT & Coil Lines. Oxide steel bolts on TBHT. Filed target to suit / fit (Previously heated). Rubber O-rings used instead of C-seals on the water blocks.

Saturday, May 25, 2019, 12:38: Leak check ok. 0.0E-07 Torr-I/sec. He @ 30 PSI. Carla checked the multi-pin connection. OK.

Saturday, May 25, 2019, 12:46: Roughing.

Saturday, May 25, 2019, 14:30: Turbo pumps started.

Saturday, May 25, 2019, 14:34: Ion gauge on.


Monday, May 27, 2019, 07:09: RGA on.

He Leak TEST #1:

Vacuum Group Leak detector LD#4.

08:39: Vacuum @ 1.58e-06T

LD Base line before opening valve to turbo pumps: 0.0e-09 atm-cc/sec

08:40: LD baseline after opening valve to turbo pumps: 3.7e-10 atm-cc/sec

Full open base:

Vacuum @ 1.60e-06T. RGA status:

Water: 2.36e-006

He: -1.05e-009

LD:  3.4e-07 atm-cc/sec

Monday, May 27, 2019, 08:50: Open line FS#2 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:00: Vacuum @ 1.60e-06T . RGA status:

Water: 2.33e-006

He: -4.89e-010

LD: 3.4e-07 atm-cc/sec. Purge and close FS#2.

Monday, May 27, 2019, 09:05: Open line FS#3 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:15: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted)

Water: 2.29e-006

He: -4.19e-009

LD: 3.6e-07 atm-cc/sec. Purge and close FS#3.

Monday, May 27, 2019, 09:26: Open line FS#4 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:35: Vacuum @ 1.58e-06T. RGA status: (Small He Spikes noted, continued from FS#3)

Water: 2.25e-006

He: -7.36e-009

LD: 4.0e-07 atm-cc/sec. Purge and close FS#4.

Monday, May 27, 2019, 09:45: Open line FS#5 . Pressurize to 30 PSI. Record after 10 minutes

Monday, May 27, 2019, 09:55: Vacuum @ 1.58e-06T. RGA status:

Water: 2.21e-006

He: -3.16e-010

LD:   4.2atm-cc/sec. Purge and close FS#5

Monday, May 27, 2019, 10:00: Depressurize lines. Connect HPA & Purge all lines. 

After 5 minutes: Vacuum @ 1.58e-06T . RGA status:

Water: 2.20e-006

He: -5.73e-010

LD: 4.3e-07 atm-cc/sec

Close Valve & disconnect LD. HE LEAK TEST COMPLETE


Note: He spikes ongoing after opening line FS#3. Likely due to the use of rubber o-rings.

Monday, May 27, 2019, 10:51: Begin gradually opening the waterlines.

Monday, May 27, 2019, 10:54: Open FS#2. Vacuum @ 1.56e-06T. No Response on RGA.

Monday, May 27, 2019, 10:56: Open FS#3. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:00: Keiko stopped by. Soft restart done on PLC.

Monday, May 27, 2019, 11:04: Open FS#4. Vacuum @ 1.58e-06T. No Response on RGA.

Monday, May 27, 2019, 11:06: Open FS#5. Vacuum @ 1.58e-06T. No Response on RGA.

Waterlines Ok.

Prep to open gas lines.

Monday, May 27, 2019, 11:24: SV1 open w/ mini pump. Vacuum @ 1.49e-06T. No Response on RGA.

Monday, May 27, 2019, 11:25: Open SV3 & SV4 w/ mini pump. Vacuum @ 1.58e-06T. No Response on RGA. Allow 10 min.

Monday, May 27, 2019, 11:35: Mini pump switched off. SV1 Closed.

Monday, May 27, 2019, 11:37: Begin quickly opening and closing gas lines until the a stable vacuum is reached.

Monday, May 27, 2019, 11:40: Gas lines: SV3, SV4, & SV5 open.

Monday, May 27, 2019, 13:29: Power / Sources on.

Monday, May 27, 2019, 13:30: Auto ramping TGHT / TBHT to 350 / 150 A @ 2A per min. Vac limit increased to 3.000e-06T for out gassing.

Monday, May 27, 2019, 13:44: Open IV4.


Tuesday, May 28, 2019, 07:10: Gradually bring up HV to BIAS / EE / EZL @ 30 / -1.5 / 13.5 kV in increments of 500 / 100 / 250

Tuesday, May 28, 2019, 07:22: Halted and brought back down. BIAS / EE / EZL @ 10 / -0.2  / 8.5 kV. Unusual current noticed on the EE. Only went to -200 V and the current increased to 1300uA. Typically at -1500V the current sits at 515uA.

Tuesday, May 28, 2019, 09:21: 50V added top Anode. EE current increases to 310.134uA. Odd. EE voltage increases affect the Anode current as well.

Tuesday, May 28, 2019, 09:22: Auto-cooling @ 4A per min.

Tuesday, May 28, 2019, 11:15: Power off. Gas lines closed.

Tuesday, May 28, 2019, 11:36: Connection discovered between Anode & EE. (Inside Vacuum). RGA off. IV4 closed.

Tuesday, May 28, 2019, 11:38: IG1 off. Turbos off.

Tuesday, May 28, 2019, 12:40: Venting

Tuesday, May 28, 2019, 15:02:

Short found on EE to Anode. Wires touching inside chamber. Fixed. Tubes touched to coil. No longer touching. Electrical check of source tray complete. Target re-installed.

Roughing.

Attachment 1: TM4_Source_Tray_-_2019_-_Leak_Check.docx
Attachment 2: TM4_Source_Tray_-_2019.docx
Attachment 3: TS-2019-05-27-07-08.rga
  961   Thursday, April 13, 2023, 11:07 Aaron Schmidt      In progressInstallation of new IDP-15 TMS:TP2

IDP15 Scroll Pump, Std w/ inlet.

TMS:RP2

PN: X3815-64010

Serial: MY2301SA17

Thursday, April 13, 2023, 11:04: Roughing RP2

Thursday, April 13, 2023, 11:05: Open BV6 & BV2

Thursday, April 13, 2023, 11:15: TMS:TP2 & TMS:TP6 on.

Thursday, April 13, 2023, 11:19: IG6 on.

Thursday, April 13, 2023, 12:05: Vacuum @ 1.43e-05T.

  283   Tuesday, March 19, 2013, 12:34 Anders MjosSiC#28 ITETM4  DoneInstallation of SiC#28 LP-RFQ

Tuesday, March 19, 2013, 12:32 : Turbos off (vaccum at 2E-7 Torr)

Tuesday, March 19, 2013, 13:35: Venting

Target SiC#28 LP-RFQ inserted

New bolts used. Old bolts removed.

All bolts torqued to 120 in lbs


By Sebastian (SR) & Henning

modification of 9 Pin connector needed to match wiring in TM4 (see separate e-log entry)

Tuesday, March 19, 2013, 18:32 : started roughing - SR

Tuesday, March 19, 2013, 18:52: started turbos - SR

Tuesday, March 19, 2013, 18:57: TSGIP1 on - SR

Tuesday, March 19, 2013, 19:00: turbos at speed - SR

Tuesday, March 19, 2013, 19:02: vacuum at 1.68E-5T


By Anders

Wednesday, March 20, 2013, 08:18: Opened cooling water. Vacuum stable at 6.8E-7 Torr


By Sebastian (SR) & Henning

Wednesday, March 20, 2013, 11:39: 9PIN connector in HV cage connected

        4,5,6,9 on GND 1,2 to RF, 7,8,RFoffest,Source for now also on GND

        RF: 800kHz, 20Vampl, 0.128mA

        HV cage locked up for heating

Wednesday, March 20, 2013, 16:42: heating is taken care of by ISAC operations, now at 300A / 3V TGHT  and 250A / 1.47V TBHT reading on the panel is really close

        Friedhelm restarted some of the CANBUS ports, since not all optics were working properly

Thursday, March 21, 2013, 10:53 start cooling down

       Vacuum not perfect was around 2E-6T, over nigth not full current

       Suppression tested yesterday: full beam (SRC +3V, others GND) was 40nA, while no signal on FB0B with SRC +3V, IGOffset&Exit +25V

       !!!!! but short on #7 --> 2nd Repeller, was OK when tested, after some minutes on 25V short was there, reading now (Thursday, March 21, 2013, 10:58 ) <1OHM, will be checked while heating down

       Magnet had wrong polarity - so no mass scans yesterday evening, Friedhelm looked into this this morning

      Mass scan only for good transmission mode (SRC +3V) this morning - see attached scan (seen Na, Al, K, Ca, Cr, Rb, Sr, Cs and Ba)

Thursday, March 21, 2013, 12:26: stopped turbos

     #7 still short

 


By Anders

Thursday, March 21, 2013, 13:25: Venting

Attachment 1: grab.n5HwXJ.png
grab.n5HwXJ.png
Attachment 2: 20130321_heating_and_signal.PNG
20130321_heating_and_signal.PNG
  879   Wednesday, June 09, 2021, 14:31 Aaron SchmidtTa#62LP-SISITETM444139-1044378-4In progressInstall MB1 window & 9 pin for V test.

Installed a new window on MB1 as per Aurelia. Connect modified 9 pin connector & voltage meters for Ta#62 testing.

Ref:

https://elog.triumf.ca/TIS/Test-Stand/679

Pin configuration between top 9-pin connector on Source Tray and terminal in high voltage rack. Measured 2018-08-21 by Aaron and Anders

Grounded     X            
Source Tray Side (looking head on) 1 2 3 4 5 6 7 8 9
High Voltage Cage Side 5 4 3 2 1 9 8 7 6

Wednesday, June 09, 2021, 14:41: Pins connected source tray side: 1, 4, 5, 6

https://elog.triumf.ca/TIS/Test-Stand/721

ST 9-pin                       HV rack

Pin to L TGHT - 1 - Black / COM / 5

Pin to R TGHT - 6 - Red / 9

Pin to L TBHT - 4 - Black / COM / 2

Pin to R TBHT - 5 - Red / 1


Wednesday, June 09, 2021, 14:29: Window installed. Roughing -  Beam line side.

Wednesday, June 09, 2021, 14:41: TP6 on.

Wednesday, June 09, 2021, 14:45: TP2 on.

Wednesday, June 09, 2021, 14:55: Roughing.

Wednesday, June 09, 2021, 16:09: TP1 on.


Thursday, June 10, 2021, 13:25: Power / sources on. FS#5 open.\

TGHT reading ok , TBHT odd? Internal connection.

Thursday, June 10, 2021, 14:45: Turbo pumps off.

Thursday, June 10, 2021, 15:25: Venting.

Thursday, June 10, 2021, 16:16: Fixed TBHT connection. Roughing.

Thursday, June 10, 2021, 16:20: Bypass used. TGHT / TBHT to 40 A each. Multimeter check ok.

Thursday, June 10, 2021, 16:24: TGHT / TBHT to 0 A. Bypass removed.

Thursday, June 10, 2021, 16:43: TP1B on.

Thursday, June 10, 2021, 16:48: TP1A on.

Thursday, June 10, 2021, 16:55: IG1 on


Tests Complete as per Aurelia.

Monday, June 21, 2021, 07:51: Power / sources off. IG1 & IG6 off. All TP off. FS#5 purged.

Monday, June 21, 2021, 09:40: Venting both ends.

Attachment 1: Ta#62_voltage_tests.docx
  40   Tuesday, February 28, 2012, 16:32 Brandon Humphries       Initial settings for FEBIAD on Test Stand

ISAC Test Stand FEBIAD Ion Source and ISACT optics screen grabs before practicing tuning.  Tune saved as: data/febiaddata/tune/120228-1620_0.snap and data/isactdata/tune/120228-1620_0.snap respectively.<br>

Seeing 1.93e-06 on TMS:FC0 and 3.30e-09 on TMS:FC6.

Attachment 1: grab.V13332.png
grab.V13332.png
Attachment 2: grab.m13336.png
grab.m13336.png
  869   Tuesday, April 13, 2021, 13:27 Aaron Schmidt       Indium gaskets installed FS#3

Changed the gaskets from C-seals on FS#3 water blocks E, F,& H. G was already done.

Tuesday, April 13, 2021, 13:23: FS#3 Waterline opened.

Tuesday, April 13, 2021, 13:25: No immediate water noticed visually or on the gloves.

Tuesday, April 13, 2021, 13:31: Visual leak present on (F). Purge the line.

Change the gasket.

Tuesday, April 13, 2021, 14:42: FS#3 Waterline opened.

Tuesday, April 13, 2021, 14:55: No water leak noticed visually or on the gloves.

Tuesday, April 13, 2021, 14:58: Roughing. Will leak check under vacuum tomorrow morning.

Tuesday, April 13, 2021, 16:01: TP1B on. 

Tuesday, April 13, 2021, 20:53: TP1A on. 

Tuesday, April 13, 2021, 20:58: IG1 on. 

 

 

  470   Tuesday, October 13, 2015, 16:04 Anders Mjos      Problems/SolutionsIV4 timed out

Contacted Graham W. (controls) to have a look. It turned out to be a limit switch problem. Removed and reinstalled limit switch solved the time out issue.